2012 MATOC Atch 2 MATOC Seed Project TORFP Cover Ltr.pdf

PDF 44 KB Posted

Attached to
Multiple Award Task Order Contract (MATOC) at Fairchild AFB WA Federal contract opportunity
Solicitation number
FA4620-12-R-B002
Issued by
Department of the Air Force Air Mobility Command

About this file

Atch 2 MATOC Seed Project TORFP Cover Ltr

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Task Order Contract (MATOC) at Fairchild AFB WA, newest first.
File Type Posted
Amendment 03 - Q A.pdf PDF
SOW REVISED 29 May 2012 Repair Fire Sprinklers Corner Tower Stairs.pdf PDF
Appendix B Haz Mat Survey Revised 29 May 2012.pdf PDF
FA4620-12-R-B002 FINAL.pdf PDF
Amendment 01 - 2012 Matoc.pdf PDF
2012 MATOC Atch 8d WD Residential 6Apr12 - Spokane County.pdf PDF
2012 MATOC Solicitation.pdf PDF
2012 MATOC Atch 11 Fairchild AFB Operational Climatic Data Summary.pdf PDF
2012 MATOC Atch 7 Subcontractor Release.pdf PDF
2012 MATOC Atch 5 Past Perf Questionnaire rev 3 May 12.pdf PDF
2012 MATOC Atch 3 MATOC Seed Proj Price Schedule.pdf PDF
2012 MATOC Atch 8b WD Heavy 6Apr12 —
2012 MATOC Atch 10 Fairchild AFB Architectural Compatibility Plan.pdf PDF
2012 MATOC Atch 8c WD Highway 4May12 - Statewide.pdf PDF
2012 MATOC Atch 8a WD Building 6Apr12 - Spokane County.pdf PDF
2012 MATOC Atch 9 Base Design Standards 2012.pdf PDF
2012 MATOC Atch 1 MATOC Specs Rev 3 May 12.pdf PDF
2012 MATOC Atch 4 Past Performance Info 1 May 12.pdf PDF
2012 MATOC Atch 2 Seed Proj 10-0184 SOW Repair Fire Sprinklers Dated 16 Mar 12 with Attachments.pdf PDF
2012 MATOC Atch 5 Past Perf cover letter.pdf PDF
2012 MATOC Atch 6 SOW for Orientation Seminar.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORA

FROM:

SUBJECT

1. Fairch

Towe Sectio

2. The c

(Attac constr

• A sp w

3. The p

4. The to phase

• Ph da su

• Ph th

• Ph of

5. A Not within entire comp

6. Liqui follow

• L

• L

• L

ANDUM FO

92 CONS/LG

110 W. Ent S Fairchild AF

T: Task Order Project G hild AFB invi er Stairs, Bldg on 01000, Par concept for the chment 1) and ruction of, bu

All labor, mate prinkler syste with the above project magnit otal Performa es:

hase I is iden ays to obtain ubmittals othe hase II is iden he work site a hase III is ide f all closeout tice to Procee n 15 days afte ety prior to the letion of Phas dated damage ws.

LDs for Phase LDs for Phase LDs for Phase

DEPA

HEADQUA

FAIRC

R MATOC C

GCB

Street

FB, WA 9901

r Request For

GJKZ 10-0184

ites you to su g 2050, Fairch ragraph 1, of e subject proj d the Governm ut not limited erials, equipm m in building e listed work.

tude is less th ance Period fo ntified as the d approval of th er than those ntified as the and physically entified as the requirements ed (NTP) shal er award of th e issuance of se II work.

es (LDs) shall

I will be asse II will be ass III will be as

ARTMENT

ARTERS 92D

CHILD AIR FO

AMC – Glo

CONTRACTO

1-8568 r Proposal (TO 4, Repair Fire ubmit a propos hild AFB WA the basic MA ject is fully de ment’s 15% c to the followi ment, and dem g 2050 corner han $25,000.

or this task or design and ma he 35% desig for closeout.

physical wor y accomplish e closeout pha s of the basic ll be issued fo he task order a Phase II. NT l apply for Ph essed in the am sessed in the a ssessed in the

T OF THE A

AIR REFUEL

ORCE BASE

obal Reach for Am

ORS

ORFP) under Sprinklers, T sal for Projec A. The projec ATOC Specifi escribed in th conceptual de ing:

molition neces r tower stairw rder is 165 cal aterial submit gn and to prep k phase. It ha the work.

ase. It has a du MATOC con or each phase and receipt of TP for Phase I hase I through mount of $16 amount of $20 amount of $1

AIR FORCE

LING WING

WASHINGTO

merica r the MATOC Tower Stairs, ct GJKZ 10-0 ct is a “Design ications.

he attached St esign. The wo ssary for the c wells; and all g lendar days, b ttals phase. It pare, submit a as a duration o duration of 30 ntract.

e of work. NT f bonds. Phas III will be issu h III. Breakdo

67.00 per cale

02.00 per cal

172.00 per ca

E

(AMC) F

ON

C:

Bldg 2050, F

184, Repair F n Build” effor tatement of W ork consists o construction o general requir broken into th t has a duratio and receive ap of 60 calenda calendar day

TP for Phase I se I must be c ued upon sub owns for each endar day.

endar day.

alendar day.

FA4620-12-R

Attachm

3 May

Fairchild AFB

Fire Sprinkler rt as specified

Work (SOW) of 35% design of the fire rements assoc hree distinct on of 75 calen pproval on all ar days to occu ys for complet

I will be issue completed in bstantial h phase are as

-B002 ment 2 y 2012

B WA

rs, d in n and ciated ndar l upy tion ed its s

FA4620-12-R-B002, Attachment 2 TORFP GJKZ 10-0184, Repair Fire Sprinklers B2050

7. The successful offeror will be required to submit a performance and payment bond in the amount of

100% of the task order price within ten (10) calendar days after task order award. A bid bond is required per solicitation Section I, FAR 52.228-1, Section H.1.19, and Section L 2.3.2.

8. The “Building” Wage Determination for Spokane County (Attachment 8a) as referenced in the basic solicitation is applicable to this project.

9. The Superintendent/QC responsibilities may be combined. QC requirements must be met per solicitation Attachment 9, Fairchild AFB Base Design Standards, Division 01, Section 014000.

10. A pre-proposal site visit will be held as specified in the solicitation. See Section L, FAR 52.236-27.

11. Proposals shall be submitted to this office in accordance with the Section L of the solicitation and evaluated for award in accordance with Section M of the solicitation.

12. Price proposal shall consist of completing the Government provided price schedule (MATOC Attachment 3).

13. If you have any questions, please contact 2Lt Conner Van Fossen at (509) 247-4885, conner.vanfossen.4@us.af.mil or MSgt Jeremy Howard at (509) 247-2072, jeremy.howard.2@us.af.mil.

RICHARD A. HEDRICK

Contracting Officer

Attachments:

2A – Statement of Work dated 16 March 2012

- SOW Appendix A – As-Built Drawings

- SOW Appendix B – Hazardous Materials Survey

- SOW Appendix C – Photos of Stairwell

File details come from the government source that posted it. Updated .