This is a Questions and Answers document for federal contract opportunity FA461326R0008, a tree removal and disposal service requirement. The solicitation involves the removal and off-base disposal of 20 cottonwood trees on a military installation, with a 60-calendar-day performance period anticipated to begin in the first week of October. This is a brand-new requirement with no incumbent contractor.
Key contractual details include: tree removal costs are determined by height and size per the Performance Work Statement; all trees are cottonwood species; contractors bear full responsibility for debris disposal off-base using economical methods of their choosing; site visits are optional and not required for quote acceptability; contractors must furnish all traffic control devices and personnel for any tree removals requiring temporary lane closures, with 14-calendar-day notification required for road closures; some trees are located near overhead/underground utilities and historic structures, requiring contractor responsibility for safe operations and damage liability covered by the contractor's insurance; base access requires short-term badging with a minimum three-business-day lead time, subject to Security Forces background checks; no confined space entry is required; and anticipated work classification is Laborer, Grounds Maintenance under Service Contract Act Wage Determination 2015-5405, though contractors may select the most economical approach. Offerors had opportunity to attend a pre-bid site visit, with attendees documented on a separate sign-in sheet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 02.pdf | ||
| Conformed Copy.pdf | ||
| Amendment 01.pdf | ||
| Amendment 01.pdf | ||
| Conformed Copy.pdf | ||
| Atch 5 Questions and Answers.pdf | ||
| Solicitation - FA461326R0008.pdf | ||
| Atch 3 Contractor Safety Guide.pdf | ||
| Atch 2 Environmental Spec.pdf | ||
| Atch 4 SCA 2015-5405 27 Aug 2026.pdf | ||
| Atch 1 PWS 9 Sep 2026.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA461326R0008 Tree Removal and Disposal Questions and Answers:
1. Is there a site map or list identifying the specific location of each of the 20 trees referenced in the PWS?
Govt’s Answer: No. Opportunity for a site visit was provided to interested offerors. The factor in determining tree removal and disposal costs rest on the height and the size of the tree as noted in the PWS.
2. What species are the 20 identified trees?
Govt’s Answer: Cottonwood Trees.
3. Is there a designated on-base disposal site for tree debris, or must the contractor haul debris off base?
Govt’s Answer: Contractor is responsible for full tree removal and disposal off base, at the most economical way of their choosing.
4. Are any of the 20 trees located near overhead or underground utilities, power, water, or fiber lines?
Govt’s Answer: Yes. Contractor shall be responsible for safely cutting trees and disposal at the appropriate site.
5. Are any of the 20 trees located near historic structures or documented cultural sites requiring special handling?
Govt’s Answer: Yes. Contractor shall be responsible for the protection of surrounding areas, especially around historic facilities. Any damage caused to these facilities shall be the responsibility of the contractor as covered by the company’s liability insurance.
6. How many contractor personnel will need base access badging, and what is the required lead time for that request?
Govt’s Answer: Awardee will be provided a short term badge (minimum lead time of three business days) for completion of the service within 60 calendar days. The number of contractor personnel assigned to the requirement is controlled by the contractor. Security Forces completes a general background check and if personnel does not pass a background check, they will not be able to access the base and are not authorized to work this service.
7. Will any of the removals require entry into a permit-required confined space, such as near a vault or manhole?
Govt’s Answer: No confined space during performance of this service.
8. Is this a brand-new contract OR if there is (was) an incumbent performing these services.
If not brand new, could you please provide the current / previous contract number and what the total contract value was?
Govt’s Answer: This tree removal and disposal service is a brand new requirement.
9. Can 90 CES provide a site map or GPS coordinates for the 20 tree locations?
Govt’s Answer: No. Opportunity for a site visit was provided to interested offerors. The factor in determining tree removal and disposal costs rest on the height and the size of the tree as noted in the PWS.
10. Could you please confirm the anticipated start date for the period of performance?
Govt’s Answer: A 60-calendar day performance is calculated from the date of award receipt to completion of service. The anticipated start date is highly likely by 1st week of October.
11. Is attendance at the site visit a condition of quote acceptability, or is the site visit optional?
Govt’s Answer: Site visits are not required as a condition for quote acceptability. The factor in determining tree removal and disposal costs rest on the height and the size of the tree as noted in the PWS.
12. Provide a fillable/unprotected version of the document, or
Govt’s Answer: The solicitation document and its amendments (as needed), shall be acknowledged by the contractor. You may digitally sign or scan/wet sign. The document posted on SAM.gov, may be “printed to pdf” to be editable.
13. Confirm whether the form should instead be printed, completed by hand, and signed, then scanned for submission.
Govt’s Answer: The solicitation document and its amendments (as needed), shall be acknowledged by the contractor. You may digitally sign or scan/wet sign. The document posted on SAM.gov, may be “printed to pdf” to be editable.
14. Government provide photographs, tree identification/location information site-visit notes, or other information showing the location and surrounding conditions of the 20 designated trees?
Govt’s Answer: No. Opportunity for a site visit was provided to interested offerors. The factor in determining tree removal and disposal costs rest on the height and the size of the tree as noted in the PWS.
15. For tree removals along Randall Avenue requiring temporary lane closures, please clarify whether the Contractor is responsible for furnishing all traffic-control devices and personnel, including signs, cones/barricades and flaggers, or whether 90 CES/Security Forces will provide any traffic-control support. Please also confirm whether a formal traffic-control plan or other approval beyond the 14-calendar-day notification required by PWS
1.3.3 is required.
Govt’s Answer: Contractor must furnish traffic control devices, no additional notification is necessary if road closure is not involved. Otherwise, a 14-calendar day notification is required for any road closures.
16. Please confirm the applicable Service Contract Act labor classifications under Wage Determination 2015-5405 for personnel performing hazardous tree removal, including climbing/arborist work, aerial-lift operation, chainsaw operation, rigging, ground operations, and heavy-equipment operation. If these classifications are not specifically listed in the wage determination, please advise which listed classifications the Government anticipates will apply or whether a conformance will be required.
Govt’s Answer: The anticipated work classification should be Laborer, Grounds Maintenance. However, the contract is not dictating competitive pay for any Contractor employee. It is Contractor’s choice to provide the most economic way to provide this one time service.
17. Can you provide a list of the attendees at the pre-bid meeting yesterday?
Govt’s Answer: See Attachment 5 Site Visit Sign In Sheet