This solicitation requests quotes for an uninterruptible power supply system installation and maintenance services contract. The 90th Contracting Squadron of the Department of the Air Force Global Strike Command is seeking to award a firm fixed-price commercial contract for removal and disposal of an old UPS and installation of a new system at Francis E. Warren Air Force Base in Wyoming. Quotes are due no later than February 29, 2024 and must include pricing for equipment installation under CLIN 0001, and maintenance for the base year and four option years under separate CLINs. The contractor will also be responsible for supplying all labor, equipment, and materials to perform the work according to the requirements in the performance work statement. This opportunity is set aside for women-owned small businesses.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7 – Questions and Answers
FA461324Q1016
Attachment 7 – Questions and Answers
FA461324Q1016
Question
Question/Comment/Clarification
Government Response
1)
Is there a loading dock for delivery of the new
UPS?
There is not. These are historic facilities with stair access only to the basement.
2)
Is there room to store the unit on site prior to install?
There is room in B-00 (the big open space) where units can be staged until ready for installation. Coordinate with 90 CES for exact location
3)
Where is the UPS room in relation to the loading dock?
Are there any obstacles (stairs, ramps.
Narrow doors, etc.)?
Is the unit on the first floor? If not, is there an elevator available?
This is a historic facility and there is no loading dock or elevator available. Only stairs to access the basement level. The doors leading into the UPS space are standard door widths; 36”.
4)
How much runtime is desired for the new
UPS?
Minimum of 2 hours battery run time, see PWS.
5)
The existing unit is a 40kVA frame, but the unit itself is 25kVA, can you confirm if the new unit is to be 40kVA or 25kVA?
Is the existing wiring/conduit sized for a 40kVA or 25kVA UPS?
What size/rating are the existing two power panels?
I’m asking this because if the unit was wired for 40kVA, then the new unit being 40kVA is no problem, it’ll be a simple disconnect/reconnect with the new unit. If it was wired for 25kVA, then all of the wiring and conduit will need to be redone to support a 40kVA
UPS.
At the same time, the current unit is 25kVA, is the load increasing from what’s currently on the unit and that’s why a 40kVA is being requested?
The existing wiring/conduit is noted on sheet E006 of Attachment 1a – Line Drawings.
Panel MDP-3 is a 400A panel that will need to be reconnected to the UPS system. Panel CDP-1 is a 225A panel that will also need to be reconnected to the UPS system.
Additional panels in the mechanical room, panel H-1 and L-1 will also need to be added to the UPS system. This is where the additional load requirements are coming from;
as the intent is to provide power to all spaces shown in attached Power Floor Plan drawings.
It is assumed that the existing wiring/conduit will need to be replaced to have enough capacity to support a 40kVA system.
6)
Will “Made in America” or “TAA Compliant” be a requirement of this requisition?
As listed in Attachment 5 – Provisions and Clauses, FAR 52.212-5 (52) and (54) are NOT Checked
7)
Is it possible to clean out the UPS room completely, and leave it clean for the duration of the service contract?
Yes
8)
Can the new UPS equipment be installed on the adjacent wall next to the panel, facing the door, as opposed to the back wall?
yes
9)
Can there be a variance in service provided, limiting covered emergency response & warranty visits to 1 visit covered per year w/ 24 hours response time? Or must the amount of visits remain unlimited
No. Refer to PWS for service requirements.
10)
Can you please provide single line drawings depicting how existing equipment is connected/wired? In addition to single line drawings, can you also provide more detail on main entrance panel, and location in relationship to UPS
Please see Attachment 1a – Line Drawings.
11)
Please provide the existing and accurate one-line drawings.
Please see Attachment 1a – Line Drawings.
12)
What load is being added to the system and where are the panels located?
Load is being added to Area B00 and B24. Panels are located in Mechanical room (Panels H-1 and L-1).
See attached electrical sheets.
13)
During the visit we noticed that there is a breaker that is broken and tripped, does this need to be replaced?
Yes, replace with like size. Salient characteristics for the breaker will be posted as an amendment to the solicitation prior to the quotes due date.
14)
If existing wiring is found that doesn’t meet the Department of the Air Force requirements, are we liable for clean-up of this work?
There are some wires that were utilized temporarily then abandoned in place during the renovation of this space. It is assumed that these are the wires that are referred to. It is not expected that this contractor is liable for cleaning up these wires.
15)
What are the hours of operation to perform this work?
Site work hours shall be from 7:30 AM to 4:30 PM.
Workdays are Monday through Friday except federal holidays and AFGSC Family Days.
16)
What are the clearances needed to access the facility?
No security clearance is required, the space will be opened every day for work to commence.
17)
Please confirm that subcontractors will be able to use the parking lot to park company vehicles in.
Both the east and south parking lot are available for parking however do not park in spaces identified as reserved.
18)
Are there areas planned as designated staging for storage of tools and materials?
Staging area can be coordinated with customer.
19)
During the site visit, the labeling of the gear mentioned that the MDP3 gear is temporary.
Is this correct labeling? What do we need to re-label?
MDP3 gear is not temporary. Relabel as necessary.
20)
Will contractor use of facility restrooms be permitted?
Yes