Attachment 2f - Task Order Proposal Pre-Priced CLIN sheet - final.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Fiber Optic Installation - Multiple Buildings Federal contract opportunity
- Solicitation number
- FA461324Q1008
About this file
This document is an attachment related to a federal contract opportunity for Fiber Optic Installation - Multiple Buildings, Solicitation Number FA461324Q1008.
The attachment is a Contract Line Item Number (CLIN) structure that lists all elements of work for the fiber optic cable installation services, with estimated quantities and pricing. The services required include engineering, furnishing, installing, and testing armored single mode fiber optic cable to upgrade and enhance connectivity at various facilities on F.E. Warren AFB. The contract will be a Firm Fixed-Price, Indefinite Delivery, Indefinite Quantity commercial contract with an initial Task Order for the minimum quantity. The period of performance is 1095 calendar days after contract award, with an initial task order followed by additional task orders at the Government's discretion. Responses are due by 2 April 2024 at 0900 MST. The acquisition is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB).
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB WGF to ITB 232 Primary
| Attachment 2f - Task Order Proposal Pre-Priced CLIN sheet | FA461324Q1008- - Fiber Optic - Multiple Buildings | ||||
| Proposed quantities for Fiber run defined as: WGF to ITB 232 (Primary) and (alternate) ITN 333 | Performance Period: Complete all work within 120 days from date of task order award | ||||
| CLIN | Unit of Issue | Quantity - for specified Fiber Run only | CLIN Description | Price/Unit - To be filled directly from current period pricing | Total CLIN Price |
| OSP Fiber Optic Cable Cost in Existing MHDS/Innerduct | |||||
| 0001 | Linear Foot | SM, Loose Tube,Arm OSP 12 Strand | $0.00 | ||
| 0002 | Linear Foot | SM, Loose Tube,Arm OSP 24 Strand | $0.00 | ||
| 0003 | Linear Foot | SM, Loose Tube,Arm OSP 36 Strand | $0.00 | ||
| 0004 | Linear Foot | SM, Loose Tube,Arm OSP 48 Strand | $0.00 | ||
| 0005 | Linear Foot | SM, Loose Tube,Arm OSP 72 Strand | $0.00 | ||
| OSP Fiber Splice Cost | |||||
| 0006 | Per Case | 12 Str Splice case/ w trays | $0.00 | ||
| 0007 | Per Case | 24 Str Splice case/ w trays | $0.00 | ||
| 0008 | Per Case | 36 Str Splice case/ w trays | $0.00 | ||
| 0009 | Per Case | 48 Str Splice case/ w trays | $0.00 | ||
| 0010 | Per Case | 72 Str Splice case/ w trays | $0.00 | ||
| Material Cost for Outside Plant Duct | |||||
| 0011 | Linear Foot | 4" PVC Schedule 40 | $0.00 | ||
| Additional Installation Costs of Road Cut | |||||
| 0012 | Linear Foot | Additional Installation Costs of Road Cut | $0.00 | ||
| Installation HDPE Rollpipe, by Directional Drilling | |||||
| 0013 | Linear Foot | 1ea 4" HDPE | $0.00 | ||
| 0014 | Linear Foot | 2ea 4" HDPE | $0.00 | ||
| 0015 | Linear Foot | 4ea 4" HDPE | $0.00 | ||
| Outside Plant Innerduct | |||||
| 0016 | Linear Foot | 3 X 3" Detectable Geotextile | $0.00 | ||
| 0017 | Each | Core Bore Into Existing Manhole | $0.00 | ||
| Manholes/Handholes, H-20 Rated | |||||
| 0018 | Each | Handhole | $0.00 | ||
| 0019 | Hours | Manhole | $0.00 | ||
| 0020 | Each | Additional 5" Core Bore Into Existing Manhole | $0.00 | ||
| Building Penetration Cost | |||||
| 0021 | Each | 4" Ducts in external pullbox | $0.00 | ||
| 0022 | Each | 4 " Ducts Through Foundation | $0.00 | ||
| Building Fiber Optic Terminations to include end to end testing | |||||
| 0023 | Per FODP | 12 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors | $0.00 | ||
| 0024 | Per FODP | 24 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors | $0.00 | ||
| 0025 | Per FODP | 36 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors | $0.00 | ||
| 0026 | Per FODP | 48 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors | $0.00 | ||
| 0027 | Per FODP | 72 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors | $0.00 | ||
| Racks and Cabinets | |||||
| 0028 | Each | 19" Relay Rack | $0.00 | ||
| Cable Tray/ Ladder | |||||
| 0029 | Linear Foot | 4" PVC conduit (Mount to exterior wall) | $0.00 | ||
| Contract Deliverables | |||||
| 0030 | Each | Digging Permits | $0.00 | ||
| 0031 | Each | AS-Built Drawings | $0.00 | ||
| 0032 | Each | Butterfly Drawings | $0.00 | ||
| $0.00 |