Attachment 2f - Task Order Proposal Pre-Priced CLIN sheet.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Fiber Optic Installation - Multiple Buildings Federal contract opportunity
- Solicitation number
- FA461324Q1008
About this file
This document is a combined synopsis/solicitation from the Department of the Air Force Global Strike Command seeking quotes for fiber optic installation services at multiple buildings at Francis E. Warren Air Force Base in Wyoming. The solicitation is set aside for Service-Disabled Veteran Owned Small Businesses and seeks quotes for engineering, furnishing, installing, and testing armored single mode fiber optic cable along nine specified routes. Quotes are due by April 2, 2024 and must include pricing using the attached contract line item number structure along with technical details of past experience. The period of performance is 1095 calendar days with task orders awarded for each fiber run. The opportunity NAICS code is 238210 with a small business size standard of $19 million.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB WGF to ITB 232 Primary
| Attachment 2f - Task Order Proposal Pre-Priced CLIN sheet | FA461324Q1008- - Fiber Optic - Multiple Buildings | ||||
| Proposed quantities for Fiber run defined as: WGF to ITB 232 (Primary) | |||||
| CLIN | Unit of Issue | Quantity - for specified Fiber Run only | CLIN Description | Price/Unit - To be filled directly from current period pricing | Total CLIN Price |
| OSP Fiber Optic Cable Cost in Existing MHDS/Innerduct | |||||
| 0001 | Linear Foot | SM, Loose Tube,Arm OSP | $0.00 | ||
| 0002 | Hours | Engineering | $0.00 | ||
| 0003 | Hours | Equip Rental | $0.00 | ||
| 0004 | Hours | Craft Labor | $0.00 | ||
| OSP Fiber Splice Cost | |||||
| 0005 | Per Case | Number of Splice Cases, Each Cable Type | $0.00 | ||
| 0006 | Each | Splice Tray | $0.00 | ||
| 0007 | each | Encapsulant | $0.00 | ||
| 0008 | hours | Equip Rental | $0.00 | ||
| 0009 | hours | Craft Labor | $0.00 | ||
| MHDS Cost Summary | |||||
| Material Cost for Outside Plant Duct (No Installation) | |||||
| 0010 | Linear Foot | 4" PVC Schedule 40 | $0.00 | ||
| Installation 4" Duct, Standard Trenching, No Encasement | |||||
| 0011 | Hours | Engineering | $0.00 | ||
| 0012 | Hours | Equip Rental | $0.00 | ||
| 0013 | Hours | Craft Labor | $0.00 | ||
| Additional Installation Costs of Road Cut | |||||
| 0014 | Linear Foot | Additional Installation Costs of Road Cut | $0.00 | ||
| 0015 | Hours | Engineering | $0.00 | ||
| 0016 | Hours | Equip Rental | $0.00 | ||
| Installation HDPE Rollpipe, by Directional Drilling | |||||
| 0017 | Linear Foot | Ducts, 4" | $0.00 | ||
| 0018 | Hours | Engineering | $0.00 | ||
| 0019 | Hours | Equip Rental | $0.00 | ||
| 0020 | Hours | Craft Labor | $0.00 | ||
| Outside Plant Innerduct | |||||
| 0021 | Linear Foot | 3" X 3 Detectable Geotextile X 1 (for 3 cables) | $0.00 | ||
| 0022 | Hours | Engineering | $0.00 | ||
| 0023 | Hours | Equip Rental | $0.00 | ||
| 0024 | Each | Core Bore Into Existing Manhole | $0.00 | ||
| 0025 | Hours | Craft Labor | $0.00 | ||
| Manholes/Handholes, H-20 Rated | |||||
| 0026 | Each | Handhole | $0.00 | ||
| 0027 | Each | Additional 5" Core Bore Into Existing Manhole | $0.00 | ||
| 0028 | Hours | Engineering | $0.00 | ||
| 0029 | hours | Equip Rental | $0.00 | ||
| 0030 | Hours | Craft Labor | $0.00 | ||
| Building Entrance Cost Summary | |||||
| Building Penetration Cost | |||||
| 0031 | Each | 4" Ducts in external pullbox | $0.00 | ||
| 0032 | Each | 4 " Ducts Through Foundation | $0.00 | ||
| 0033 | Hours | Engineering | $0.00 | ||
| 0034 | Hours | Equip Rental | $0.00 | ||
| 0035 | Hours | Craft Labor | $0.00 | ||
| Building Fiber Optic Terminations | |||||
| 0036 | Per FODP | 12 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors | $0.00 | ||
| 0037 | Hours | Engineering | $0.00 | ||
| 0038 | Hours | Equip Rental | $0.00 | ||
| 0039 | Hours | Craft Labor | $0.00 | ||
| End to End Fiber Testing | |||||
| 0040 | Hours | Equip Rental | $0.00 | ||
| 0041 | Hours | Craft Labor | $0.00 | ||
| Racks and Cabinets | |||||
| 0042 | Each | 19" Relay Rack | $0.00 | ||
| 0043 | Hours | Engineering | $0.00 | ||
| 0044 | Hours | Equip Rental | $0.00 | ||
| 0045 | Hours | Craft Labor | $0.00 | ||
| Cable Tray/ Ladder | |||||
| 0046 | Linear Foot | 4" PVC conduit (Mount to exterior wall) | $0.00 | ||
| 0047 | Hours | Engineering | $0.00 | ||
| 0048 | Hours | Equip Rental | $0.00 | ||
| 0049 | Hours | Craft Labor | $0.00 | ||
| Miscellaneous Calculations | |||||
| Miscellaneous Costs | |||||
| Survey and Record GeoBase Data small Project | |||||
| 0050 | Hours | Engineering | $0.00 | ||
| 0051 | Hours | Equip Rental | $0.00 | ||
| 0052 | Hours | CAD, Tech Writer, Office Admin | $0.00 | ||
| Miscellanous local hardware/supplies | |||||
| 0053 | Hours | Engineering | $0.00 | ||
| 0054 | Hours | Equip Rental | $0.00 | ||
| 0055 | Hours | CAD, Tech Writer, Office Admin | $0.00 | ||
| $ - 0 |
File details come from the government source that posted it. Updated .