Attachment 1 - Contract Line Item Number structure.xlsx
XLSX spreadsheet 36 KB Posted
- Attached to
- Fiber Optic Installation - Multiple Buildings Federal contract opportunity
- Solicitation number
- FA461324Q1008
About this file
This solicitation seeks quotes for a fiber optic installation project at Francis E. Warren Air Force Base in Wyoming. The contractor shall engineer, furnish, install, and test armored single mode fiber optic cable along several routes to upgrade connectivity between buildings. The contract type will be firm fixed price with an initial task order and additional orders at the government's discretion. Quotes are due by April 2, 2024 and the period of performance is 1095 calendar days. The solicitation is set aside for service-disabled veteran-owned small businesses and will be evaluated using lowest price technically acceptable criteria. Offerors must demonstrate relevant past experience and provide pricing for cable installation and outyear requirements.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Period 1 - Date of Award + 365
| Attachment 1 - Contract Line Item Number structure | FA461324Q1008- - Fiber Optic - Multiple Buildings | ||||
| Period 1 - Date of Award + 365 | |||||
| CLIN | Unit of Issue | Quantity | CLIN Description | Price/Unit | Total CLIN Price |
| OSP Fiber Optic Cable Cost in Existing MHDS/Innerduct | |||||
| 0001 | Linear Foot | 69731 | SM, Loose Tube,Arm OSP | $0.00 | |
| 0002 | Hours | 126 | Engineering | $0.00 | |
| 0003 | Hours | 262 | Equip Rental | $0.00 | |
| 0004 | Hours | 1041 | Craft Labor | $0.00 | |
| OSP Fiber Splice Cost | |||||
| 0005 | Per Case | 5 | Number of Splice Cases, Each Cable Type | $0.00 | |
| 0006 | Each | 9 | Splice Tray | $0.00 | |
| 0007 | each | 5 | Encapsulant | $0.00 | |
| 0008 | hours | 26 | Equip Rental | $0.00 | |
| 0009 | hours | 52 | Craft Labor | $0.00 | |
| MHDS Cost Summary | |||||
| Material Cost for Outside Plant Duct (No Installation) | |||||
| 0010 | Linear Foot | 9046 | 4" PVC Schedule 40 | $0.00 | |
| Installation 4" Duct, Standard Trenching, No Encasement | |||||
| 0011 | Hours | 85 | Engineering | $0.00 | |
| 0012 | Hours | 342 | Equip Rental | $0.00 | |
| 0013 | Hours | 2047 | Craft Labor | $0.00 | |
| Additional Installation Costs of Road Cut | |||||
| 0014 | Linear Foot | 100 | Additional Installation Costs of Road Cut | $0.00 | |
| 0015 | Hours | 2 | Engineering | $0.00 | |
| 0016 | Hours | 15 | Equip Rental | $0.00 | |
| Installation HDPE Rollpipe, by Directional Drilling | |||||
| 0017 | Linear Foot | 3082 | Ducts, 4" | $0.00 | |
| 0018 | Hours | 124 | Engineering | $0.00 | |
| 0019 | Hours | 280 | Equip Rental | $0.00 | |
| 0020 | Hours | 1119 | Craft Labor | $0.00 | |
| Outside Plant Innerduct | |||||
| 0021 | Linear Foot | 20225 | 3" X 3 Detectable Geotextile X 1 (for 3 cables) | $0.00 | |
| 0022 | Hours | 55 | Engineering | $0.00 | |
| 0023 | Hours | 287 | Equip Rental | $0.00 | |
| 0024 | Each | 2 | Core Bore Into Existing Manhole | $0.00 | |
| 0025 | Hours | 1831 | Craft Labor | $0.00 | |
| Manholes/Handholes, H-20 Rated | |||||
| 0026 | Each | 36 | Handhole | $0.00 | |
| 0027 | Each | 4 | Additional 5" Core Bore Into Existing Manhole | $0.00 | |
| 0028 | Hours | 73 | Engineering | $0.00 | |
| 0029 | hours | 463 | Equip Rental | $0.00 | |
| 0030 | Hours | 3241 | Craft Labor | $0.00 | |
| Building Entrance Cost Summary | |||||
| Building Penetration Cost | |||||
| 0031 | Each | 3 | 4" Ducts in external pullbox | $0.00 | |
| 0032 | Each | 3 | 4 " Ducts Through Foundation | $0.00 | |
| 0033 | Hours | 24 | Engineering | $0.00 | |
| 0034 | Hours | 28 | Equip Rental | $0.00 | |
| 0035 | Hours | 152 | Craft Labor | $0.00 | |
| Building Fiber Optic Terminations | |||||
| 0036 | Per FODP | 14 | 12 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors | $0.00 | |
| 0037 | Hours | 14 | Engineering | $0.00 | |
| 0038 | Hours | 75 | Equip Rental | $0.00 | |
| 0039 | Hours | 146 | Craft Labor | $0.00 | |
| End to End Fiber Testing | |||||
| 0040 | Hours | 31 | Equip Rental | $0.00 | |
| 0041 | Hours | 62 | Craft Labor | $0.00 | |
| Racks and Cabinets | |||||
| 0042 | Each | 10 | 19" Relay Rack | $0.00 | |
| 0043 | Hours | 20 | Engineering | $0.00 | |
| 0044 | Hours | 30 | Equip Rental | $0.00 | |
| 0045 | Hours | 60 | Craft Labor | $0.00 | |
| Cable Tray/ Ladder | |||||
| 0046 | Linear Foot | 270 | 4" PVC conduit (Mount to exterior wall) | $0.00 | |
| 0047 | Hours | 20 | Engineering | $0.00 | |
| 0048 | Hours | 48 | Equip Rental | $0.00 | |
| 0049 | Hours | 100 | Craft Labor | $0.00 | |
| Miscellaneous Calculations | |||||
| Miscellaneous Costs | |||||
| Survey and Record GeoBase Data small Project | |||||
| 0050 | Hours | 100 | Engineering | $0.00 | |
| 0051 | Hours | 100 | Equip Rental | $0.00 | |
| 0052 | Hours | 320 | CAD, Tech Writer, Office Admin | $0.00 | |
| Miscellanous local hardware/supplies | |||||
| 0053 | Hours | 100 | Engineering | $0.00 | |
| 0054 | Hours | 100 | Equip Rental | $0.00 | |
| 0055 | Hours | 320 | CAD, Tech Writer, Office Admin | $0.00 | |
| $ - 0 |
Period 2 - Day 366 thru 730
| Attachment 1 - Contract Line Item Number structure | FA461324Q1008- - Fiber Optic - Multiple Buildings | ||||
| Period 2 - Day 366 thru 730 | |||||
| CLIN | Unit of Issue | Quantity | CLIN Description | Price/Unit | Total CLIN Price |
| OSP Fiber Optic Cable Cost in Existing MHDS/Innerduct | |||||
| 1001 | Linear Foot | 69731 | SM, Loose Tube,Arm OSP | $0.00 | |
| 1002 | Hours | 126 | Engineering | $0.00 | |
| 1003 | Hours | 262 | Equip Rental | $0.00 | |
| 1004 | Hours | 1041 | Craft Labor | $0.00 | |
| OSP Fiber Splice Cost | |||||
| 1005 | Per Case | 5 | Number of Splice Cases, Each Cable Type | $0.00 | |
| 1006 | Each | 9 | Splice Tray | $0.00 | |
| 1007 | each | 5 | Encapsulant | $0.00 | |
| 1008 | hours | 26 | Equip Rental | $0.00 | |
| 1009 | hours | 52 | Craft Labor | $0.00 | |
| MHDS Cost Summary | |||||
| Material Cost for Outside Plant Duct (No Installation) | |||||
| 1010 | Linear Foot | 9046 | 4" PVC Schedule 40 | $0.00 | |
| Installation 4" Duct, Standard Trenching, No Encasement | |||||
| 1011 | Hours | 85 | Engineering | $0.00 | |
| 1012 | Hours | 342 | Equip Rental | $0.00 | |
| 1013 | Hours | 2047 | Craft Labor | $0.00 | |
| Additional Installation Costs of Road Cut | |||||
| 1014 | Linear Foot | 100 | Additional Installation Costs of Road Cut | $0.00 | |
| 1015 | Hours | 2 | Engineering | $0.00 | |
| 1016 | Hours | 15 | Equip Rental | $0.00 | |
| Installation HDPE Rollpipe, by Directional Drilling | |||||
| 1017 | Linear Foot | 3082 | Ducts, 4" | $0.00 | |
| 1018 | Hours | 124 | Engineering | $0.00 | |
| 1019 | Hours | 280 | Equip Rental | $0.00 | |
| 1020 | Hours | 1119 | Craft Labor | $0.00 | |
| Outside Plant Innerduct | |||||
| 1021 | Linear Foot | 20225 | 3" X 3 Detectable Geotextile X 1 (for 3 cables) | $0.00 | |
| 1022 | Hours | 55 | Engineering | $0.00 | |
| 1023 | Hours | 287 | Equip Rental | $0.00 | |
| 1024 | Each | 2 | Core Bore Into Existing Manhole | $0.00 | |
| 1025 | Hours | 1831 | Craft Labor | $0.00 | |
| Manholes/Handholes, H-20 Rated | |||||
| 1026 | Each | 36 | Handhole | $0.00 | |
| 1027 | Each | 4 | Additional 5" Core Bore Into Existing Manhole | $0.00 | |
| 1028 | Hours | 73 | Engineering | $0.00 | |
| 1029 | hours | 463 | Equip Rental | $0.00 | |
| 1030 | Hours | 3241 | Craft Labor | $0.00 | |
| Building Entrance Cost Summary | |||||
| Building Penetration Cost | |||||
| 1031 | Each | 3 | 4" Ducts in external pullbox | $0.00 | |
| 1032 | Each | 3 | 4 " Ducts Through Foundation | $0.00 | |
| 1033 | Hours | 24 | Engineering | $0.00 | |
| 1034 | Hours | 28 | Equip Rental | $0.00 | |
| 1035 | Hours | 152 | Craft Labor | $0.00 | |
| Building Fiber Optic Terminations | |||||
| 1036 | Per FODP | 14 | 12 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors | $0.00 | |
| 1037 | Hours | 14 | Engineering | $0.00 | |
| 1038 | Hours | 75 | Equip Rental | $0.00 | |
| 1039 | Hours | 146 | Craft Labor | $0.00 | |
| End to End Fiber Testing | |||||
| 1040 | Hours | 31 | Equip Rental | $0.00 | |
| 1041 | Hours | 62 | Craft Labor | $0.00 | |
| Racks and Cabinets | |||||
| 1042 | Each | 10 | 19" Relay Rack | $0.00 | |
| 1043 | Hours | 20 | Engineering | $0.00 | |
| 1044 | Hours | 30 | Equip Rental | $0.00 | |
| 1045 | Hours | 60 | Craft Labor | $0.00 | |
| Cable Tray/ Ladder | |||||
| 1046 | Linear Foot | 270 | 4" PVC conduit (Mount to exterior wall) | $0.00 | |
| 1047 | Hours | 20 | Engineering | $0.00 | |
| 1048 | Hours | 48 | Equip Rental | $0.00 | |
| 1049 | Hours | 100 | Craft Labor | $0.00 | |
| Miscellaneous Calculations | |||||
| Miscellaneous Costs | |||||
| Survey and Record GeoBase Data small Project | |||||
| 1050 | Hours | 100 | Engineering | $0.00 | |
| 1051 | Hours | 100 | Equip Rental | $0.00 | |
| 1052 | Hours | 320 | CAD, Tech Writer, Office Admin | $0.00 | |
| Miscellanous local hardware/supplies | |||||
| 1053 | Hours | 100 | Engineering | $0.00 | |
| 1054 | Hours | 100 | Equip Rental | $0.00 | |
| 1055 | Hours | 320 | CAD, Tech Writer, Office Admin | $0.00 | |
| $ - 0 |
Period 3 - Day 731 thru 1095
| Attachment 1 - Contract Line Item Number structure | FA461324Q1008- - Fiber Optic - Multiple Buildings | ||||
| Period 3 - Day 731 thru 1095 | |||||
| CLIN | Unit of Issue | Quantity | CLIN Description | Price/Unit | Total CLIN Price |
| OSP Fiber Optic Cable Cost in Existing MHDS/Innerduct | |||||
| 2001 | Linear Foot | 69731 | SM, Loose Tube,Arm OSP | $0.00 | |
| 2002 | Hours | 126 | Engineering | $0.00 | |
| 2003 | Hours | 262 | Equip Rental | $0.00 | |
| 2004 | Hours | 1041 | Craft Labor | $0.00 | |
| OSP Fiber Splice Cost | |||||
| 2005 | Per Case | 5 | Number of Splice Cases, Each Cable Type | $0.00 | |
| 2006 | Each | 9 | Splice Tray | $0.00 | |
| 2007 | each | 5 | Encapsulant | $0.00 | |
| 2008 | hours | 26 | Equip Rental | $0.00 | |
| 2009 | hours | 52 | Craft Labor | $0.00 | |
| MHDS Cost Summary | |||||
| Material Cost for Outside Plant Duct (No Installation) | |||||
| 2010 | Linear Foot | 9046 | 4" PVC Schedule 40 | $0.00 | |
| Installation 4" Duct, Standard Trenching, No Encasement | |||||
| 2011 | Hours | 85 | Engineering | $0.00 | |
| 2012 | Hours | 342 | Equip Rental | $0.00 | |
| 2013 | Hours | 2047 | Craft Labor | $0.00 | |
| Additional Installation Costs of Road Cut | |||||
| 2014 | Linear Foot | 100 | Additional Installation Costs of Road Cut | $0.00 | |
| 2015 | Hours | 2 | Engineering | $0.00 | |
| 2016 | Hours | 15 | Equip Rental | $0.00 | |
| Installation HDPE Rollpipe, by Directional Drilling | |||||
| 2017 | Linear Foot | 3082 | Ducts, 4" | $0.00 | |
| 2018 | Hours | 124 | Engineering | $0.00 | |
| 2019 | Hours | 280 | Equip Rental | $0.00 | |
| 2020 | Hours | 1119 | Craft Labor | $0.00 | |
| Outside Plant Innerduct | |||||
| 2021 | Linear Foot | 20225 | 3" X 3 Detectable Geotextile X 1 (for 3 cables) | $0.00 | |
| 2022 | Hours | 55 | Engineering | $0.00 | |
| 2023 | Hours | 287 | Equip Rental | $0.00 | |
| 2024 | Each | 2 | Core Bore Into Existing Manhole | $0.00 | |
| 2025 | Hours | 1831 | Craft Labor | $0.00 | |
| Manholes/Handholes, H-20 Rated | |||||
| 2026 | Each | 36 | Handhole | $0.00 | |
| 2027 | Each | 4 | Additional 5" Core Bore Into Existing Manhole | $0.00 | |
| 2028 | Hours | 73 | Engineering | $0.00 | |
| 2029 | hours | 463 | Equip Rental | $0.00 | |
| 2030 | Hours | 3241 | Craft Labor | $0.00 | |
| Building Entrance Cost Summary | |||||
| Building Penetration Cost | |||||
| 2031 | Each | 3 | 4" Ducts in external pullbox | $0.00 | |
| 2032 | Each | 3 | 4 " Ducts Through Foundation | $0.00 | |
| 2033 | Hours | 24 | Engineering | $0.00 | |
| 2034 | Hours | 28 | Equip Rental | $0.00 | |
| 2035 | Hours | 152 | Craft Labor | $0.00 | |
| Building Fiber Optic Terminations | |||||
| 2036 | Per FODP | 14 | 12 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors | $0.00 | |
| 2037 | Hours | 14 | Engineering | $0.00 | |
| 2038 | Hours | 75 | Equip Rental | $0.00 | |
| 2039 | Hours | 146 | Craft Labor | $0.00 | |
| End to End Fiber Testing | |||||
| 2040 | Hours | 31 | Equip Rental | $0.00 | |
| 2041 | Hours | 62 | Craft Labor | $0.00 | |
| Racks and Cabinets | |||||
| 2042 | Each | 10 | 19" Relay Rack | $0.00 | |
| 2043 | Hours | 20 | Engineering | $0.00 | |
| 2044 | Hours | 30 | Equip Rental | $0.00 | |
| 2045 | Hours | 60 | Craft Labor | $0.00 | |
| Cable Tray/ Ladder | |||||
| 2046 | Linear Foot | 270 | 4" PVC conduit (Mount to exterior wall) | $0.00 | |
| 2047 | Hours | 20 | Engineering | $0.00 | |
| 2048 | Hours | 48 | Equip Rental | $0.00 | |
| 2049 | Hours | 100 | Craft Labor | $0.00 | |
| Miscellaneous Calculations | |||||
| Miscellaneous Costs | |||||
| Survey and Record GeoBase Data small Project | |||||
| 2050 | Hours | 100 | Engineering | $0.00 | |
| 2051 | Hours | 100 | Equip Rental | $0.00 | |
| 2052 | Hours | 320 | CAD, Tech Writer, Office Admin | $0.00 | |
| Miscellanous local hardware/supplies | |||||
| 2053 | Hours | 100 | Engineering | $0.00 | |
| 2054 | Hours | 100 | Equip Rental | $0.00 | |
| 2055 | Hours | 320 | CAD, Tech Writer, Office Admin | $0.00 | |
| $ - 0 |
File details come from the government source that posted it. Updated .