Attachment 1 - Contract Line Item Number structure.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
Fiber Optic Installation - Multiple Buildings Federal contract opportunity
Solicitation number
FA461324Q1008
Issued by
Department of the Air Force Global Strike Command

About this file

This solicitation seeks quotes for a fiber optic installation project at Francis E. Warren Air Force Base in Wyoming. The contractor shall engineer, furnish, install, and test armored single mode fiber optic cable along several routes to upgrade connectivity between buildings. The contract type will be firm fixed price with an initial task order and additional orders at the government's discretion. Quotes are due by April 2, 2024 and the period of performance is 1095 calendar days. The solicitation is set aside for service-disabled veteran-owned small businesses and will be evaluated using lowest price technically acceptable criteria. Offerors must demonstrate relevant past experience and provide pricing for cable installation and outyear requirements.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Period 1 - Date of Award + 365

Attachment 1 - Contract Line Item Number structureFA461324Q1008- - Fiber Optic - Multiple Buildings
Period 1 - Date of Award + 365
CLINUnit of IssueQuantityCLIN DescriptionPrice/UnitTotal CLIN Price
OSP Fiber Optic Cable Cost in Existing MHDS/Innerduct
0001Linear Foot69731SM, Loose Tube,Arm OSP$0.00
0002Hours126Engineering$0.00
0003Hours262Equip Rental$0.00
0004Hours1041Craft Labor$0.00
OSP Fiber Splice Cost
0005Per Case5Number of Splice Cases, Each Cable Type$0.00
0006Each9Splice Tray$0.00
0007each5Encapsulant$0.00
0008hours26Equip Rental$0.00
0009hours52Craft Labor$0.00
MHDS Cost Summary
Material Cost for Outside Plant Duct (No Installation)
0010Linear Foot90464" PVC Schedule 40$0.00
Installation 4" Duct, Standard Trenching, No Encasement
0011Hours85Engineering$0.00
0012Hours342Equip Rental$0.00
0013Hours2047Craft Labor$0.00
Additional Installation Costs of Road Cut
0014Linear Foot100Additional Installation Costs of Road Cut$0.00
0015Hours2Engineering$0.00
0016Hours15Equip Rental$0.00
Installation HDPE Rollpipe, by Directional Drilling
0017Linear Foot3082Ducts, 4"$0.00
0018Hours124Engineering$0.00
0019Hours280Equip Rental$0.00
0020Hours1119Craft Labor$0.00
Outside Plant Innerduct
0021Linear Foot202253" X 3 Detectable Geotextile X 1 (for 3 cables)$0.00
0022Hours55Engineering$0.00
0023Hours287Equip Rental$0.00
0024Each2Core Bore Into Existing Manhole$0.00
0025Hours1831Craft Labor$0.00
Manholes/Handholes, H-20 Rated
0026Each36Handhole$0.00
0027Each4Additional 5" Core Bore Into Existing Manhole$0.00
0028Hours73Engineering$0.00
0029hours463Equip Rental$0.00
0030Hours3241Craft Labor$0.00
Building Entrance Cost Summary
Building Penetration Cost
0031Each34" Ducts in external pullbox$0.00
0032Each34 " Ducts Through Foundation$0.00
0033Hours24Engineering$0.00
0034Hours28Equip Rental$0.00
0035Hours152Craft Labor$0.00
Building Fiber Optic Terminations
0036Per FODP1412 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors$0.00
0037Hours14Engineering$0.00
0038Hours75Equip Rental$0.00
0039Hours146Craft Labor$0.00
End to End Fiber Testing
0040Hours31Equip Rental$0.00
0041Hours62Craft Labor$0.00
Racks and Cabinets
0042Each1019" Relay Rack$0.00
0043Hours20Engineering$0.00
0044Hours30Equip Rental$0.00
0045Hours60Craft Labor$0.00
Cable Tray/ Ladder
0046Linear Foot2704" PVC conduit (Mount to exterior wall)$0.00
0047Hours20Engineering$0.00
0048Hours48Equip Rental$0.00
0049Hours100Craft Labor$0.00
Miscellaneous Calculations
Miscellaneous Costs
Survey and Record GeoBase Data small Project
0050Hours100Engineering$0.00
0051Hours100Equip Rental$0.00
0052Hours320CAD, Tech Writer, Office Admin$0.00
Miscellanous local hardware/supplies
0053Hours100Engineering$0.00
0054Hours100Equip Rental$0.00
0055Hours320CAD, Tech Writer, Office Admin$0.00
$ - 0

Period 2 - Day 366 thru 730

Attachment 1 - Contract Line Item Number structureFA461324Q1008- - Fiber Optic - Multiple Buildings
Period 2 - Day 366 thru 730
CLINUnit of IssueQuantityCLIN DescriptionPrice/UnitTotal CLIN Price
OSP Fiber Optic Cable Cost in Existing MHDS/Innerduct
1001Linear Foot69731SM, Loose Tube,Arm OSP$0.00
1002Hours126Engineering$0.00
1003Hours262Equip Rental$0.00
1004Hours1041Craft Labor$0.00
OSP Fiber Splice Cost
1005Per Case5Number of Splice Cases, Each Cable Type$0.00
1006Each9Splice Tray$0.00
1007each5Encapsulant$0.00
1008hours26Equip Rental$0.00
1009hours52Craft Labor$0.00
MHDS Cost Summary
Material Cost for Outside Plant Duct (No Installation)
1010Linear Foot90464" PVC Schedule 40$0.00
Installation 4" Duct, Standard Trenching, No Encasement
1011Hours85Engineering$0.00
1012Hours342Equip Rental$0.00
1013Hours2047Craft Labor$0.00
Additional Installation Costs of Road Cut
1014Linear Foot100Additional Installation Costs of Road Cut$0.00
1015Hours2Engineering$0.00
1016Hours15Equip Rental$0.00
Installation HDPE Rollpipe, by Directional Drilling
1017Linear Foot3082Ducts, 4"$0.00
1018Hours124Engineering$0.00
1019Hours280Equip Rental$0.00
1020Hours1119Craft Labor$0.00
Outside Plant Innerduct
1021Linear Foot202253" X 3 Detectable Geotextile X 1 (for 3 cables)$0.00
1022Hours55Engineering$0.00
1023Hours287Equip Rental$0.00
1024Each2Core Bore Into Existing Manhole$0.00
1025Hours1831Craft Labor$0.00
Manholes/Handholes, H-20 Rated
1026Each36Handhole$0.00
1027Each4Additional 5" Core Bore Into Existing Manhole$0.00
1028Hours73Engineering$0.00
1029hours463Equip Rental$0.00
1030Hours3241Craft Labor$0.00
Building Entrance Cost Summary
Building Penetration Cost
1031Each34" Ducts in external pullbox$0.00
1032Each34 " Ducts Through Foundation$0.00
1033Hours24Engineering$0.00
1034Hours28Equip Rental$0.00
1035Hours152Craft Labor$0.00
Building Fiber Optic Terminations
1036Per FODP1412 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors$0.00
1037Hours14Engineering$0.00
1038Hours75Equip Rental$0.00
1039Hours146Craft Labor$0.00
End to End Fiber Testing
1040Hours31Equip Rental$0.00
1041Hours62Craft Labor$0.00
Racks and Cabinets
1042Each1019" Relay Rack$0.00
1043Hours20Engineering$0.00
1044Hours30Equip Rental$0.00
1045Hours60Craft Labor$0.00
Cable Tray/ Ladder
1046Linear Foot2704" PVC conduit (Mount to exterior wall)$0.00
1047Hours20Engineering$0.00
1048Hours48Equip Rental$0.00
1049Hours100Craft Labor$0.00
Miscellaneous Calculations
Miscellaneous Costs
Survey and Record GeoBase Data small Project
1050Hours100Engineering$0.00
1051Hours100Equip Rental$0.00
1052Hours320CAD, Tech Writer, Office Admin$0.00
Miscellanous local hardware/supplies
1053Hours100Engineering$0.00
1054Hours100Equip Rental$0.00
1055Hours320CAD, Tech Writer, Office Admin$0.00
$ - 0

Period 3 - Day 731 thru 1095

Attachment 1 - Contract Line Item Number structureFA461324Q1008- - Fiber Optic - Multiple Buildings
Period 3 - Day 731 thru 1095
CLINUnit of IssueQuantityCLIN DescriptionPrice/UnitTotal CLIN Price
OSP Fiber Optic Cable Cost in Existing MHDS/Innerduct
2001Linear Foot69731SM, Loose Tube,Arm OSP$0.00
2002Hours126Engineering$0.00
2003Hours262Equip Rental$0.00
2004Hours1041Craft Labor$0.00
OSP Fiber Splice Cost
2005Per Case5Number of Splice Cases, Each Cable Type$0.00
2006Each9Splice Tray$0.00
2007each5Encapsulant$0.00
2008hours26Equip Rental$0.00
2009hours52Craft Labor$0.00
MHDS Cost Summary
Material Cost for Outside Plant Duct (No Installation)
2010Linear Foot90464" PVC Schedule 40$0.00
Installation 4" Duct, Standard Trenching, No Encasement
2011Hours85Engineering$0.00
2012Hours342Equip Rental$0.00
2013Hours2047Craft Labor$0.00
Additional Installation Costs of Road Cut
2014Linear Foot100Additional Installation Costs of Road Cut$0.00
2015Hours2Engineering$0.00
2016Hours15Equip Rental$0.00
Installation HDPE Rollpipe, by Directional Drilling
2017Linear Foot3082Ducts, 4"$0.00
2018Hours124Engineering$0.00
2019Hours280Equip Rental$0.00
2020Hours1119Craft Labor$0.00
Outside Plant Innerduct
2021Linear Foot202253" X 3 Detectable Geotextile X 1 (for 3 cables)$0.00
2022Hours55Engineering$0.00
2023Hours287Equip Rental$0.00
2024Each2Core Bore Into Existing Manhole$0.00
2025Hours1831Craft Labor$0.00
Manholes/Handholes, H-20 Rated
2026Each36Handhole$0.00
2027Each4Additional 5" Core Bore Into Existing Manhole$0.00
2028Hours73Engineering$0.00
2029hours463Equip Rental$0.00
2030Hours3241Craft Labor$0.00
Building Entrance Cost Summary
Building Penetration Cost
2031Each34" Ducts in external pullbox$0.00
2032Each34 " Ducts Through Foundation$0.00
2033Hours24Engineering$0.00
2034Hours28Equip Rental$0.00
2035Hours152Craft Labor$0.00
Building Fiber Optic Terminations
2036Per FODP1412 port FO Distribution Panel, Rack/Wall Mount, w/Pigtail Connectors$0.00
2037Hours14Engineering$0.00
2038Hours75Equip Rental$0.00
2039Hours146Craft Labor$0.00
End to End Fiber Testing
2040Hours31Equip Rental$0.00
2041Hours62Craft Labor$0.00
Racks and Cabinets
2042Each1019" Relay Rack$0.00
2043Hours20Engineering$0.00
2044Hours30Equip Rental$0.00
2045Hours60Craft Labor$0.00
Cable Tray/ Ladder
2046Linear Foot2704" PVC conduit (Mount to exterior wall)$0.00
2047Hours20Engineering$0.00
2048Hours48Equip Rental$0.00
2049Hours100Craft Labor$0.00
Miscellaneous Calculations
Miscellaneous Costs
Survey and Record GeoBase Data small Project
2050Hours100Engineering$0.00
2051Hours100Equip Rental$0.00
2052Hours320CAD, Tech Writer, Office Admin$0.00
Miscellanous local hardware/supplies
2053Hours100Engineering$0.00
2054Hours100Equip Rental$0.00
2055Hours320CAD, Tech Writer, Office Admin$0.00
$ - 0