Attachment 5 - AF66 - Submittal Schedule.pdf

PDF 146 KB Posted

Attached to
Paint Interior Hallways, Stairwells (B323C) and Exterior Walls (B301D)
Solicitation number
FA460020B0001
Issued by

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

SGBP

21-2061

APPROVED DISAPPROVED

1 Contractor Daily Logs. Sec 00 10 00 Para 1.9

2 Material Delivery Receipt. Sec 00 10 00 Para 1.12 CEI Approval Required

3 Traffic Control Plan. Sec 00 10 00 Para 1.13c As Required

4 Security - Listing of Employees. Sec 00 10 00 Para 1.24a Prior to start of any work

5 Security - Training. Sec 00 10 00 Para 1.24b Prior to start of any work

6 Confined Space Permit. Sec 00 10 00 Para 1.25c6 Prior to Confined Space work

7 Air Space Coordniation. Sec 00 10 00 Para 1.26 As Required

8 Digging Permit. Sec 00 10 00 Para 1.28a Prior to any Earthwork

9 Contractor Single Point of Contact. Sec 00 10 00 Para 1.38c Within 10 days of

NTP

10 AF Form 3064. Sec 00 10 00 Para 1.40 Within 10 days of NTP Must submit with #5

11 AF Form 3065. Sec 00 10 00 Para 1.40

12 MS Project Gant Schedule. Sec 00 10 00 Para 1.40 Within 10 days of NTP Must submit with #4

13 CD of all Submittals. Sec 00 10 00 Para 1.40 NLT + 30 days

BO

14 Project Commissioning Plan. Sec 00 10 00 Para 1.41 Within 30 days of

NTP

15 Termite Treatment Reporting. Sec 00 10 00 Para 1.43 As Required

16 O & M Manuals. Sec 00 10 00 Para 1.45 3 NLT + 30 days

BO

17 Warranty Book. Sec 00 10 00 Para 1.46 3 NLT + 30 days

BO

18 Extra Stock. Sec 00 10 00 Para 1.47 1 At Final

Inspection

19 Shop Drawings. Sec 01 33 00 Para 1.1

20 Color Sample/Selections. Sec 01 33 00 Para 1.1

21 Close-out cd of all project submittals. Sec 01 33 00 Para 1.4D2n 1 NLT + 90 days

22 As-Constucted Drawings Sec 01 33 00 Para 1.5 1 NLT + 90 days

23 Record Shop Drawings. Sec 01 33 00 Para 1.6

24 Draft DD Form 1354. Sec 01 33 00 Para 1.7 1 -30 days of BO

25 Interim DD Form 1354. Sec 01 33 00 Para 1.7 1 Beneficial

Occupancy (BO) Hardcopy provided at Beneficial Occupancy

26 Final DD Form 1354. Sec 01 33 00 Para 1.7 1 NLT + 30 days

BO

27 Corrective Plan for Lead Based Paint /Asbetos. Sec 01 33 00 Para 1.9

28 Personal Geodatabase. Sec 01 33 00 Para 1.109 NLT + 90 days

BO

29 Safety Data Sheets. Sec 01 57 19 Para 1.1.3 CEI Approval Required

30 Hazardous Material Storage Plan. Sec 01 57 19 Para 1.1.5 CEI Approval Required

31 Spill Reporting. Sec 01 57 19 Para 1.1.6 CEI Approval Required

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NAME,

Paint Hallways & Stairwells, B323

OFFUTT AFB, NEBRASKA

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

IN

G

ST

R

U C

TI

O

N S

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

SH

O

P D

R

AW

IN

G

S

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

ER

'S

W

AR

R

AN

TY

C

LO

SE

O

U T

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACTI

NG

O

TH

ER

M

AT

ER

IA

L

O R

D

AT

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

EC

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

C

LO

SE

O U

T

102-XXX SGBP XX-XXXX 1B-5

21-2061

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NAME,

Paint Hallways & Stairwells, B323

OFFUTT AFB, NEBRASKA

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

R

U C

TI

O

N S

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

SH

O

P D

R

AW

IN

G

S

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

R

AN

TY

C

LO

SE

O

U T

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACTI

NG

O

TH

ER

M

AT

ER

IA

L

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SE

O U

T

32 Hazardous Material Usage Report. Sec 01 57 19 Para 1.2 CEI Approval Required

33 Certificate of Hazardous Waste Training. Sec 01 57 19 Para 1.4.1 CEI Approval Required

34 Waste Analysis Reports. Sec 01 57 19 Para 1.4.2

35 Request for Disposal. Sec 01 57 19 Para 1.4.4 CEI Approval Required

36 Test Results. Sec 01 57 19 Para 1.4.4 CEI Approval Required

37 SPCC Plan. Sec 01 57 19 Para 1.5.2

38 Petroleum Container Storage Plan. Sec 01 57 19 Para 1.5.2 CEI Approval Required

39 Report of Waste Water Discharges. Sec 01 57 19 Para 1.6 CEI Approval Required

40 NPDES Weekly Inspection Reports. Sec 01 57 19 Para 1.7

41 NPDES CSW-NOI and SWPPP. Sec 01 57 019 Para 1.7.1 CEI Approval Required

42 NPDES CSW Permit. Sec 01 57 19 Para 1.7.1 CEI Approval Required

43 NPDES CSW Reports. Sec 01 57 19 Para 1.7.3 CEI Approval Required

44 SWPPP. Sec 01 57 19 Para 1.7.4 CEI Approval Required

45 NPDES / SWPPP Termination Letter. Sec 01 57 19 Para 1.7.5 CEI Approval Required

46 NPDES NOI Dewatering. Sec 01 57 19 Para 1.8 CEI Approval Required

47 NPDES Dewatering Permit. Sec 01 57 19 Para 1.8 CEI Approval Required

48 NPDES Permit Requirements. Sec 01 57 19 Para 1.8 CEI Approval Required

49 NPDES Dewatering Permit Disposal Method. Sec 01 57 19 Para

1.8 CEI Approval Required

50 Nonhazardous Solid Waste Diversion. Sec 01 57 19 Para 1.10 CEI Approval Required

51 Environmental Management System. Sec 01 57 19 Para 1.14 Within 10 days of

NTP

102-XXX SGBP XX-XXXX 1B-6

21-2061

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NAME,

Paint Hallways & Stairwells, B323

OFFUTT AFB, NEBRASKA

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

R

U C

TI

O

N S

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

SH

O

P D

R

AW

IN

G

S

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

R

AN

TY

C

LO

SE

O

U T

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACTI

NG

O

TH

ER

M

AT

ER

IA

L

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SE

O U

T

C - Include with line 15 Color Samples

LEGEND:

A - Include with line 10 Operations and Maintenance Manual B - Include with line 11 Warranty Book

NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

102-XXX SGBP XX-XXXX 1B-7

21-2062

APPROVED DISAPPROVED

1 Contractor Daily Logs. Sec 00 10 00 Para 1.8

2 Material Delivery Receipt. Sec 00 10 00 Para 1.11 CEI Approval Required

3 Traffic Control Plan. Sec 00 10 00 Para 1.12c As Required

4 Security - Listing of Employees. Sec 00 10 00 Para 1.23a Prior to start of any work

5 Security - Training. Sec 00 10 00 Para 1.23b Prior to start of any work

6 Confined Space Permit. Sec 00 10 00 Para 1.24c6 Prior to Confined Space work

7 Air Space Coordniation. Sec 00 10 00 Para 1.25 As Required

8 Digging Permit. Sec 00 10 00 Para 1.27a Prior to any Earthwork

9 Contractor Single Point of Contact. Sec 00 10 00 Para 1.37c Within 10 days of

NTP

10 AF Form 3064. Sec 00 10 00 Para 1.39 Within 10 days of NTP Must submit with #5

11 AF Form 3065. Sec 00 10 00 Para 1.39

12 MS Project Gant Schedule. Sec 00 10 00 Para 1.39 Within 10 days of NTP Must submit with #4

13 CD of all Submittals. Sec 00 10 00 Para 1.39 NLT + 30 days

BO

14 Project Commissioning Plan. Sec 00 10 00 Para 1.40 Within 30 days of

NTP

15 Termite Treatment Reporting. Sec 00 10 00 Para 1.42 As Required

16 O & M Manuals. Sec 00 10 00 Para 1.44 NLT + 30 days

BO

17 Warranty Book. Sec 00 10 00 Para 1.45 NLT + 30 days

BO

18 Extra Stock. Sec 00 10 00 Para 1.46 At Final Inspection

19 Shop Drawings. Sec 01 33 00 Para 1.1

20 Color Sample/Selections. Sec 01 33 00 Para 1.1

21 Close-out cd of all project submittals. Sec 01 33 00 Para 1.4D2n NLT + 90 days

22 As-Constucted Drawings Sec 01 33 00 Para 1.5 NLT + 90 days

23 Record Shop Drawings. Sec 01 33 00 Para 1.6

24 Draft DD Form 1354. Sec 01 33 00 Para 1.7 -30 days of BO

25 Interim DD Form 1354. Sec 01 33 00 Para 1.7 Beneficial Occupancy (BO)

Hardcopy provided at Beneficial Occupancy

26 Final DD Form 1354. Sec 01 33 00 Para 1.7 NLT + 30 days

BO

27 Corrective Plan for Lead Based Paint /Asbetos. Sec 01 33 00 Para 1.9

28 Personal Geodatabase. Sec 01 33 00 Para 1.10 NLT + 90 days

BO

29 Safety Data Sheets. Sec 01 57 19 Para 1.2.3 CEI Approval Required

30 Hazardous Material Storage Plan. Sec 01 57 19 Para 1.2.4 CEI Approval Required

31 Spill Reporting. Sec 01 57 19 Para 1.2.5 CEI Approval Required

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Paint West & South Exterior Walls, BUILDING 301D

OFFUTT AFB, NEBRASKA

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

R

U C

TI

O

N S

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

SH

O

P D

R

AW

IN

G

S

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

R

AN

TY

C

LO

SE

O

U T

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACTI

NG

O

TH

ER

M

AT

ER

IA

L

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SE

O U

T

01 33 01-5

21-2062

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Paint West & South Exterior Walls, BUILDING 301D

OFFUTT AFB, NEBRASKA

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

R

U C

TI

O

N S

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

SH

O

P D

R

AW

IN

G

S

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

R

AN

TY

C

LO

SE

O

U T

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACTI

NG

O

TH

ER

M

AT

ER

IA

L

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SE

O U

T

32 Contractor HAZMAT Request. Sec 01 57 19 Para 1.4 CEI Approval Required

33 Certificate of Hazardous Waste Training. Sec 01 57 19 Para 1.5.1 CEI Approval Required

34 Waste Analysis Reports. Sec 01 57 19 Para 1.5.4

35 Request for Disposal. Sec 01 57 19 Para 1.5.4 CEI Approval Required

36 Test Results. Sec 01 57 19 Para 1.5.4 CEI Approval Required

37 SPCC Plan. Sec 01 57 19 Para 1.6.2

38 Petroleum Container Storage Plan. Sec 01 57 19 Para 1.6.2 CEI Approval Required

39 Report of Waste Water Discharges. Sec 01 57 19 Para 1.7 CEI Approval Required

40 NPDES Weekly Inspection Reports. Sec 01 57 19 Para 1.8

41 NPDES CSW-NOI and SWPPP. Sec 01 57 019 Para 1.8.1 CEI Approval Required

42 NPDES CSW Permit. Sec 01 57 19 Para 1.8.1 CEI Approval Required

43 NPDES CSW Reports. Sec 01 57 19 Para 1.7.3 Sediment and Contamination Control Plan Sec 01 57 19 Para 1.8.4 CEI Approval Required

44 SWPPP. Sec 01 57 19 Para 1.7.4 CEI Approval Required

45 NPDES / SWPPP Termination Letter. Sec 01 57 19 Para 1.8.5 CEI Approval Required

46 NPDES NOI Dewatering. Sec 01 57 19 Para 1.9 CEI Approval Required

47 NPDES Dewatering Permit. Sec 01 57 19 Para 1.9 CEI Approval Required

48 NPDES Permit Requirements. Sec 01 57 19 Para 1.9 CEI Approval Required

49 NPDES Dewatering Permit Disposal Method. Sec 01 57 19 Para

1.9 CEI Approval Required

50 Nonhazardous Solid Waste Diversion. Sec 01 57 19 Para 1.11 CEI Approval Required

51 Environmental Management System. Sec 01 57 19 Para 1.15 Within 10 days of

NTP

01 33 01-6

21-2062

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Paint West & South Exterior Walls, BUILDING 301D

OFFUTT AFB, NEBRASKA

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

R

U C

TI

O

N S

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

SH

O

P D

R

AW

IN

G

S

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

R

AN

TY

C

LO

SE

O

U T

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACTI

NG

O

TH

ER

M

AT

ER

IA

L

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SE

O U

T

C - Include with line 15 Color Samples

LEGEND:

A - Include with line 10 Operations and Maintenance Manual B - Include with line 11 Warranty Book

NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

01 33 01-7

File details come from the government source that posted it. Updated .