55th Civil Engineer Squadron
Statement of Objectives
Date: 5 May 2020 Project #: SGBP 21-2061 Project Title: Paint Interior Hallways & Stairways, B323
Provide a proposal to provide all labor, equipment, and materials as required to patch and paint all Hallways and Stairwells in B323.
Objectives:
This project bid will include manpower to remove/re-install wall hangings, light and electrical outlet covers.
Patch/skim coat walls to have a smooth surface before painting. Painting will consist of at least 2 coats on walls and door frames.
Paint specs are SW 7079 Ponder (grey). Door frames will match existing color.
As Built Drawings will be made available as required.
General Requirements:
Item 1: All work will meet the International Building Code, Uniform Plumbing Code, National Electrical Code, NFPA 72 and any other applicable code requirement.
Item 2: Maintain work site in a clean and orderly manner so that the safest possible site is provided for workers and AF members.
Item 3: Infrastructure: The Contractor shall furnish all necessary infrastructure and incidentals to the installation of the prime mission equipment. The Contractor shall ensure that the infrastructure conforms to Offutt Design Compatibility Guidelines (DCG) for base architectural and civil engineering standards, all applicable base construction standards and complies with applicable federal, state and local codes and regulations.
Item 4: Equipment Installation and Integration: The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan. No alterations, additions, or deletions shall be made unless by prior approval of the Contracting Officer (CO).
In addition, the Contractor shall be responsible for the following actions:
a. Please refer to 00 10 00, 01 33 00, 01 57 19 and 01 33 01 of the Specs for additional information that may pertain to this project.