SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
SGBP 21-2061PROJECT NAME, Paint Hallways & Stairwells, B323 OFFUTT AFB, NEBRASKA
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
BEFORE CONSTRAFTER CONSTR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSCATALOG DATAOTHER MATERIAL OR DATACERTIFICATION OF COMPLIANCE AND CLOSEOUTCLOSEOUTMANUFACTURER'S WARRANTYOPERATING INSTRUCTIONS

REQUIRED SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGR. RETURN

SUSPENSE

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1Contractor Daily Logs. Sec 00 10 00 Para 1.9
2Material Delivery Receipt. Sec 00 10 00 Para 1.12CEI Approval Required
3Traffic Control Plan. Sec 00 10 00 Para 1.13cAs Required
4Security - Listing of Employees. Sec 00 10 00 Para 1.24aPrior to start of any work
5Security - Training. Sec 00 10 00 Para 1.24bPrior to start of any work
6Confined Space Permit. Sec 00 10 00 Para 1.25c6Prior to Confined Space work
7Air Space Coordniation. Sec 00 10 00 Para 1.26As Required
8Digging Permit. Sec 00 10 00 Para 1.28aPrior to any Earthwork
9Contractor Single Point of Contact. Sec 00 10 00 Para 1.38cWithin 10 days of NTP
10AF Form 3064. Sec 00 10 00 Para 1.40Within 10 days of NTPMust submit with #5
11AF Form 3065. Sec 00 10 00 Para 1.40
12MS Project Gant Schedule. Sec 00 10 00 Para 1.40Within 10 days of NTPMust submit with #4
13CD of all Submittals. Sec 00 10 00 Para 1.40NLT + 30 days BO
14Project Commissioning Plan. Sec 00 10 00 Para 1.41Within 30 days of NTP
15Termite Treatment Reporting. Sec 00 10 00 Para 1.43As Required
16O & M Manuals. Sec 00 10 00 Para 1.453NLT + 30 days BO
17Warranty Book. Sec 00 10 00 Para 1.463NLT + 30 days BO
18Extra Stock. Sec 00 10 00 Para 1.471At Final Inspection
19Shop Drawings. Sec 01 33 00 Para 1.1
20Color Sample/Selections. Sec 01 33 00 Para 1.1
21Close-out cd of all project submittals. Sec 01 33 00 Para 1.4D2n1NLT + 90 days
22As-Constucted Drawings Sec 01 33 00 Para 1.51NLT + 90 days
23Record Shop Drawings. Sec 01 33 00 Para 1.6
24Draft DD Form 1354. Sec 01 33 00 Para 1.71-30 days of BO
25Interim DD Form 1354. Sec 01 33 00 Para 1.71Beneficial Occupancy (BO)Hardcopy provided at Beneficial Occupancy
26Final DD Form 1354. Sec 01 33 00 Para 1.71NLT + 30 days BO
27Corrective Plan for Lead Based Paint /Asbetos. Sec 01 33 00 Para 1.9
28Personal Geodatabase. Sec 01 33 00 Para 1.109NLT + 90 days BO
29Safety Data Sheets. Sec 01 57 19 Para 1.1.3CEI Approval Required
30Hazardous Material Storage Plan. Sec 01 57 19 Para 1.1.5CEI Approval Required
31Spill Reporting. Sec 01 57 19 Para 1.1.6CEI Approval Required
32Hazardous Material Usage Report. Sec 01 57 19 Para 1.2CEI Approval Required
33Certificate of Hazardous Waste Training. Sec 01 57 19 Para 1.4.1CEI Approval Required
34Waste Analysis Reports. Sec 01 57 19 Para 1.4.2
35Request for Disposal. Sec 01 57 19 Para 1.4.4CEI Approval Required
36Test Results. Sec 01 57 19 Para 1.4.4CEI Approval Required
37SPCC Plan. Sec 01 57 19 Para 1.5.2
38Petroleum Container Storage Plan. Sec 01 57 19 Para 1.5.2CEI Approval Required
39Report of Waste Water Discharges. Sec 01 57 19 Para 1.6CEI Approval Required
40NPDES Weekly Inspection Reports. Sec 01 57 19 Para 1.7
41NPDES CSW-NOI and SWPPP. Sec 01 57 019 Para 1.7.1CEI Approval Required
42NPDES CSW Permit. Sec 01 57 19 Para 1.7.1CEI Approval Required
43NPDES CSW Reports. Sec 01 57 19 Para 1.7.3CEI Approval Required
44SWPPP. Sec 01 57 19 Para 1.7.4CEI Approval Required
45NPDES / SWPPP Termination Letter. Sec 01 57 19 Para 1.7.5CEI Approval Required
46NPDES NOI Dewatering. Sec 01 57 19 Para 1.8CEI Approval Required
47NPDES Dewatering Permit. Sec 01 57 19 Para 1.8CEI Approval Required
48NPDES Permit Requirements. Sec 01 57 19 Para 1.8CEI Approval Required
49NPDES Dewatering Permit Disposal Method. Sec 01 57 19 Para 1.8CEI Approval Required
50Nonhazardous Solid Waste Diversion. Sec 01 57 19 Para 1.10CEI Approval Required
51Environmental Management System. Sec 01 57 19 Para 1.14Within 10 days of NTP
52
53
54
55
56
57
58
59
60
61
62
63
64
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
LEGEND:
A - Include with line 10 Operations and Maintenance Manual
B - Include with line 11 Warranty Book
C - Include with line 15 Color Samples

102-XXX SGBP XX-XXXX 1B-&P