Notes_From_Site_Visit.pdf

PDF 10 KB Posted

Attached to
Power Plant Generator Mx Federal contract opportunity
Solicitation number
FA460019RA019
Issued by
Department of the Air Force Air Combat Command

About this file

Notes from Site Visit

View the file

Other files for this federal contract opportunity

Other files attached to Power Plant Generator Mx, newest first.
File Type Posted
Solicitation_Amendment_FA460019RA0190001.pdf PDF
B518_Work_Orders.pdf PDF
B518_Building_Equipment.pdf PDF
Questions_Received_After_Site_Visit_Answers.pdf PDF
FA460019RA019_Questions_1.pdf PDF
Site_Visit_Sin-in_Sheet.pdf PDF
FA460019RA019_Questions_2.pdf PDF
Wage_Determination_No_2015-5006.pdf PDF
Solicitation_-_FA460019RA019.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notes From Site Visit

FUEL: Base POL pumps fuel directly into storage location in the facility from which it is then redistributed to multiple storage locations in close proximity to each generator.

GENERATORS:

Generator 1: Built in 2009 – electric start – 13,800 volts – 2000 kilowatts Generator 4: Built in 1970 – Air Start – 4,160 volts – 3000 kilowatts – Has a minor leak but does not affect operation – scheduled for repair in October Generator 5: Built in 1970 – Air Start – 4,160 volts – 3000 kilowatts – Out of commission with no current plans for re-commissioning Generator 6: Built in 1970 – Air Start – 4,160 volts – 3000 kilowatts Generator 7: Built in 1997 – Air Start – 4,160 volts – 3000 kilowatts

RELAYS: All relays were recently recalibrated

CIRCUIT BREAKER: Some circuit breaker panels were recently rebuilt following the flooding

OPERTING SYSTEM: Allen Bradley is the system used for all the controllers

COOLING TOWER: The cooling tower supplies cooling to generators #4 & #6 (Cooper generators). The contractor is not responsible to maintain the cooling tower.

RESPONSIBILITIES:

-Contractor will be responsible to generate the power but any power leaving the facility will be the responsibility of CES -CES will be responsible to ensure the power gets to the expected locations -CES will be responsible for any major repairs to the facility (e.g. HVAC, plumbing, lighting)