Notes_From_Site_Visit.pdf
PDF 10 KB Posted
- Attached to
- Power Plant Generator Mx Federal contract opportunity
- Solicitation number
- FA460019RA019
About this file
Notes from Site Visit
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_FA460019RA0190001.pdf | ||
| B518_Work_Orders.pdf | ||
| B518_Building_Equipment.pdf | ||
| Questions_Received_After_Site_Visit_Answers.pdf | ||
| FA460019RA019_Questions_1.pdf | ||
| Site_Visit_Sin-in_Sheet.pdf | ||
| FA460019RA019_Questions_2.pdf | ||
| Wage_Determination_No_2015-5006.pdf | ||
| Solicitation_-_FA460019RA019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notes From Site Visit
FUEL: Base POL pumps fuel directly into storage location in the facility from which it is then redistributed to multiple storage locations in close proximity to each generator.
GENERATORS:
Generator 1: Built in 2009 – electric start – 13,800 volts – 2000 kilowatts Generator 4: Built in 1970 – Air Start – 4,160 volts – 3000 kilowatts – Has a minor leak but does not affect operation – scheduled for repair in October Generator 5: Built in 1970 – Air Start – 4,160 volts – 3000 kilowatts – Out of commission with no current plans for re-commissioning Generator 6: Built in 1970 – Air Start – 4,160 volts – 3000 kilowatts Generator 7: Built in 1997 – Air Start – 4,160 volts – 3000 kilowatts
RELAYS: All relays were recently recalibrated
CIRCUIT BREAKER: Some circuit breaker panels were recently rebuilt following the flooding
OPERTING SYSTEM: Allen Bradley is the system used for all the controllers
COOLING TOWER: The cooling tower supplies cooling to generators #4 & #6 (Cooper generators). The contractor is not responsible to maintain the cooling tower.
RESPONSIBILITIES:
-Contractor will be responsible to generate the power but any power leaving the facility will be the responsibility of CES -CES will be responsible to ensure the power gets to the expected locations -CES will be responsible for any major repairs to the facility (e.g. HVAC, plumbing, lighting)