FA460019RA019_Questions_1.pdf

PDF 59 KB Posted

Attached to
Power Plant Generator Mx Federal contract opportunity
Solicitation number
FA460019RA019
Issued by
Department of the Air Force Air Combat Command

About this file

Question and answers file 1

View the file

Other files for this federal contract opportunity

Other files attached to Power Plant Generator Mx, newest first.
File Type Posted
Solicitation_Amendment_FA460019RA0190001.pdf PDF
B518_Work_Orders.pdf PDF
B518_Building_Equipment.pdf PDF
Questions_Received_After_Site_Visit_Answers.pdf PDF
Notes_From_Site_Visit.pdf PDF
Site_Visit_Sin-in_Sheet.pdf PDF
FA460019RA019_Questions_2.pdf PDF
Solicitation_-_FA460019RA019.pdf PDF
Wage_Determination_No_2015-5006.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 August 26, 2019

# RFP Section Page Question

1 Page Limitations

49 Does Table of Contents count against page limit?

Answer: Addendum 1 to 52.212-1 did not explicitly state that the table of contents will not be counted towards the 10 page limit. Therefore, the Table of Contents counts towards the page limitation.

2 Subfactor 1

(Staffing Plan)

49 Are names and resumes required for the key positions in the staffing plan?

Answer: The requirement is for offerors to provide a list of qualifications. If offerors choice choose to provide resumes, this would be acceptable as long as a list of qualifications are provided as well or with-in it. However, offerors are reminded that there is a page limitation as referenced in the Addendum 1 to clause 52.212-1.

3 General N/A Can the government provide a property/equipment list?

Answer: Equipment type, quantity, and condition shall be verified in the site visit. Below is a list for reference of the five

(5) generators located in the facility. Please note that this is not a complete list of all equipment located in the facility.

D5090 DIESEL GENERATOR SET - 2,000 KW

D5090 DIESEL GENERATOR SET - 3,000 KW

D5090 DIESEL GENERATOR SET - 3,000 KW

D5090 DIESEL GENERATOR SET - 3,000 KW

D5090 DIESEL GENERATOR SET - 3,000 KW

4 General N/A Can the government provide clarification on method of proposal submission (i.e. number of copies requested (hard/soft) and delivery address and/or transmitted via email?)

Answer: Proposals should be submitted via email to kade.forrester.1@us.af.mil

5 General N/A Can the government provide the name of manufacturer for the generators and the quantity generators located at Bldg. 518?

Answer: The manufacturer make and model will be verified during the site visit.

mailto:kade.forrester.1@us.af.mil

2 August 26, 2019

6 General N/A Is there an anticipated Transition period and if so, what is the

POP?

Answer: There will not be a transition period.

7 General N/A Will the government provide any operating systems to support PWS requirements?

Answer: There is no operating system for this plant. Everything is manually operated.

8 General N/A Will the government provide equipment users/operators manuals and related documents?

Answer: Any manuals or documentations of equipment will be turned over to contractor to reference and maintain.

9 PWS 4.7

(Qualifications)

10 What is the level of security clearance required to support PWS performance?

Answer: Confidential Clearance

10 PWS 1.1

Basic service

4 Is all the associated equipment located in Bldg. 518 or is there also associated equipment in Bldg. 500?

Answer: Equipment is only located in B518.

11 PWS1.1

Basic service

4 Is the cost of the fuel included in the price for the contract or does the government cover the cost of fuel?

Answer: The Government will cover the cost of fuel.

12 PWS 1.2.2

Power Plant

5 Will daily logs and historical maintenance records be available for review?

Answer: Yes. Records of maintenance and repairs will remain with the equipment.

13 PWS 1.3.1

Critical equipment

6 Are the subsystems also housed in Bldg. 500, and what is the scope of the OEM subsystems?

Answer: Everything the contractor is responsible for is located at B518. The radiators for #1 and #7 are just outside of B518.

The cooling tower (B519) for #4 and #6 is maintained by the maintenance contractor for the B500 complex.

14 Work Order Program

PWS 1.4

6 For repair work that will exceed 50 hours and $2,000; will the development of the cost estimate and time spent obtaining quotes be reimbursable through CLIN X002?

3 August 26, 2019

Answer: The development of cost estimates will be incorporated in the contractor’s overhead of quotes.

15 DD254 N/A What are the requirements of the DD254?

Answer: The Winning contractor will be provided additional information after award.Due to the security requirement for this facility a DD254 is not required.