FA460019RA019_Questions_1.pdf
PDF 59 KB Posted
- Attached to
- Power Plant Generator Mx Federal contract opportunity
- Solicitation number
- FA460019RA019
About this file
Question and answers file 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_FA460019RA0190001.pdf | ||
| B518_Work_Orders.pdf | ||
| B518_Building_Equipment.pdf | ||
| Questions_Received_After_Site_Visit_Answers.pdf | ||
| Notes_From_Site_Visit.pdf | ||
| Site_Visit_Sin-in_Sheet.pdf | ||
| FA460019RA019_Questions_2.pdf | ||
| Solicitation_-_FA460019RA019.pdf | ||
| Wage_Determination_No_2015-5006.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 August 26, 2019
# RFP Section Page Question
1 Page Limitations
49 Does Table of Contents count against page limit?
Answer: Addendum 1 to 52.212-1 did not explicitly state that the table of contents will not be counted towards the 10 page limit. Therefore, the Table of Contents counts towards the page limitation.
2 Subfactor 1
(Staffing Plan)
49 Are names and resumes required for the key positions in the staffing plan?
Answer: The requirement is for offerors to provide a list of qualifications. If offerors choice choose to provide resumes, this would be acceptable as long as a list of qualifications are provided as well or with-in it. However, offerors are reminded that there is a page limitation as referenced in the Addendum 1 to clause 52.212-1.
3 General N/A Can the government provide a property/equipment list?
Answer: Equipment type, quantity, and condition shall be verified in the site visit. Below is a list for reference of the five
(5) generators located in the facility. Please note that this is not a complete list of all equipment located in the facility.
D5090 DIESEL GENERATOR SET - 2,000 KW
D5090 DIESEL GENERATOR SET - 3,000 KW
D5090 DIESEL GENERATOR SET - 3,000 KW
D5090 DIESEL GENERATOR SET - 3,000 KW
D5090 DIESEL GENERATOR SET - 3,000 KW
4 General N/A Can the government provide clarification on method of proposal submission (i.e. number of copies requested (hard/soft) and delivery address and/or transmitted via email?)
Answer: Proposals should be submitted via email to kade.forrester.1@us.af.mil
5 General N/A Can the government provide the name of manufacturer for the generators and the quantity generators located at Bldg. 518?
Answer: The manufacturer make and model will be verified during the site visit.
mailto:kade.forrester.1@us.af.mil
2 August 26, 2019
6 General N/A Is there an anticipated Transition period and if so, what is the
POP?
Answer: There will not be a transition period.
7 General N/A Will the government provide any operating systems to support PWS requirements?
Answer: There is no operating system for this plant. Everything is manually operated.
8 General N/A Will the government provide equipment users/operators manuals and related documents?
Answer: Any manuals or documentations of equipment will be turned over to contractor to reference and maintain.
9 PWS 4.7
(Qualifications)
10 What is the level of security clearance required to support PWS performance?
Answer: Confidential Clearance
10 PWS 1.1
Basic service
4 Is all the associated equipment located in Bldg. 518 or is there also associated equipment in Bldg. 500?
Answer: Equipment is only located in B518.
11 PWS1.1
Basic service
4 Is the cost of the fuel included in the price for the contract or does the government cover the cost of fuel?
Answer: The Government will cover the cost of fuel.
12 PWS 1.2.2
Power Plant
5 Will daily logs and historical maintenance records be available for review?
Answer: Yes. Records of maintenance and repairs will remain with the equipment.
13 PWS 1.3.1
Critical equipment
6 Are the subsystems also housed in Bldg. 500, and what is the scope of the OEM subsystems?
Answer: Everything the contractor is responsible for is located at B518. The radiators for #1 and #7 are just outside of B518.
The cooling tower (B519) for #4 and #6 is maintained by the maintenance contractor for the B500 complex.
14 Work Order Program
PWS 1.4
6 For repair work that will exceed 50 hours and $2,000; will the development of the cost estimate and time spent obtaining quotes be reimbursable through CLIN X002?
3 August 26, 2019
Answer: The development of cost estimates will be incorporated in the contractor’s overhead of quotes.
15 DD254 N/A What are the requirements of the DD254?
Answer: The Winning contractor will be provided additional information after award.Due to the security requirement for this facility a DD254 is not required.