FA460019RA019_Questions_1.pdf

PDF 59 KB Posted

Attached to
Power Plant Generator Mx
Solicitation number
FA460019RA019
Issued by

About this file

Question and answers file 1

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 August 26, 2019

# RFP Section Page Question

1 Page Limitations

49 Does Table of Contents count against page limit?

Answer: Addendum 1 to 52.212-1 did not explicitly state that the table of contents will not be counted towards the 10 page limit. Therefore, the Table of Contents counts towards the page limitation.

2 Subfactor 1

(Staffing Plan)

49 Are names and resumes required for the key positions in the staffing plan?

Answer: The requirement is for offerors to provide a list of qualifications. If offerors choice choose to provide resumes, this would be acceptable as long as a list of qualifications are provided as well or with-in it. However, offerors are reminded that there is a page limitation as referenced in the Addendum 1 to clause 52.212-1.

3 General N/A Can the government provide a property/equipment list?

Answer: Equipment type, quantity, and condition shall be verified in the site visit. Below is a list for reference of the five

(5) generators located in the facility. Please note that this is not a complete list of all equipment located in the facility.

D5090 DIESEL GENERATOR SET - 2,000 KW

D5090 DIESEL GENERATOR SET - 3,000 KW

D5090 DIESEL GENERATOR SET - 3,000 KW

D5090 DIESEL GENERATOR SET - 3,000 KW

D5090 DIESEL GENERATOR SET - 3,000 KW

4 General N/A Can the government provide clarification on method of proposal submission (i.e. number of copies requested (hard/soft) and delivery address and/or transmitted via email?)

Answer: Proposals should be submitted via email to kade.forrester.1@us.af.mil

5 General N/A Can the government provide the name of manufacturer for the generators and the quantity generators located at Bldg. 518?

Answer: The manufacturer make and model will be verified during the site visit.

mailto:kade.forrester.1@us.af.mil

2 August 26, 2019

6 General N/A Is there an anticipated Transition period and if so, what is the

POP?

Answer: There will not be a transition period.

7 General N/A Will the government provide any operating systems to support PWS requirements?

Answer: There is no operating system for this plant. Everything is manually operated.

8 General N/A Will the government provide equipment users/operators manuals and related documents?

Answer: Any manuals or documentations of equipment will be turned over to contractor to reference and maintain.

9 PWS 4.7

(Qualifications)

10 What is the level of security clearance required to support PWS performance?

Answer: Confidential Clearance

10 PWS 1.1

Basic service

4 Is all the associated equipment located in Bldg. 518 or is there also associated equipment in Bldg. 500?

Answer: Equipment is only located in B518.

11 PWS1.1

Basic service

4 Is the cost of the fuel included in the price for the contract or does the government cover the cost of fuel?

Answer: The Government will cover the cost of fuel.

12 PWS 1.2.2

Power Plant

5 Will daily logs and historical maintenance records be available for review?

Answer: Yes. Records of maintenance and repairs will remain with the equipment.

13 PWS 1.3.1

Critical equipment

6 Are the subsystems also housed in Bldg. 500, and what is the scope of the OEM subsystems?

Answer: Everything the contractor is responsible for is located at B518. The radiators for #1 and #7 are just outside of B518.

The cooling tower (B519) for #4 and #6 is maintained by the maintenance contractor for the B500 complex.

14 Work Order Program

PWS 1.4

6 For repair work that will exceed 50 hours and $2,000; will the development of the cost estimate and time spent obtaining quotes be reimbursable through CLIN X002?

3 August 26, 2019

Answer: The development of cost estimates will be incorporated in the contractor’s overhead of quotes.

15 DD254 N/A What are the requirements of the DD254?

Answer: The Winning contractor will be provided additional information after award.Due to the security requirement for this facility a DD254 is not required.