FA4528-13-R-0005_SABER_Amendment_0001.doc
DOC document 47 KB Posted
- Solicitation number
- FA4528-13-R-0005
About this file
FA4528-13-R-0005 SABER RFP Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Justification_and_Approval_-_SABER_Ceiling_Increase.pdf | ||
| SABER_Amendment_00002.pdf | ||
| Attachment_11_Pre-Price_Item_Book.docx | DOCX document | |
| Attachment_8_PPQ_13_MAR_13.docx | DOCX document | |
| Attachment_4_Heavy_Construction_Wage_Determinations_ND15.docx | DOCX document | |
| Attachment_2_SABER__IDIQ_Statement_of_Work.docx | DOCX document | |
| Attachment_9_COEFFICIENT_SCHEDULE_B_SABER.docx | DOCX document | |
| Attachment_1_SABER_Technical_Specification.pdf | ||
| 13-R-0005_SABER_RFP.doc | DOC document | |
| Attachment_3_Building_Wage_Determinations_ND5.docx | DOCX document | |
| Attachment_7_Residential_Construction_Wage_Determinations_ND10.docx | DOCX document | |
| 11-0142_AUTOCAD_DRAWINGS.pdf | ||
| Attachment_6_Highway_Construction_Wage_Determinations_ND2.docx | DOCX document | |
| Attachment_5_Heavy_Construction_Wage_Determinations_ND19.docx | DOCX document | |
| Attachment_10_BANK_INFO_SABER.doc | DOC document | |
| 11-0142_AF_FORM_66.pdf | ||
| Attachment_8_PPQ.docx | DOCX document | |
| 11-0142_STATEMENT_OF_WORK.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 20-Mar-2013 02:00 PM to 25-Mar-2013 02:00 PM.
SECTION I - CONTRACT CLAUSES
The following have been deleted:
52.204-99 SAM DEVIATION
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF DOCUMENT, EXHIBITS
SECTION J
LIST OF ATTACHMENTS
(All listed documents are at the end of this document)
ITEM NR
SPECIFICATIONS, STANDARDS AND/OR ATTACHMENTS
Attachment 1 Technical Specifications, SABER, Minot AFB, ND, dated 11 Dec 2012, Cover page thru Section 19120, 1008 pages (to include the index pages)
Attachment 2 SABER Statement of Work (SOW) dated Nov 2012, pages 1 thru 34
Attachment 3 Building Construction Wage Determinations ND130005 ND5, dated 01/04/2013, pages 1 thru 6
Attachment 4 Heavy Construction Wage Determinations ND130015 ND15, dated 01/04/2013, pages 1 thru 7
Attachment 5 Heavy Construction Wage Determinations ND130019 ND19, dated 01/04/2013, pages 1 thru 7
Attachment 6 Highway Construction Wage Determinations ND130002 ND2, dated 01/04/2013, pages 1 thru 8
Attachment 7 Residential Construction Wage Determinations ND130010 ND10, dated 01/04/2013, pages 1 thru 4
Attachment 8 Past Performance Questionnaire dated 13 Mar 2013, pages 1 thru 7
Attachment 9 Coefficient Schedule B, pages 1 thru 5
Attachment 10 Financial Questionnaire, pages 1
Attachment 11 Pre-Price Item Book, pages 1 thru 3
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
The following have been added by full text:
CCR REPS & CERTS
CENTRAL CONTRACTOR REGISTRATION(CCR)
CCR has been replaced by the System for Award Management (SAM). The website https://ccr.gov will redirect the user to https://sam.gov automatically. SAM is now the central location for assertions, representations, and certifications.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .