Attachment 11 Pre-Price Item Book Offerors shall complete this document and submit it as part of their proposal.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Justification_and_Approval_-_SABER_Ceiling_Increase.pdf PDF
SABER_Amendment_00002.pdf PDF
Attachment_8_PPQ_13_MAR_13.docx DOCX document
FA4528-13-R-0005_SABER_Amendment_0001.doc DOC document
Attachment_7_Residential_Construction_Wage_Determinations_ND10.docx DOCX document
11-0142_AUTOCAD_DRAWINGS.pdf PDF
Attachment_10_BANK_INFO_SABER.doc DOC document
Attachment_4_Heavy_Construction_Wage_Determinations_ND15.docx DOCX document
Attachment_5_Heavy_Construction_Wage_Determinations_ND19.docx DOCX document
11-0142_STATEMENT_OF_WORK.pdf PDF
Attachment_8_PPQ.docx DOCX document
Attachment_2_SABER__IDIQ_Statement_of_Work.docx DOCX document
Attachment_9_COEFFICIENT_SCHEDULE_B_SABER.docx DOCX document
Attachment_1_SABER_Technical_Specification.pdf PDF
13-R-0005_SABER_RFP.doc DOC document
Attachment_3_Building_Wage_Determinations_ND5.docx DOCX document
Attachment_6_Highway_Construction_Wage_Determinations_ND2.docx DOCX document
11-0142_AF_FORM_66.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-PRICE BOOK (PPB)

The PPB shall be updated to current year pricing after adoption of the new UPB. Contractor shall not include Division 1, General requirements, of the MEANS facility data base; it is included as part of the Contractor’s coefficient.

The following local tasks shall be added to the MEANS data base by the Contractor as part of this contract.

UNIT PRICE BOOK SUPPLEMENT

UNIT OF
ITEM DESCRIPTIONMEASURECOST

1. AGGREGATE TESTS:

1.1. Gradation, ASTM C136, C117 each

2. SOIL TESTS:

2.1.Moisture-Density Relation of Soils, Mil Std 621A,each
Method 100, CE-55 or ASTM D1557
2.2.Density of Soil, Nuclear or Sand-cone Methods,each
ASTM D1556 or ASTM D2922

3. CONCRETE TESTS:

3.1.Cast Concrete Test Specimens (Includes slump, aireach
content and unit weight, temperature and casting
of set of cylinders or beam
3.2.Compression Test of Concrete Cylinder, ASTM C39each

4. ASPHALT AND BITUMINOUS TESTS:

4.1. Common Fill, Haul, and Deliver ton

5. GENERAL ITEMS:

5.1.Mobilization, Minot Laboratory to MAFB and Returntrip
5.2.Mobilization, Drill Rig and Two-man Crew, Minottrip
Laboratory to MAFB and Return
5.3.Mobilization, MAFB Lab Trailer to Job Sitetrip

6. EQUIPMENT RENTAL:

6.1. 25 Cubic Yard Dumpster each

7. BORING-HORIZONTAL:

7.1.8" Dia Casing .25 Thicklf
Jacking Pit and Dewatering Not Included
7.2.12" Dia Casing .25 Thicklf
W/10" ABS Plastic Pipe Schedule 40,
Jacking Pit and Dewatering Not Included

8. FLOORING-INTERIOR:

8.1.10” Bronze Kick Plateeach
8.2.Flooring, Rubber Tile, Endura (Standard Colors)sf
8.3.Stair Treads, Rubber, Endura, (Standard Colors)lf
8.4.Adhesive, Endura Tilegal
8.5.Multi-Spec paintsf

9. REINSTALL GOVERNMENT EQUIPMENT:

9.1.Remove/reinstall, Water Closeteach
9.2.Remove/reinstall, Wall Hung Urinaleach
9.3.Remove/reinstall, Water Coolereach
9.4.Remove/reinstall, Existing Fluorescent Light Fixture (2x4)each
9.5.Remove/reinstall, Fire Detectoreach
9.6.Remove/reinstall, thermostateach
9.7.Remove/reinstall, clean, paint, fin tube coverseach
9.8.Remove/reinstall, Exit Lighteach

10. ELECTRICAL:

10.1. Hubbell Recessed Emergency Light, RG-6-8each
10.2. Fixture Support wireeach
10.3. Remove/reinstall heat detector, pull station, fire alarmeach
10.4. Head bolt heatereach
10.5. Recessed light with 40-100w bulb includedeach
10.6. Dismantle fixtureeach
10.7. Remove/reinstall, Emergency Lighteach
10.8. Phone terminations by paireach
10.9. Phone labelseach

10.10. Smoke Detector, Photo, True Alarm, Simplex

#4098-9601, with 2-wire base, simplex #4098-9788each
10.11. Fixture, LED, 2′x 2′, 2′x 4′, T-8each
10.12. Fixture, LED, 2′x 4′, T-5each
10.13. Exit sign, LEDeach
10.14. Remove/reinstall telephone, (plate & jack),each
10.15. Remove/reinstall voice data plateseach
10.16. Remove/reinstall ceiling mount projectorseach
10.17. Remove/reinstall, ceiling mount projector screens.each

11. MECHANICAL:

11.1. ½″ Drop ear elboweach
11.2. Copper support bracketeach
11.3. 2″, 3″, or 4″ Fernco Cap (cap off existing sewer lines)each
11.4. 8″ spin in collareach
11.5. 10″ spin in collareach

12. EARTH WORK:

12.1. Common Fill, Haul/Deliver ton

Attachment #11 “Pre Price Book” 13 MAR 13