Attachment_11_Pre-Price_Item_Book.docx
DOCX document 22 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA4528-13-R-0005
About this file
Attachment 11 Pre-Price Item Book Offerors shall complete this document and submit it as part of their proposal.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PRICE BOOK (PPB)
The PPB shall be updated to current year pricing after adoption of the new UPB. Contractor shall not include Division 1, General requirements, of the MEANS facility data base; it is included as part of the Contractor’s coefficient.
The following local tasks shall be added to the MEANS data base by the Contractor as part of this contract.
UNIT PRICE BOOK SUPPLEMENT
| UNIT OF | ||
| ITEM DESCRIPTION | MEASURE | COST |
1. AGGREGATE TESTS:
1.1. Gradation, ASTM C136, C117 each
2. SOIL TESTS:
| 2.1. | Moisture-Density Relation of Soils, Mil Std 621A, | each |
| Method 100, CE-55 or ASTM D1557 | ||
| 2.2. | Density of Soil, Nuclear or Sand-cone Methods, | each |
| ASTM D1556 or ASTM D2922 |
3. CONCRETE TESTS:
| 3.1. | Cast Concrete Test Specimens (Includes slump, air | each |
| content and unit weight, temperature and casting | ||
| of set of cylinders or beam | ||
| 3.2. | Compression Test of Concrete Cylinder, ASTM C39 | each |
4. ASPHALT AND BITUMINOUS TESTS:
4.1. Common Fill, Haul, and Deliver ton
5. GENERAL ITEMS:
| 5.1. | Mobilization, Minot Laboratory to MAFB and Return | trip |
| 5.2. | Mobilization, Drill Rig and Two-man Crew, Minot | trip |
| Laboratory to MAFB and Return | ||
| 5.3. | Mobilization, MAFB Lab Trailer to Job Site | trip |
6. EQUIPMENT RENTAL:
6.1. 25 Cubic Yard Dumpster each
7. BORING-HORIZONTAL:
| 7.1. | 8" Dia Casing .25 Thick | lf |
| Jacking Pit and Dewatering Not Included | ||
| 7.2. | 12" Dia Casing .25 Thick | lf |
| W/10" ABS Plastic Pipe Schedule 40, | ||
| Jacking Pit and Dewatering Not Included |
8. FLOORING-INTERIOR:
| 8.1. | 10” Bronze Kick Plate | each |
| 8.2. | Flooring, Rubber Tile, Endura (Standard Colors) | sf |
| 8.3. | Stair Treads, Rubber, Endura, (Standard Colors) | lf |
| 8.4. | Adhesive, Endura Tile | gal |
| 8.5. | Multi-Spec paint | sf |
9. REINSTALL GOVERNMENT EQUIPMENT:
| 9.1. | Remove/reinstall, Water Closet | each |
| 9.2. | Remove/reinstall, Wall Hung Urinal | each |
| 9.3. | Remove/reinstall, Water Cooler | each |
| 9.4. | Remove/reinstall, Existing Fluorescent Light Fixture (2x4) | each |
| 9.5. | Remove/reinstall, Fire Detector | each |
| 9.6. | Remove/reinstall, thermostat | each |
| 9.7. | Remove/reinstall, clean, paint, fin tube covers | each |
| 9.8. | Remove/reinstall, Exit Light | each |
10. ELECTRICAL:
| 10.1. Hubbell Recessed Emergency Light, RG-6-8 | each |
| 10.2. Fixture Support wire | each |
| 10.3. Remove/reinstall heat detector, pull station, fire alarm | each |
| 10.4. Head bolt heater | each |
| 10.5. Recessed light with 40-100w bulb included | each |
| 10.6. Dismantle fixture | each |
| 10.7. Remove/reinstall, Emergency Light | each |
| 10.8. Phone terminations by pair | each |
| 10.9. Phone labels | each |
10.10. Smoke Detector, Photo, True Alarm, Simplex
| #4098-9601, with 2-wire base, simplex #4098-9788 | each | |
| 10.11. Fixture, LED, 2′x 2′, 2′x 4′, T-8 | each | |
| 10.12. Fixture, LED, 2′x 4′, T-5 | each | |
| 10.13. Exit sign, LED | each | |
| 10.14. Remove/reinstall telephone, (plate & jack), | each | |
| 10.15. Remove/reinstall voice data plates | each | |
| 10.16. Remove/reinstall ceiling mount projectors | each | |
| 10.17. Remove/reinstall, ceiling mount projector screens. | each |
11. MECHANICAL:
| 11.1. ½″ Drop ear elbow | each |
| 11.2. Copper support bracket | each |
| 11.3. 2″, 3″, or 4″ Fernco Cap (cap off existing sewer lines) | each |
| 11.4. 8″ spin in collar | each |
| 11.5. 10″ spin in collar | each |
12. EARTH WORK:
12.1. Common Fill, Haul/Deliver ton
Attachment #11 “Pre Price Book” 13 MAR 13
File details come from the government source that posted it. Updated .