Attachment 2 SABER Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Justification_and_Approval_-_SABER_Ceiling_Increase.pdf PDF
SABER_Amendment_00002.pdf PDF
Attachment_11_Pre-Price_Item_Book.docx DOCX document
Attachment_8_PPQ_13_MAR_13.docx DOCX document
FA4528-13-R-0005_SABER_Amendment_0001.doc DOC document
Attachment_7_Residential_Construction_Wage_Determinations_ND10.docx DOCX document
11-0142_AUTOCAD_DRAWINGS.pdf PDF
Attachment_10_BANK_INFO_SABER.doc DOC document
Attachment_4_Heavy_Construction_Wage_Determinations_ND15.docx DOCX document
Attachment_5_Heavy_Construction_Wage_Determinations_ND19.docx DOCX document
11-0142_STATEMENT_OF_WORK.pdf PDF
Attachment_8_PPQ.docx DOCX document
Attachment_9_COEFFICIENT_SCHEDULE_B_SABER.docx DOCX document
Attachment_1_SABER_Technical_Specification.pdf PDF
13-R-0005_SABER_RFP.doc DOC document
Attachment_3_Building_Wage_Determinations_ND5.docx DOCX document
Attachment_6_Highway_Construction_Wage_Determinations_ND2.docx DOCX document
11-0142_AF_FORM_66.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

SABER

SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS

MINOT AIR FORCE BASE, NORTH DAKOTA

FEBRUARY 2013

STATEMENT OF WORK TABLE OF CONTENTS

SECTIONDESCRIPTIONPAGE
1.0Project Description ......................................................................................3
2.0Work by the Government ............................................................................3
3.0Performance Capabilities.............................................................................4
4.0Technical Design Support ...........................................................................6
5.0Management Plan ............................................................................................6
6.0Design and Construction Requirements.......................................................... 7
7.0Quality Control ............................................................................................8
8.0Site Office ....................................................................................................8
9.0Protection of Contractor’s Equipment and Government Property ..............9
10.0Provisions on Contracting Officer’s Authority ...........................................9
11.0Delivery Order Pricing ...............................................................................9
12.0Computer Requirements ............................................................................13
13.0Communication .........................................................................................14
14.0Construction Start-Up Period ....................................................................14
15.0Pre-Performance Conferences ...................................................................14
16.0Ordering Procedures ..................................................................................14
17.0Delivery Order Proposal Evaluation..........................................................17
18.0Commencement, execution, Completion and Payment for Work…...........17
19.0Jobsite Verification / Government-Furnished Record Drawings ..............21
20.0Excavation Around Utilities ..........................................................................22
21.0Pre-Final and Final Inspections ....................................................................22
22.0Warranty ....................................................................................................23
23.0Contractor’s As-Built Drawings ................................................................24
24.0Government Furnished Equipment / Materials .........................................24
25.0Scheduling Work .......................................................................................25
26.0Work in Occupied Areas ...........................................................................25
27.0Coordinating with Government Activities....................................................25
28.0Noise Control.............................................................................................26
29.0Construction Site .......................................................................................26
30.0Contractor Parking.....................................................................................27
31.0Transportation of Construction Equipment ...............................................27
32.0Base Fire Regulations ................................................................................27
33.0Airfield Requirements ...............................................................................27
34.0Environmental Safety and Health...............................................................27

Abbreviations

SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER) STATEMENT OF WORK

1.0 PROJECT DESCRIPTION

1.1 The Simplified Acquisition of Base Engineer Requirement (SABER) contract is an indefinite delivery, indefinite quantity contract required to accomplish a broad range of construction, sustainment, restoration and modernization projects on real property at Minot Air Force Base (MAFB), North Dakota (ND) that are of a suitable size and complexity to allow for quick design execution and construction. Work may include maintenance, repair, alteration renovation and new construction. Minot Air Force Base is home to two major Air Force units, the 5th Bomb Wing and the 91st Missile Wing. The Minot Air Force Base (MAFB) SABER contract’s primary goal is to expedite contract award by reducing 5th Civil Engineering Squadron’s (5CES) design work and acquisition lead time. Prompt response and execution of all delivery orders is required. The Contracting Officer (CO) will issue a request for proposal (RFP) describing basic requirements for each individual delivery order (DO). Following review of the Contractor’s DO proposal, the CO will negotiate with the Contractor, and award an individual DO. The Contractor will be required to maintain a response time of 2 hours of an emergency call or have a representative available to response to an emergency request in the MAFB. The Contractor would also be required to facilitate receipt of each RFP and provide other services as described in Section 3.0 – PERFORMANCE CAPABILITIES.

1.2 Each construction project will be awarded on a DO basis, issued against the basic contract. Each DO shall specify work that may include a variety of project scopes and disciplines. The Government will provide only basic design information for each RFP. The Contractor shall perform any design required to construct and provide construction and complete as-built drawings. The Contractor will be paid a percentage of the design fee which shall be proposed in the offer schedule. The Contractor shall provide sufficient technical support and project management to assure quality and completeness of DO proposals, accommodate a number of concurrent active projects, provide flexibility of design staff and subcontractor pool to handle rapid increases in work volume, process submittals in a timely manner, and perform according to schedule. In most instances the design will already be completed by the Government. In this case, the Contractor will propose the non-design fee from the offer schedule. In the case where the Government provides the contractor the design and statement of work, the Contractor shall be required to attend initial project site visits, obtaining necessary information about the project, prepare cost estimates, and negotiate the project cost. The contractor may on occasion be required to provide for large unexpected fluctuations in the workload.

1.3 In accordance with (IAW) Section 01000, General Requirements Specification, standard hours are 0730-1630, Monday through Friday. All other work periods, except Federal Holidays, are considered non-standard. Approval to work outside standard hours must be approved in advance according to the provisions in Section 01000.

2.0 WORK BY THE GOVERNMENT: The Government is not obligated to issue any particular type of work under this contract and reserves the right to accomplish work using Government workforces or by other contracts, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this contract.

3.0 PERFORMANCE CAPABILITIES

3.1 The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals necessary to provide complete and fully operational facilities and/or systems. The final product provided by the Contractor shall conform to government accepted commercial/industrial quality standards in regards to fit, finish, form and function as detailed in each DO’s Statement of Work (SOW), the SABER Technical Specifications and industry standards as typically referenced to and utilized by the trades industries.

3.2 The successful firm selected as the SABER Contractor shall be a general construction firm, capable of providing a minimum design and diversified construction services. At a minimum, the Contractor shall maintain the following management and technical support capabilities throughout the duration of this contract. An organization chart shall be provided fully depicting all staff members, their title, full or part time, and shall be updated as changes occur.

3.3 MINIMUM DESIGN: The Government determines what constitutes minimum design. Minimum design is defined as “A design effort that is incidental to accomplishing the required task”. Generally, minimum design would be exceeded if a typical general construction contractor would need to hire additional expertise in order to accomplish the project or there is a specific cost associated with the “minimum design”. However, where a simple design need the services of a Manufacture Certification the Government will determine the best option to execute the project. Incidentals related to accomplishing the required minimal design product shall include efforts such as site visits, design meetings, detailed contractor-developed statement of work, contractor’s cost proposal, detailed contractor-developed drawings, Government-Contractor negotiations, final negotiated cost proposal, and any other efforts associated with the minimum design. In most instances where the government execute the minimum design the Contractor effort shall include as such as site visits, contractor’s cost proposal, Government-Contractor negotiations, final negotiated cost proposal, and any other efforts associated with the project award.

3.4 Contractor Personnel

3.4.1 Contractor’s Contract Manager (CM): The CM will be responsible for the overall performance of this contract. The CM shall have minimum five (5) years previous experience as primary manager with a general contracting firm engaged in multiple discipline commercial construction projects. This individual(s) shall have direct oversight of all project design and planning activities. The name of this person and alternates, who shall act for the contractor when the CM is absent, shall be designated in writing to the Contracting Officer. The CM will receive each RFP. The Contractor shall provide quality, cost effective design for multiple DOs simultaneously within the time constraints stated in Section 16.0 – ORDERING PROCEDURES. The Contractor Manager shall complete a minimum design and drawings to a point where the architectural, civil, structural, mechanical, and electrical drawings clearly indicate the proposed method of accomplishing the work, and annotate the description, size, and location of each item listed in the detailed cost proposal. The Contractor’s design and drawings must comply with the Government’s concept design requirements as well as all governing codes (See Section 6.0 – DESIGN AND CONSTRUCTION REQUIREMENTS). The Contractor is expected to use recognized industry standard practice in determining their proposed design materials and methods, unless the Government specifies otherwise. Where the Government chooses to execute the minimum design for a particular DO, the contractor will be required to submit a Contractor’s cost estimate, Material Approval Submittal form, Contract Progress Schedules Form, and Contractor Progress Report form (See Section 18.0 – COMMENCEMENT, EXECUTION, COMPLETION AND PAYMENT FOR WORK).

3.4.2 Contractor’s Quality Control Manager (QCM): Provides quality control management for all active DOs and executes the Quality Control (QC) plan. The QCM shall have the minimum qualifications set forth in the specifications, Section 01450, subsection 1.5.1.2, Quality Control Specification. The QCM shall visit each active project site daily to ensure full compliance with all safety requirements, and verify that the materials and workmanship are in accordance with the approved construction drawings, shop drawings, material submittals and technical specifications. The QCM shall prepare and coordinate material submittal sheets and shop drawing submittals, prepare QC reports, schedule and coordinate testing procedures and attend all status meetings, site visits, and pre-final/final inspections. The QCM under this contract can provide and execute the services of the CM, likewise the CM executing the services of a QCM, but shall not execute the services of a Project Superintendent.

3.4.3 Contractor’s Project Superintendent (PS): Provides on-site supervision. The PS shall visit each active project site daily, submit detailed progress reports (AF Form 3065) for each DO, schedule and coordinate subcontractors and material suppliers, and attend all status meetings, site visits and pre-final/final inspections. For each specific delivery order issued, the contractor shall establish an alternate superintendent to act on behalf of the project superintendent during his absence from a particular jobsite. On all DOs, either the PS or alternate shall be at each active project site during scheduled work hours unless otherwise directed by the Contracting Officer. Superintendents shall have a minimum of 1 (one) year previous experience as a project superintendent (exclusive of time employed as a tradesman or working foreman) for a general contracting firm overseeing one or more multi-discipline commercial construction projects. The PS cannot be the QCM and subcontractors may not perform duties of the PS.

3.4.4 The Contractor shall also provide and maintain the following capabilities to support the MAFB SABER contract.

3.4.4.1 Design/Drafting: Provide a computer aided design and drafting (CADD) technician support capable of producing construction documents for each individual DO within the time constraints specified in Section 16.0 – ORDERING PROCEDURES.

3.4.4.2 Provide a qualified, competent, academically and/or experienced construction Trades Craftsmen capable to lay out the work and perform construction in an orderly and timely manner. Trades craftsmen shall have knowledge of the most current building codes and regulations in their area of expertise.

3.4.4.3 Cost Estimating/Negotiating: Provide estimating/negotiating support capable of producing accurate quantity take-offs and cost estimates for multi-discipline construction projects within the time constraints specified.

3.5 Contractor Employee Requirements: The contractor shall ensure that employees and subcontractor employees have current, valid licenses and certifications necessary to perform their functions. Any cost or time associated with obtaining licenses or certifications shall be at the contractor’s expense.

3.6 The contractor shall not employ any person who is or was an employee of the US Government, if the employment of that person would create a conflict of interest.

3.7 Throughout the life of this contract, whenever there are active DOs, the CM shall be available to meet with the CO at Building 165 promptly after notification by telephone during normal business hours. The CM shall be available to meet with the CO at Building 165 within 3 working days when there are no active DOs unless otherwise directed by the Contracting Officer. The CO must be able to contact the CM by phone at all times. The CM shall provide overall contract management, including full authority to develop DO proposals, negotiate and sign DOs, provide subcontract purchasing and administration, review material submittals and shop drawings, and shall attend all status meetings, site visits and pre-final/final inspections.

3.8 Required experience levels shall be maintained throughout the duration of the contract. When personnel changes are required, resumes and a revised organization chart shall be submitted to the CO for approval within five (5) business days.

3.9 The Contracting Officer may require that any employee of the contractor/subcontractor, whose conduct, in the opinion of the Contracting Officer, interferes with proper discipline at the installation where the services are performed, be removed from the installation.

3.10 The Contractor is responsible for obtaining all permits necessary for construction. The Contractor is also responsible for insuring all Uniform Codes, Standards, and environmental regulations are adhered to. Any Code, Standard, or regulatory deficiencies will be corrected at the expense of the Contractor. The most common permit is the routing of the Base Civil Engineer Work Clearance Request, AF Form 103, which includes coordination with various Federal, and Air Force POC’s.

4.0 TECHNICAL DESIGN SUPPORT: The Contractor’s design capabilities are of utmost importance. The Contractor’s staff shall have multidiscipline design experience. Areas of required technical design competence shall include, but are not limited to civil, architectural, structural, mechanical, electrical, and drafting/surveying crafts.

5.0 MANAGEMENT PLAN: Included in the Contractor’s response to the initial RFP must be a management plan detailed as follows:

5.1 Home Office Management and Support. Describe the home office organization, responsibilities and lines of authority established for the contract. Describe your plan for managing subcontract acquisition, execution, and administration. Describe your material purchasing system and capabilities. Describe resources available and your capabilities to support this contract concurrently with other ongoing or new work, including your capabilities to manage and execute several concurrent delivery orders. Include an organizational chart detailing the organization described in your proposal. Include names of assigned personnel and proposed subcontractors and their areas of responsibility for each portion. Clearly delineate on-site from off-site personnel. Quality Control and Safety should be included in the chart.

5.2 Support for Delivery Orders. Describe your capability and commitment to support an on-site management team, including a sole source of responsibility for both design and construction for any delivery order. Describe how they will manage, supervise, and coordinate the subcontractor’s work and who in the organization will be responsible for this management and coordination. Discuss which resources are available but will not be present at the site. Describe the role of the design team in response to a delivery order. Describe how warranty support, unforeseen site conditions, design errors, etc. for individual delivery orders will be handled by your organization.

6.0 DESIGN AND CONSTRUCTION REQUIREMENTS

6.1 All design and construction accomplished pursuant to this contract shall fully comply with the Government’s design requirements as well as all governing codes, Minot AFB Specifications and SABER Technical Specifications. Governing codes as follows, listed in order of priority:

(1) AF instruction, AF manuals, AF pamphlets, AF engineering technical letters, and executive orders

(2) Unified Facilities Criteria (UFC)

(3) Codes and Standards incorporated by reference in the UFC

(4) Applicable Executive Orders, DoD Regulations, International, Federal, State, and Local Codes and Regulations as cited in the DO SOW or referenced by the Contractor or his suppliers/subcontractors

6.2 In case of conflict among the above governing codes, contractor shall submit an RFI to the Government for resolution. Variances may also be requested via RFI.

6.3 SABER Documents: The following documents (listed in priority) shall be used in the overall execution of work under this contract:

(a) The DO Solicitation, Offer and Award

(b) Task order Statement of Work

(c) Most current version of Minot AFB Technical Specifications

Section 01000, General Requirements
Section 01570,Environmental Protection
Section 01051, Special Provisions for Working on or Near the Airfield on MinotAir Force Base
Section 01330, Submittal Procedures
Section 01450, Quality Control
Section 01500, Temporary Construction Facilities Controls

(d) SABER Technical Specifications, Divisions 02 through 16.

(e) SABER Contract Statement of Work

7.0 QUALITY CONTROL: It is the Contractor’s responsibility to provide, inspect, and document the level of quality that has been established by the minimum standards of this Statement of Work (SOW). The QCM shall direct the execution of the Contractor’s QC Plan.

7.1 A finalized version of the quality control plan submitted with the technical proposal shall be submitted to the Contracting Officer. Any changes to the plan shall be submitted to the Government. The QC plan shall include, but not limited to the following:

7.1.1 Inspection System: Details of the Contractors inspection system which monitors the execution of any task completed under this contract must specify the areas to be inspected on a scheduled or unscheduled basis, how often inspections will be accomplished, and titles of the individuals who will perform the inspections.

7.1.2 Deficiency Prevention: A method for identifying and preventing quality deficiencies and their causes.

7.1.3 Response Times: Routine warranty calls shall be no later than forty eight (48) hours after the initial notification by the Government and emergency calls shall be no later than two (2) hours after initial notification by the Government unless otherwise directed by the Contracting Officer. Punch list items on individual delivery orders shall be resolved within ten (10) working days of notification by the Government unless more timely completion is noted elsewhere in the contract requirements.

7.1.4 Inspection Files: The contractor shall maintain on site records of all the inspections conducted by the contractor and the necessary corrective actions taken. This documentation shall be made available to the Government throughout the performance period of this contract.

8.0 ON-SITE AVAILABILITY: The Contractor field Superintendent shall be on-site during construction work except approved by the CO. The Contractor’s Contract Manager shall be available for a phone contact at most any time during standard working hours and shall have the ability to response matters that arise to include the following functions: contract management, delivery order management, estimating, negotiating, scheduling, and construction quality control.

8.1 The Contractor will not be provided an on-base office space location for the Contractor’s administrative/management personnel in this contract.

8.2 A permanent on-base storage area will not be made available for Contractor owned material/equipment.

8.3 As required for each DO, the Contractor may be assigned an area located on or near each construction site to stage materials, store equipment and tools, and maintain miscellaneous items. If approved, the Contractor’s storage area shall conform to the SABER Technical Specification section 01500 and shall be utilized for the purpose of this contract only, or as authorized by the CO. All equipment/materials/supplies required to establish and maintain the staging area shall be at the Contractor’s expense. Portable buildings and structures may be used in these staging areas; however, the space shall not be used for occupancy. The assigned area must be properly fenced in accordance with Section 29.0.

9.0 PROTECTION OF CONTRACTOR’S EQUIPMENT AND GOVERNMENT PROPERTY

9.1 All Contractor supplies and equipment is the sole responsibility of the Contractor. The Government is not liable for the theft, vandalism, or damage of any Contractor supplies, equipment or property. The Contractor shall secure his materials and protect all equipment from damage.

9.2 Any equipment/material the Contractor removes and which requires reinstallation as part of the job requirements shall be the responsibility of the Contractor. All damaged material shall be replaced with equipment/material of equal quality and function by the Contractor at his own expense.

10.0 PROVISIONS ON CONTRACTING OFFICER’S AUTHORITY:

10.1 Only the CO is authorized to make changes to the contract or any DO issued there under. No other Government or non Government official may alter this contract or any DO issued in accordance with the basic contract terms and conditions.

10.2 In the event the Contractor effects any such changes at the direction of any person other than the CO, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof. The Contractor may also be required by the CO to undo any such unauthorized changes at no additional expense to the government.

10.3 Contract Administrator (CA): A Contract Administrator will be appointed for each DO. The CA maintains liaison with the prime contractor, CE staff.

10.4 Construction Inspector: A construction inspector will be assigned for each DO. The construction inspector is an employee of the Government. The inspector will perform daily quality assurance inspections on all projects to provide an accurate story of the details of project construction; report and make recommendations to the CA on the details of project construction; and document construction activities and any issues found in daily inspection reports using AF Form 1477, Construction Inspection Record, or an approved equal document per AFPAM 32-1005 Working in the Engineering Flight Paragraph, 2.6.2.1.

11.0 DELIVERY ORDER PRICING: Contractor delivery order pricing shall be accomplished as described below and based on the most economical standard construction practices. Value engineering and design review shall be used in project design and scope development. Unreasonable methods and or estimates to accomplish delivery order tasks will not be accepted.

11.1 Terms Explained

11.1.1 Line Item Costs: The cost of a line item shall be the item’s total bare cost based on a national average as defined by RS MEANS Price Book. The RS MEANS labor costs are included as line items of work.

11.1.2 Contract Unit Price Book (UPB): Contract line item unit prices are to be used as the basis on delivery order pricing. Estimates composed of the RS MEANS price book line items and the price book line items bare costs per unit, based on a national average are used. They are non-negotiable.

11.1.3 RS MEANS Price Book (MPB): Includes all items of work from a current year RS MEANS Facilities Cost Data Guide. The line items are priced primarily using contractor furnished RS MEANS electronic databases: The RS MEANS labor costs are included as line items of work. The Contractor shall provide to the Government three (3) copies of the RS Means Facilities Cost Data Guide within 30 days of award and each calendar year in January after the annual RS Means update.

11.1.4 The contractor shall provide the government with Win Est Pro Plus® estimating software or approved equal. The software lets you to instantly create custom list of materials, prices, labor rates, overheads and profits. Customer support by the software manufacturer shall be provided during the complete duration of the contract. The Contractor shall provide estimating software/licenses for three (3) Government users as well as all of its own Contractor users. The RS Means database shall be used in conjunction with Win Est Pro Plus®, latest version. The estimating package shall be Windows-based software. The database must include cost data on building construction, mechanical, electrical, concrete, site work, plumbing, interiors, heavy construction, assemblies, etc. Delivery and installation of the RS Means Facility Construction Cost (electronic and hardcopy) is due within 30 days of award and each calendar year in January after the annual RS Means update. No adjustment to the contract coefficients shall be allowed throughout the duration of the contract.

11.1.5 The contractor shall comply with any and all licensing requirements pertaining to any software purchased to meet the terms of this contract. Also, the contractor shall honor all copyright restrictions relevant to proprietary data obtained in electronic or hard copy format to meet the terms of this contract.

11.1.6 If the contractor provides estimating software other than Win Est Pro Plus®, the contractor shall provide on-site training by the software provider in a joint session for the government SABER office staff, the Contracting Officer along with the contractor’s office staff. The training shall be that which is recommended by the software provider for new users. An acceptable date or dates will be coordinated through the SABER Management, telephone no. to be provided after award.

11.1.7 Non Pre-priced Items (NPI): Items of work not included in the UPB required for execution of a DO and within the scope and general intent of the contract, these items must be submitted, approved and or negotiated if necessary.

11.1.7.1 Non-Means NPI item prices taken from local area sources shall be the lowest price offered from at least two (2) acceptable vendors. Equipment and material prices shall be based on the contractors cost. The contractor is required to show proof of its cost. Labor costs shall be derived using the RS MEANS productivity and crew cost rates.

11.1.7.2 In the event that a minimum of two (2) quotes cannot be obtained, a sole source justification may be submitted. Sole source is justified when there is only one supplier, potential suppliers/subcontractors are unresponsive or respond with no bid, etc. Contractor shall document sole source justification and submit to the Government as part of their proposal package.

11.1.7.3 The Contractor shall submit a worksheet for each NPI item which shows all of the costs and calculations used to develop the NPI item’s price.

11.1.7.4 The Contractor shall retain all materials used in performing take-offs (calculations, sketches, field measurements, etc.) and obtaining cost information (catalog cut sheets, vendor quotes, etc.) for the NPIs, and shall provide these materials in the proposal. Submission of these materials as part of the proposal shall satisfy the requirement for submittal of an item listed on the submittal register for a DO (see Section 18.2).

11.1.8 Local Area Adjustment Factor: The RS MEANS total weighted average city cost index for the city of Minot, ND, or the nearest city.

11.1.9 Coefficient: The coefficient is applied to UPB items and NPIs to determine the delivery order prices.

11.1.9.1 The prices as established by the UPB or the NPI are multiplied by the appropriate coefficient to arrive at the actual price for a unit of work.

11.1.9.2 Coefficient is defined as a numerical factor that compensates the Contractor for any and all costs (generally indirect costs) and profit not included in the UPB unit pricing. The coefficients shall include all costs not covered in the UPB line items, or not allowed, (such as Division 1 – General Requirements) in the RS MEANS. The Contractor’s coefficient shall account for all allocable and allowable contract costs, i.e., profit, gross receipt taxes, payroll taxes (FICA, Workmen’s Compensations, Federal and State unemployment), superintendents’ salaries, builders risk insurance, mobilization and de-mobilization expenses, bond premiums, all design costs will be part of the Contractors’ coefficient, sub-contractor costs, clean-up costs, various over-head expenses (office overhead, field office building, furniture, equipment, on-site office staff salaried, vehicle and construction equipment maintenance, office administrative expenses, proportional share of home office overhead), etc. There will be no allowance for any additional costs beyond the bare costs from RS Means and the coefficient; therefore, the coefficient must be all inclusive of costs incurred for each task order. The coefficient shall include costs for computer hardware, software, licenses, annual maintenance, RS Means Master file and all updates and licenses for Win Est Pro Plus® or approved equal.

11.1.9.3 Contingencies such as changes to labor wages and inflation shall be adjusted annually by the annual economic price adjustment to the UPB. Any change in the applicable minimum hourly rates of wages during the contract period shall not affect the unit prices to be paid by the Government for work performed under the contract.

11.1.9.4 The Contractor shall consider the following factors that affect the calculation of the Contractor’s coefficients:

(1) The UPB prices are for in place quantities. There shall be no allowances added for waste, compaction, storage, shipping, staging, handling, etc.

(2) The coefficient shall cover all the items typically designated as general conditions, profit and overhead including administrative/technical support and labor burden for the prime Contractor’s office staff and workforce.

(3) RS Means unit prices are based on projects ranging from $2,000 to $750,000. Any cost adjustment for deviation from this project range shall be included in the Contractor’s coefficient.

11.2 How To Calculate A Delivery Order Price

11.2.1 Total UPB Costs: The sum of all UPB line item costs.

11.2.2 Total NPI Costs: The sum of all NPI line item costs.

11.2.3 Government Furnished Material and Equipment: The Government may provide materials and/or equipment for installation. When furnished, the respective RS MEANS material/equipment shall be deleted from the RS MEANS line item cost, and the remaining line item cost shall be treated as UPB line item. If an item does not exist in the UPB, the cost for that line item shall be calculated exactly as an NPI item.

11.2.4 UPB Delivery Order Cost: The sum of the total UPB multiplied by the local coefficient and the appropriate contractor coefficient.

11.2.5 NPI Delivery Order Cost: The sum of the total NPI multiplied by the contractor NPI coefficient.

11.2.6 Total Delivery Order Cost: The sum of UPB Delivery Order Cost and NPI Delivery Order Cost.

11.2.7 NPI Percentage: The NPI delivery order cost divided by the total delivery order cost. Government reserves the right to reject a proposal where the NPI percentage exceeds 10%.

11.3 Keeping Prices Current

11.3.1 Unit Price Book (UPB): RSMeans® Facilities Construction Cost Data unit prices are updated and published at the beginning of each calendar year. Only the yearly update and published book shall be utilized until the next update/publication date; Contractor shall not utilize any updates that RSMeans may make during the year after the publish date. The CO will inform the Contractor of the official date to begin utilization of the updated publication.

11.3.2 Pre-Price Book (PPB): The PPB shall be updated to current year pricing after adoption of the new UPB.

12.0 COMPUTER REQUIREMENTS

12.1 The contractor’s software shall be compatible with Microsoft® Windows 7 Enterprise or current version as updated by Minot Air Force Base, ND, current version of Microsoft Office Professional, current version of AutoCAD available for Windows, current version of Adobe Acrobat Professional, etc.

12.2 The government does not require the contractor to purchase, install, or maintain computer hardware for government personnel. The government has the computer hardware necessary for operating the SABER task order estimating/proposal programs, and the SABER record keeping programs.

12.3 All drawings submitted by the Contractor shall be created from Computer-Aided Design and Drafting (CADD) software. The drawing files shall be electronic CADD files in AutoCAD (.dwg) format and adhere to the drawing standards contained in Tri-Services A/E/C CADD Standard 3.0.

12.3.1 The Contractor shall submit all CADD drawings on a compact disk (CD).

12.3.2 All drawing work to be provided under this contract shall be accomplished and developed using computer-aided design and drafting (CADD) software and procedures conforming to the following standards:

Title Sheet

Existing Site & Demolition PlansStructural Plans & Details
Final Site PlansPre-Engineered Structures & VariousDetails
Grading Plans & DetailsFire Protection and Emergency EgressPlans
Landscape Plans & DetailsPlumbing Floor Plans, Section, EquipmentSchedules and Details
Underground Utility Plan & ProfilesPlumbing Riser Diagrams
Foundation Plan & DetailsMechanical Floor Plans, Sections,Equipment Schedules & Details
Floor Plans & DetailsMechanical Riser Diagrams
Reflected Ceiling Plans & DetailsMechanical Equipment Diagrams
Roofing Plans & DetailsElectrical Site Plans & Details
Elevations (Interior& Exterior)Electrical One-Line Diagrams
Wall, Roof Sections, & DetailsElectrical Power Plans & Panel Schedules
Finish Schedules (Interior & Exterior)Electrical Lighting Plans & Schedules
Window & Door Schedules & DetailsElectrical Communications Plans
Furnishings PlansFire Alarm System Plans & Risers
Signage Plans & SchedulesSecurity Systems Plans

12.3.3 The Unified Facilities Criteria (UFC) contains the requirements for developing design drawings and submitting as-built drawings.

12.3.4 The contractor shall submit As-Built drawings, in the form of CADD files, to the Government, for review and approval, for each individual delivery order prior to submitting a 100% invoice for the project.

13.0 COMMUNICATION: The Contractor shall ensure that the CM, designated alternate CMs and the project superintendents can be contacted at any time by telephone throughout the period of this contract.

14.0 CONSTRUCTION START-UP PERIOD: In accordance with (IAW) Section F, delivery of Performance, Contractor Mobilization, sub-section-Construction start up period. The Contractor shall have all equipment and personnel in place to fully execute the requirements of this contract. Also, the Contractor will be required to meet with the 5CES/CEPM concerning CADD requirements and drafting standards during said start-up period.

15.0 PRE-PERFORMANCE CONFERENCES: Prior to issuance of a Notice-to-Proceed (NTP) for any DO, the CO may elect to host a Pre-Performance Conference. The Contractor and subcontractors shall be represented at the scheduled conference and be prepared to discuss potential difficulties and obstacles.

16.0 ORDERING PROCEDURES

16.1 Site Visit

16.1.1 The CO will notify the Contractor of an existing requirement by providing the CM an RFP that shall include a written SOW, a submittal register and initial sketches or drawings when applicable. The site visit will be scheduled with the CO as per the meeting date established in the RFP. The CM and subcontractors shall attend the site visit and obtain whatever measurements and information is necessary to develop the design and produce a complete and accurate DO proposal, to be submitted to the CO within 10 working days from the date of the site visit. Due to mission requirements, it may be necessary to require the Contractor’s DO proposal in less than 10 working days. For more complex projects, additional time may be granted by the CO. The scope validation/site visit discussions will include:

(4) Necessary refinements for Contractor-furnished scope requirements

(5) Methods and alternatives for accomplishing work

(6) Requirements for plans, sketches, drawings, etc.

(7) Access to the facility/project site, work hours, etc.

(8) User impacts

(9) Phasing or work sequence

(10) Security requirements

(11) Utility outage

(12) Airfield Waivers, Permits, Excavation

(13) Temporary protection of government property

(14) Debris and trash disposal

(15) Fire protection and alarm scope

(16) Noise and dust control

(17) Environmental Impacts/Asbestos, Lead, PCB, SWPPP

(18) Special Requirements specific to project such as applicable codes and regulations

16.2 Contractor’s Proposal: The Contractor’s RFP response package including proposal submission shall comply with the government’s RFP solicitation package as well as ensure that all proposed work will comply with governing codes, regulations and the SABER Technical Specifications. The Contractor’s RFP response package shall be submitted electronically and include the following documents:

(1) Project Outline;

(2) RSMeans® proposal;

(3) NPI Quotations specified or as requested by the CO.

(4) Contractor’s minimum design package;

(a) Proposal estimate quantity calculations such as square foot, cubic yard, etc, unit of measure take-off calculations to justify quantities;

(b) Supplemental Drawings

(c) In-house design drawings and calculations as necessary

(5) Manufacturer’s supplied drawings, calculations, fabrication

(6) Catalog/product technical information;

16.2.1 The Contractor-furnished project Outline shall clearly demonstrate scope knowledge by providing the following information:

(1) Project Synopsis (description);

(2) The proposed method of accomplishing the work;

(3) Proposed construction drawings;

(4) Type of site field verification performed;

(5) User impacts;

(6) Protection of government property during construction;

(7) Estimated construction time.

16.2.2 Supplemental Drawings: One (1) set of blueline/bond paper drawings that clearly locate, define, and quantify each item in the Contractor’s detailed cost proposal. The Contractor’s drawings shall clearly indicate compliance with the requirements of the Government’s concept design and building codes. The Contractor shall provide civil, structural, architectural, mechanical, and electrical drawings in enough detail to allow the Government to evaluate the Contractor’s detailed cost proposal for completeness and accuracy. For example, as a minimum the electrical drawings shall indicate outlet locations, wire sizes, panel locations and load requirements, transformer sizes and locations, and actual routing of circuits. Examples of required drawings include site plans to show utilities, landscaping and topographical elevations; foundation plans and details; floor plans, elevation drawings, reflected ceiling plans, roof plans, typical details, structural framing plans, door/window/hardware/equipment/ finish schedules, etc. All drawings shall bear a standard Government furnished title block indicating the sheet number, project name, project number, designer’s signature, CM signature, Contractor’s letterhead, (3) blanks for revision dates, and signature/date approval block for the PM.

16.2.3 Detailed DO Cost Proposal: Electronic copy of the Contractor’s complete detailed line-item DO cost proposal shall be submitted for each proposal. The electronic cost proposal can be submitted via Email in PDF file and WinEst Format or approved equal. The Contractor’s DO cost proposal shall consist of an itemized listing of line items from the UPB and any NPIs with written quotes as required.

16.2.4 Timeline: Each DO proposal shall include a brief critical path timeline, taking into account the major work elements from the detailed cost proposal, as well as submittal reviews, mobilization, material delivery times, anticipated weather delays and Final Inspection. The timeline shall be divided into three phases: Submittals, Construction and Closeout. The period of performance for each delivery order begins with issuance of the notice to proceed and end with acceptance and approval of the final progress report.

16.2.5 Cover sheet including the SOW and scope: Each DO proposal shall include a cover sheet defining the project contact information, performance period, general conditions and a thorough description of the demolition and construction scope.

16.3 Negotiation

16.3.1 The CO will notify the CM and schedule negotiations. The CM shall be available to negotiate within 2 working days of notification unless otherwise directed by the Contracting Officer.

16.3.2 The CO will negotiate, on a line item by line item basis, a firm fixed price for the DO. Unit prices will not be discussed, except for NPIs. The negotiations will establish the appropriate line items for the DO, and quantities for each line item. The Contractor must be prepared to provide quantity calculations justifying the material quantities contained in the proposal.

16.3.3 At the conclusion of line item cost negotiations, the CO will negotiate a reasonable and expeditious performance period based upon input from the CA and PM, the Contractor’s proposed critical path timeline, and RS Means daily output data. Provisions for assessing liquidated damages (LD) will be determined on each individual DO by the CO.

16.4 Estimation of Projects in Advance Of Funding

16.4.1 During the course of the contract, the contractor may be required to estimate and negotiate projects in advance of funding. These projects may not have funding available, and there is no guarantee that funds will become available for award of the project. No separate compensation for any Pre Order costs including proposal preparation and attendance during negotiations or site visits will be due to the contractor for projects that are negotiated and funding is not provided.

16.4.2 Fiscal Year end Procedures: The contractor may be given a list of projects that the base reasonably expects funding for. The list may be revised for both additions and deletions based on the Governments’ requirements. These projects will be estimated and negotiations completed. The Government shall incur no obligation until such time as funding becomes available and a task order is executed for the project. The negotiated total quantities shall remain binding until funding becomes available. Projects that are funded and awarded after the exercise of an option will be re-priced (not renegotiated) utilizing the current UPB. Agreed upon total prices that contain non-priced items shall be verified with the contractor prior to execution of the task order. In the event the non priced items have undergone a substantial change in the market (i.e., 10% difference), the items shall be re-negotiated and agreement reached prior to executing a task order.

17.0 DELIVERY ORDER PROPOSAL EVALUATION: The government will review the Contractor’s RFP response package for technical feasibility and compliance with the government’s intent. As part of the review, the Contractor’s RSMeans® based proposal will be reviewed for technical feasibility and to ensure that the appropriate selection of UPG line items is used to best define the Contractor’s minimum design. Negotiations shall not commence until the Contracting Officer determines that sufficient data has been provided by the contractor to clearly and concisely depict a technically sound project design and project proposal.

18.0 COMMENCEMENT, EXECUTION, COMPLETION AND PAYMENT FOR WORK

18.1 Notice to Proceed (NTP): Within ten (10) days of issue of the project Notice to Proceed (NTP), and before work begins at the construction site. The Contractor shall submit electronic copies of the negotiated proposal drawings, marked CONSTRUCTION SET. This set of Construction Drawings shall be submitted for Government approval as defined in the project SOW. Construction will not be allowed to commence until the Construction Drawings are submitted and approved by the Government.

18.2 Submittals: The RFP sent to the Contractor will include a submittal register (AF Form 66) which specifies required submittals for each project. However, the Contractor shall supply, upon request of the Government, any submittals that are required in the specifications that may have been inadvertently omitted from the submittal register. If the Contractor finds that additional items should be added to or finds grounds for deletion of some items, the Contractor may request revisions to the submittal register via RFI.

18.2.1 AF Form 3000, Material Approval Submittal. The Contractor shall, within 10 calendar days after issue of the NTP, or as otherwise specified on the AF Form 66, or as otherwise directed by the CO, submit for approval to the CO all proposed materials and documents IAW FAR 52.236-3 Materials and Workmanship Clause using the AF Form 3000. The Contractor proceeds at their own risk installing any products prior to approval by the CO on an AF Form 3000 and shall be solely responsible for all replacement cost at no additional cost to the Government. The Contractor shall significantly identify on the AF Form 3000, and all associated printed documentation, all material substitutions that deviate from the requirements of the project request documents, negotiation results, and/or this specification. Failure to identify these material substitutions on the AF Form 3000 at time of submission shall not relieve the Contractor from all replacement costs at no additional cost to the Government, even in the event when an AF Form 3000 is inadvertently approved without the Contractor complying with the aforementioned identification requirements.

18.2.2 Material Samples. The Contractor is responsible for identifying and locating required materials for submittals to include matching any existing materials. The Contractor shall provide all color selection samples, regardless of product type, as a group to facilitate design compatibility selection, and partial submittals of these related items will be returned without action and shall be the sole responsibility of the contractor for any delays due to this failure to comply. As a minimum, all wall covering, carpet and other pattern type submittals shall show the full representation of material pattern. All samples provided for approval shall become property of the Government. The Contractor may request return of samples for inclusion on color boards or as submittal library entries, without guarantee of approval. All labor, equipment, materials, and rentals/fees required to provide material samples, shall be at no additional cost to the Government and is considered field overhead, a part of the Contractor’s coefficient.

18.2.3 AF Form 3064, Contract Progress Schedule. The Contractor shall submit to the CO for approval within 10 calendar days after the NTP for all DOs with a performance period greater than 60 calendar days, unless otherwise specified by the CO, IAW FAR 52.236-15 Schedules for Construction Contracts. The associated AF Form 3065, Contract Progress Report (see paragraph 18.2.5) is based upon the AF Form 3064.

18.2.4 Acceptable Format. The Contractor shall develop each AF Form 3064 to reflect particulars for each DO and the…