Atch 3 - Bid Schedule FY25 Striping Rubber Removal.xlsx

XLSX spreadsheet 58 KB Posted

Attached to
FY25 Airfield Striping & Rubber Removal | Dover AFB, DE
Solicitation number
FA449725R0007
Issued by

About this file

This is a pricing bid schedule template in Excel format for a FY25 Airfield Striping and Rubber Removal project at Dover Air Force Base, DE (Project No. FJXT 210073). The template includes division sheets for contractors to input costs, with specific focus on Division 1 (General Requirements) and Division 32 (Exterior Improvements).

The bid schedule template requires contractors to provide pricing for 475 hours of Restricted Area Badge Holder/Escort services, paint removal for 10,000 SF, reflective pavement markings (Type I) for 225,000 SF, non-reflective pavement markings for 65,000 SF, and rubber removal for 1,064,000 SF. The template includes sections for labor, materials, and equipment costs, with automated calculations for overhead, profit, risk/bonding, and design costs. Contractors must complete areas marked "Fill Here" in the summary tab, and the template allows for adjustments to overhead and profit percentages for both prime and subcontractors.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.

Exceptions:

(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.

(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.

The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.

Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.

* CSI = Construction Specifications Institute

&"Verdana,Bold"Construction Cost Estimate

&P of &N

Summary

BID SCHEDULE
6-Aug-24
COMPANY
436th Civil Engineering
PROJECT
FY25 Airfield Striping & Rubber Removal
LOCATIONPROJECT NO.FJXT 210073
DOVER AIR FORCE BASE, DE
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 1General RequirementsERROR:#DIV/0!$0.00
DIVISION 32Exterior ImprovementsERROR:#DIV/0!$0.00
FILL IN AS REQUIRED (this will link to the entire document)

davisjam: davisjam:

Percentages listed are place fillers. Please complete as required

GC Overhead
GC Profit
Risk/Bonding
Design
This spreadsheet contains many formulas... please save a copy prior to editing in case you make a mistake. All shaded areas are either linked or contain formulas
2
2

Select Area Cost Factor Type:

DIVISION 36RESERVED
DIVISION 37RESERVED
DIVISION 38RESERVED
DIVISION 39RESERVED
DIVISION 46RESERVED
DIVISION 47RESERVED

DIVISION 49 RESERVED ERROR:#REF! ERROR:#REF!

HARD COST TOTAL ERROR:#DIV/0! $0.00

PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)0%$0.00
SUBTOTAL$0.00
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)0%$0.00
SUBTOTAL$0.00
$0.00
SUBTOTAL$0.00
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)0.0%$0.00
CONTRACT TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Sustainment Repair/Const ACF Already Factored

Div1

BID SCHEDULE DATE

PROJECTBASIS FOR ESTIMATE
FY25 Airfield Striping & Rubber RemovalCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210073
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABOREQUIPMENT
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
Restricted Area Badge Holder/Escort475HR- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
- 0
- 0
- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div32

BID SCHEDULE DATE

PROJECTBASIS FOR ESTIMATE
FY25 Airfield Striping & Rubber RemovalCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
DOVER AIR FORCE BASE, DECODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
436th Civil EngineeringFJXT 210073
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXTERIOR IMPROVEMENTS
Paint Removal10,000SF$0.00$0.00
Pavement Markings, Reflective (Type I)225,000SF$0.00$0.00
Pavement Markings, Reflective(Type III)SF$0.00$0.00
Pavement Markings, Non-Reflective65,000SF$0.00$0.00$0.00
Rubber Removal1,064,000SF$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
(02580/1.4 & 1.5)$0.00$0.00$0.00
$0.00
$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
ERROR:#REF!ERROR:#REF!ERROR:#REF!
$0.00
(02680/1.3.1 & 1.4.1)ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
$0.00$0.00$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
TOTAL LABOR/MATERIALS$0.00$0.00$0.00
SUBTOTAL$0.00
$0.00
$0.00
$0.00
TOTAL$0.00

&"Verdana,Bold"Construction Cost Estimate

File details come from the government source that posted it. Updated .