This Statement of Work from the 436th Civil Engineer Squadron at Dover AFB outlines requirements for airfield striping and rubber removal services to be performed in Spring and Fall 2025. The contractor must provide all labor, materials, and equipment to repaint up to 290,000 SF of striping (225,000 SF reflective, 65,000 SF non-reflective) and remove rubber from three runway areas totaling approximately 7,600 LF x 70 LF (Runway 32: 2800 LF, Runway 01: 2600 LF, Runway 19: 2200 LF).

Key requirements include: removing 85% of rubber buildup without damaging pavement surfaces, performing friction tests before and after rubber removal, using either Type I or Type III reflective beads, and maintaining strict airfield security protocols. Work must be coordinated with base operations one week in advance and performed between 7:30 AM - 4:30 PM. The contractor must provide an airfield-trained badge holder for escort duties and perform the work in two separate mobilizations of up to 2 weeks each. Additional striping locations include taxiways, aprons, and various base roads/streets based on a government-provided priority list. The site map shows the Dover AFB airfield layout with runways, taxiways and surrounding facilities.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

AIRFIELD

AIRFIELD STRIPING & RUBBER REMOVAL 2025

REVISION 1

Project FJXT210073/FJXT210024

27 Feb 2025

DESCRIPTION

The project consists of providing all labor, materials, equipment, tools, appliances, and materials necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications.

1. Repaint existing and paint new pavement markings in accordance with the statement of work and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-

Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided prior to the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 10,000 SF.

The contractor may propose to use either Type I or Type III beads in the reflective markings.

2. Prior to initiation of rubber removal, the contractor shall conduct friction tests on the runway surfaces to be cleaned. The contractor shall also conduct friction tests after rubber removal is complete. Friction tests shall be conducted in accordance with

TSPWG 3-270-01.04-10 to enable before and after comparison. The results of the friction tests shall be presented to the Government inspector to verify adequate cleaning.

3. Adequate cleaning shall consist of removal of 85% of the rubber build up of the rubber covered within a designated area of runway:

Runway 32 (2800 LF x 70 LF)

Runway 01 (2600 LF x 70 LF)

Runway 19 (2200 LF x 70 LF)

The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property. The determination of the

85% removal shall be accomplished by the test described in Paragraph 1.

4. Markings to be removed shall be obliterated to 95% removal. A small amount of paint remaining is not only acceptable but, desirable to ensure pavement is not damaged by the removal process.

5. Provide layout for all new pavement markings.

6. Repaint all existing lines to the same width (typically 6” wide). The center of the new line shall match the center of the existing line.

7. All repainted taxi lines on concrete pavement surfaces including the North Ramp, concrete pavement of Runway 01/19 and concrete portions of Runway 14/32, concrete portions of

Taxiways “A”, “B”, “C” , “D”, “E”, “F”, “G” AND “H” shall consist of a 6” wide reflective yellow line and a 6” black border on each side.

8. Instrument and hold position markings have preference over other taxiway markings.

Interrupt the taxiway stripe 3 feet from other side of these markings.

9. Where a taxiway crosses a runway, interrupt the taxiway stripe at all runway markings 3 feet from other side of runway markings. Where taxiway centerline markings meet threshold markings or numbers, interrupt the taxiway stripe 5 feet short of the higher priority marking.

10. Where taxiways cross, interrupt the taxiway stripes.

11. Where a taxiway radius extends onto the runway, extend the taxilane radius line an additional distance of 200 feet beyond the point of tangency of the radius and parallel with the runway centerline. Maintain a separation distance of 3 feet from the near side of the runway centerline marking.

12. All taxiways (except Taxiway D, which is 150’ wide in spots) are 75’ wide across the taxiway and include 25’ shoulder widths on each side. Total width equals 125 FEET. All taxiway lead-in lines to hold lines are to be enhanced IAW FAA requirements.

13. All airfield markings are in the contract in accordance with provided priority list. The contractor shall keep a running total of SF of striping based on the priority list. Striping shall be considered complete when the limits in Paragraph 1 are reached.

14. The following road and street markings are also in the contract and shall be striped as long as there is SF available within the striping SF allotment. A prioritized list will be provided by the Government after contract award.

Hangar Aprons 1-4 Outdoor Wash Rack

Perimeter Road (From BLG 945 to Commercial Gate exit lane)

Purple Heart (Up to Commercial Exit Gate)

Atlantic Street (Inside and outside North Gate)

Main Gate Way (Inside and outside Main Gate)

Chevron Street

Evreux Street

Arnold Street

Chad Street

Eagle Way

Airlift Street

Galaxy Street

Tuskegee Street

Orly Street

Ramp Road

15. Minor road and street markings (crosswalks and stop bars) are not to be painted /not in contract (NIC).

16. Shoulders wider than 25 feet and shoulders where there is no clear distinction between the structural pavement and the shoulder shall be marked with deceptive shoulder markings.

17. VFR hold lines and taxiway centerlines adjacent to them shall be repainted as they exist with enhanced VFR and lead-in lines in accordance with FAA Circular 150/53401J, 6/6/2008.

18. Glass beads shall be provided and used by the contractor for any application calling for reflective paint. Contractor may propose either Type1 or Type 3 beads.

19. The contractor shall have the ability to perform heavy-duty striping and paint removal.

Due to the nature of the work on an operational runway, the contractor will be asked to perform quickly and expertly. This will require large self-propelled vehicles designed for rapid professional airfield striping. Previous airfield striping work is required to ensure the contractor will be able to perform within the short periods of performance.

20. All work shall be accomplished between the hours of 7:30 a.m. and 4:30 p.m. The contractor needs to provide two weeks notification of road or parking lot closures prior to commencing work to provide occupants time to adjust parking locations during repair work. Contractor shall provide construction schedule showing phasing of work. All airfield work shall be coordinated with base operations at least one week in advance and approved by airfield management for start prior to commencement.

21. The contractor shall perform work to remove paint and rubber and striping as defined in this statement of work and plans in two phases two (2) times, once in the spring of 2025 and once in the fall of 2025. Exact dates for the work will be set by

Dover AFB airfield management based on availability of the airfield and the condition of rubber buildup on the runways. Typically, this work is performed in April and November of each year.

22. The contractor shall provide an airfield-trained and properly permitted Dover AFB, Delaware restricted area badge holder to perform all escort duties required to all perform airfield/restricted area.

(Note: If a qualified restricted area badge holder escort is not provided, no payment will be made by the Government for qualified escorts not provided)

23. The contractor shall have the ability to perform heavy-duty striping, paint and rubber removal. Due to the nature of the work on an operational airfield, the contractor will be asked to perform quickly and expertly. This will require large, self-propelled vehicles designed for rapid, professional airfield operations. Previous airfield striping and rubber removal experience is required to ensure the contractor will be able to perform within the short period of time required by this contract.

24. The contractor shall be responsible for all field measurements to accomplish work.

Quantity and sizes of materials shall be determined from drawings and verified as the work is being performed. The contractor shall carefully examine the entire site and shall make all necessary investigations to become thoroughly aware of the existing conditions and all difficulties involved in the completion of the work in accordance with the contract documents.

25. The priority of striping is not constant. It depends on the need at the time of striping. In general, the priorities are as follows:

a. Any new work requiring layout

b. Runways

c. Taxiways

d. Aprons

e. Restricted area aprons

f. Other (i.e. Perimeter Road, Ramp Road)

26. Normally, very little to no work is required prior to restriping. The areas must be generally clean and dust free. However, no special cleaning is required.

LIMITATIONS

The Contractor must work with Security Forces, Civil Engineering Program

Management and Airfield Operations to coordinate work at this site. The contractor should assume the airfield will remain active during the striping process. Contact with Ground Control will be necessary for most of the work. Please contact 436

CES Security Officer for the latest security requirements. Since this process is time consuming, the contractor is advised to start as soon as possible to ensure escorts are properly badged prior to airfield striping.

Tonya D. McCoy, Civ, Commercial: 302-

677-4726 436 CES Security Manager

PERFORMANCE

365 Days for total period of performance

(Actual work shall be performed in the Spring and Fall of 2025 and be accomplished in 2 separate mobilizations of up to 2 weeks each)

PART II – GENERIC REQUIREMENTS

GOVERNING DESIGN AND CONSTRUCTION DOCUMENTS

A. Department of Defense specifications and criteria located at http://wbdg.org/ffc/dod.

B. Air Force specifications and criteria located at http://wbdg.org/ffc/af-afcec.

C. Dover Air Force Base Installation Facilities Standards (IFS) is located at http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/dover-afb-ifs.

D. Delaware Department of Transportation (DelDOT) Standard Specifications

E. Specifications For Airfield And Heavy-Duty Pavements

1. TABLE OF SUBMITTALS

Instructions: Identified submittals are mandatory.

TABLE OF SUBMITTALS

Description (cut sheets) and capabilities of all striping and rubber removal equipment.

1 Within 15 calendar days after Notice to

Proceed

Cut sheet and MSDS safety of material data of line striping paint

Within 15 calendar days after Notice to

Proceed http://wbdg.org/ffc/dod http://wbdg.org/ffc/af-afcec http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/dover-afb-ifs

2. DESIGN REQUIREMENTS (N/A)

3. CONSTRUCTION REQUIREMENTS

A. In accordance with (IAW) United Facilities Guide Specifications (UFGS) 01 33 00

Submittal Procedures shall govern construction submittals.

B. PERMITS – The Contractor is responsible for all applicable permits, licenses, and certificates required to perform and execute this contract.

C. CONSTRUCTION PROGRESS MEETINGS -Not Required

4. SECURITY

4.1 SECURITY INSTRUCTIONS

a. All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the Installation shall abide by all security instructions and directives of Dover Air Force Base.

b. At the close of each work period, government facilities, equipment and materials shall be secured, lights, heat and water turned off and all doors and window secured.

c. The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general wellbeing or operational mission of the Installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal

Background Check (CBI).

d. Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented workers will be remanded to the proper authorities.

e. All contractors and subcontractors when working in a Controlled, Restricted, or other sensitive area must be escorted at all times. The military agency or unit responsible for the project is responsible for providing the escorts. The Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.

4.2 CONTRACTOR BADGE POLICIES: All requests for Contractor badges will be document will be returned for correct formatting. Do not paste the Access Control List in the body of the email. When requesting access for sub-contractors the following information is needed: full name, Social Security Number, driver’s license number and state of issue, vehicle information (make/model/color/year), license tag number and state, name of company, date and time required for access.

Contractor badges will be issued for a maximum period of one year. Prior to re-issuing a badge, all old badges must be returned to the 436 SFS, Pass and Registration office for destruction. Prior to re-issuing a badge, the “Sponsor” must submit a new ORM to the 436

SFS, Pass and Registration office for approval. In the event a badge is lost or stolen, the badge holder must immediately contact the 436 SFS, Pass and Registration office. The badge holder must complete the Loss/Theft of Identification Worksheet and provide to the

Contractor’s Site Supervisor. The Contractor’s Site Supervisor will investigate the loss and report (in writing) the circumstances in which the badge was lost. This information, along with a new ORM, will be submitted by the “Sponsor” to the 436 SFS, Pass and Registration office for re-issuing a badge.

When a Contract employee is terminated, the Contractor’s Site Supervisor, COR or RO will immediately notify 436 CONS, who will ensure notification is made to the 436 SFS, Pass and Registration office. The Contractor’s Site Supervisor, COR, or RO are responsible for returning the contractor’s badge to the 436 SFS, Pass and Registration office. If a terminated employee refuses to surrender the access badge, COR or RO will immediately notify, in the order of precedence: (1) 436 SFS, Base Defense Operation

Controller; (2) the 436 SFS, Pass and Registration office; and (3) 436 CONS of the situation. If a base access badge is denied the 436 SFS, Pass and Registration office will notify the “Sponsor” of the denial. The individual in question may contact the 436 SFS, Pass and Registration office for information on how to obtain the reason(s) for denial.

4.3 INSTALLATION ACCESS: The contractor shall obtain a personal contractor identification badge for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto Dover AFB from 436 SFS, Pass and Registration, for the duration of the contract. Employees are only permitted to enter the Installation during the date and time periods indicated on their contractor badge.

Vehicle registration, proof of insurance, and a valid driver’s license must be presented for all vehicles while operating on the Installation. All vehicles entering the DAFB Main

Base, Military Family Housing or sensitive areas are subject to search. Any refusal or non-consent by an employee will result in termination of their base access and immediate confiscation of this access badge.

During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges must be sponsored onto the installation. During FPCON Bravo, Charlie, and Delta personnel without base issued identification shall be physically escorted onto the installation.

4.4 ANTITERORISM:

References:

Department of Defense Instruction O-2000.16, Volume 1 DoD Antiterrorism (AT)

Standards, Standard 18

Defense Federal Acquisition Regulation Supplement (DFARS) (Reference (r)) reflects current DoD AT security requirements for defense contractors.

Joint Publication 3-07.2 Antiterrorism

Terrorism is defined as: The calculated use of unlawful violence or threat of unlawful violence to inculcate fear; intended to coerce or to intimidate governments or societies in the pursuit of goals that are generally political, religious, or ideological.

Antiterrorism: As a prelude and during performance of any contract, it is critical that the Contractor be supportive of all Department of Defense (DoD) requirements to protect personnel and their families, installations, facilities, information, and other resources from terrorist acts.

Antiterrorism Awareness Guides: All personnel employed by the contractor, to include subcontractors, shall review the attached DAFB AT Awareness Guide for Contractors

(Apr 24) and DAFB AT Awareness for Contractors Trifold Apr 24.

Contractors or subcontractors possessing a Common Access Card (CAC) will complete

AT Awareness Level I training IAW AFI 31-145, Antiterrorism, Standard 25, by completing the―Force Protection computer based training (CBT) course through the

MyLearning site. This training site is available through the AF Portal at https://lms-jets.cce.af.mil/moodle/. This site automatically records members completion of training and enables the user to print a certificate if needed by the Unit or Base Training Manager.

Contractors or subcontractors without a CAC or who do not have access to a government

Non-classified Internet Protocol Router Network (NIPRNET) computer performing construction/services on the installation will complete AT Awareness Level I training

IAW AFI 31-245, Antiterrorism, Standard 25, by completing the― Force Protection computer based training (CBT) course through the Joint Knowledge Online (JKO)

Learning Management System (LMS) at http://jko.jten.mil/courses/atl1/launch.html

4.5 FORCE PROTECTION CONDITIONS (FPCON) IMPACT ON WORK LEVELS

If the DAFB FPCON is elevated to Charlie, the installation shall evaluate the need for contract services to be discontinued. At FPCON Delta, services are discontinued. Services shall resume when the FPCON level has been lowered.

Note: In the event of an emergency, dial 911 from any land line on the installation. The call will be routed to the ECC (302-677-6666). If a cell phone is used to dial 911, it will be routed to the county 911 dispatch. Inform the dispatcher the emergency is on DAFB and they will route the call to the DAFB ECC.

http://jko.jten.mil/courses/atl1/launch.html

5.0 CONTRACT ADMINISTRATION REQUIREMENTS

NOTIFICATION REQUIREMENT – The Contractor is required to notify the

Contracting Officer and the Project Manager of critical issues that may affect life, health, safety, contract performance, or the environment. Verbal notification should be made immediately followed by written notification as soon as practical.

TRANSMITTAL FORM – The Contractor is required to use AF Form 3000

Material Approval Submittal as the transmittal form for both design and construction submittals.

SUBMITTAL FORMAT – Provide submittals in electronic format, with the exception of material samples required for Submittal Description (SD)-04 Samples items. In addition to the electronic submittal, provide one hard copy of design submittals. Compile the submittal file as a single, complete document, to include the Transmittal Form described within. Name the electronic submittal file specifically according to its contents, coordinate the file naming convention with the Contracting Officer. Electronic files must be of sufficient quality that all information is legible. Use Portable Document

Format (PDF) as the electronic format, unless otherwise specified or directed by the

Contracting Officer. Generate PDF files from original documents with bookmarks so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Index and bookmark files exceeding 30 pages to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature. Email electronic submittal documents fewer than 10MB to an email address as directed by the Contracting Officer. Provide electronic documents over 10MB on an optical disc, or through an electronic file sharing system such as the AMRDEC SAFE

Web Application located at the following website: https://safe.amrdec.army.mil/safe/.

Provide hard copies of submittals when requested by the Contracting Officer. Up to three additional hard copies https://safe.amrdec.army.mil/safe/