Answers to questions prior to site visit.

View the file

Other files

File Type Posted
B793_Utilities_2.pptx PPTX presentation
B793_Site_Visit__2_Questions.pdf PDF
All_Site_Visit_1_Answers.pdf PDF
Bldg_793_Mezzanine_Floor_Plan.ppt PPT presentation
B793_Utilities.pptx PPTX presentation
Solicitation_Amendment_FA449719RA0060001_SF_30.pdf PDF
DAFB_Local_Design_Guide_w_Appendix_D_(9_April_2017).pdf PDF
FBO_posted_pre-site_visit_questions_2.docx DOCX document
31_25_10_DAFB_Sediment_and_Erosion_Control_(9_April_2018).pdf PDF
01_11_10_DAFB_General_Requirements_(9_April_2018).pdf PDF
02_61_10_DAFB_Environmental_Control_(9_April_2018).pdf PDF
DAFB_Architectural_Compatibility_Plan.pdf PDF
2_of_16_.pdf PDF
15_of_16_M793.3.pdf PDF
6_of_16.pdf PDF
9_of_16.pdf PDF
12_of_16.pdf PDF
5_of_16_M793.2.pdf PDF
7_of_16.pdf PDF
10_of_16.pdf PDF
16_of_16.pdf PDF
13_of_16_M793.1.pdf PDF
4_of_16_E793.1_(1).pdf PDF
3_of_16_E793.1_.pdf PDF
1_of_16_.pdf PDF
14_of_16.pdf PDF
8_of_16.pdf PDF
11_of_16.pdf PDF
Foundation.pdf PDF
Solicitation_-_FA449719RA006.pdf PDF
Wage_Determination_Bldg_1-4-19_DE190007.pdf PDF
SOW_-_B793_Rpr_Foundation_(19_Oct_18).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1. Are any forms needed to gain access to the site visit on Monday, 2/11/2019?

A1. Reference solicitation FA449719RA006, FAR 52.236-27 SITE VISIT (CONSTRUCTION) clause on page 21-22 of the solicitation. Bring a valid driver’s license and proof of insurance.

Q2. Please provide a Dover AFB Base Map with building numbers.

A2. A Dover AFB Map with building numbers will not be provided prior to site visit.

Q3. Can the proposal schedule be provided on 11x17 paper? Since there are only three pages allowed for this section, we recommend removing the actual schedule from the page count, thus allocating three pages for the work plan and performance statement.

A3. Reference solicitation FA449719RA006 section L, page 28 of the solicitation.

Q4. Are bidders allowed to take photographs at the walk-through?

A4. Yes, Contractors are authorized to take pictures during the site visit scheduled 11 February 2019 at 10am for solicitation FA449719RA006.

Q5. Will CAD files be available to support the design phase?

A5. Reference solicitation FA449719RA006 SOW para 3. Government furnished information. Available drawings are attached.

Q6. Please provide as-built drawings for BLDG’s 792 & 793 and as-builts for all underground utilities in the areas around the subject BLDG.

A6. Reference solicitation FA449719RA006 SOW para 3. Government furnished information. Available drawings are attached.

Q7. Do bidders need to register for the walk-through in advance?

A7. Registering for the site visit is not required in advance. Reference solicitation FA449719RA006, FAR 52.236-27 SITE VISIT (CONSTRUCTION) clause on page 21-22 of the solicitation.

Q8. Are phones/ cameras allowed?

A8. Yes, Contractors are authorized to bring phones/cameras during the site visit scheduled 11 February 2019 at 10am for solicitation FA449719RA006.