FBO_posted_pre-site_visit_questions_2.docx

DOCX document 16 KB Posted

Attached to
Repair B793 Foundation and Demo Door Pockets
Solicitation number
FA449719RA006
Issued by

About this file

The remaining questions submitted prior to the site visit have been answered. See attached document.

View the file

Other files

File Type Posted
B793_Utilities_2.pptx PPTX presentation
B793_Site_Visit__2_Questions.pdf PDF
All_Site_Visit_1_Answers.pdf PDF
Bldg_793_Mezzanine_Floor_Plan.ppt PPT presentation
B793_Utilities.pptx PPTX presentation
Solicitation_Amendment_FA449719RA0060001_SF_30.pdf PDF
DAFB_Local_Design_Guide_w_Appendix_D_(9_April_2017).pdf PDF
31_25_10_DAFB_Sediment_and_Erosion_Control_(9_April_2018).pdf PDF
01_11_10_DAFB_General_Requirements_(9_April_2018).pdf PDF
02_61_10_DAFB_Environmental_Control_(9_April_2018).pdf PDF
DAFB_Architectural_Compatibility_Plan.pdf PDF
2_of_16_.pdf PDF
15_of_16_M793.3.pdf PDF
6_of_16.pdf PDF
9_of_16.pdf PDF
12_of_16.pdf PDF
5_of_16_M793.2.pdf PDF
7_of_16.pdf PDF
10_of_16.pdf PDF
16_of_16.pdf PDF
13_of_16_M793.1.pdf PDF
4_of_16_E793.1_(1).pdf PDF
3_of_16_E793.1_.pdf PDF
1_of_16_.pdf PDF
14_of_16.pdf PDF
8_of_16.pdf PDF
11_of_16.pdf PDF
FBO_posted_questions_1_pre-site_visit.docx DOCX document
Foundation.pdf PDF
Solicitation_-_FA449719RA006.pdf PDF
Wage_Determination_Bldg_1-4-19_DE190007.pdf PDF
SOW_-_B793_Rpr_Foundation_(19_Oct_18).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1. Please provide DAFB Specs & Criteria, DAFB Design Guide, DAFB ARCHITECTURAL Compatibility Plan, DAFB Standard Specifications.

A1. Reference solicitation FA449719RA006, SOW Part II section 1. Dover Air Force Base specifications and criteria are attached.

Q2. Please provide Flight Line Driving provisions under DAFBI-13-202.

A2. Flight Line Driving provisions under DAFBI-13-202 is not required for this requirement. DAFB will provide an escort to deliver and demobilize construction equipment on the South side of B793. If more driving is required through the Entry Control Point (ECP) for deliveries of materials than we can escort Airfield Management will conduct a training for drivers. The training will need to be scheduled in advance and will take about 45 minutes.

Q3. Section 4.1 of the SOW – Please identify permits that are required for this project.

A3. Reference solicitation FA449719RA006, SOW part II section 4.1.2, work clearance, welding, airfield temporary construction waiver if a crane is used. Please note, this may not be a complete list of permits needed to complete the project.

Q4. Section 4.7 of the SOW – Are hazardous materials present in the building, soils, or groundwater?

A4. Hazardous material has not been identified.

Q5. Are Offerors to provide pricing for hazardous material testing/survey as part of their bids, with the expectation that disposal of such materials will be addressed via contract modification?

A5. Yes offerors are to provide testing for hazardous material testing. For paint containing lead below the EPA/HUDD standard for Lead Based Paint (LBP) offerors are also to provide pricing to comply with OSHA regulations. If the offeror decides to remediate paint containing lead below the LBP standard that cost is to be included in the proposal. If materials removed contain LBP they should be recycled as scrap metal. The contractor should also include costs in their bid for handling LBP containing recycled materials in compliance with OSHA regulations. If asbestos containing materials are identified that need to be removed to perform the work they will either be remediated by separate contract or as a contract modification.

Q6. Is an Air Permit (section 4.7.7) required prior to placement for a Temporary Generator for Power?

A6. Reference solicitation FA449719RA006, SOW Part II section 4.7.7, an Air Permit is not required provided the generator(s) is/are less than 450 kW each.

Q7. Are any additional tests required to drive a POV on Dover AFB?

A7. There are no additional test required to drive a Personally Owned Vehicle (POV) on Dover AFB. A license, insurance, and registration is required.

Q8. Are Offerors to provide Swing Space for the building’s occupants, or is this provided by the government?

A8. Swing space is provided by the government in B792. The offeror is only required to provide temporary electric service to B792.

Q9. For bidding purposes, can the government provide a percent of “bent girts” that must be replaced?

A9. The percentage of bent girts remains unknown until siding is removed.

Q10. Is it acceptable to reuse removed materials (girts, siding, flashing) if found to be in acceptable condition, or should Offerors provide pricing for new siding, flashing, and girts?

A10. Yes, materials removed may be reused if they are in acceptable condition and they do not contain LBP.