9_of_16.pdf

PDF 845 KB Posted

Attached to
Repair B793 Foundation and Demo Door Pockets
Solicitation number
FA449719RA006
Issued by

About this file

9 of 16 available drawings

View the file

Other files

File Type Posted
B793_Utilities_2.pptx PPTX presentation
B793_Site_Visit__2_Questions.pdf PDF
All_Site_Visit_1_Answers.pdf PDF
Bldg_793_Mezzanine_Floor_Plan.ppt PPT presentation
B793_Utilities.pptx PPTX presentation
Solicitation_Amendment_FA449719RA0060001_SF_30.pdf PDF
DAFB_Local_Design_Guide_w_Appendix_D_(9_April_2017).pdf PDF
FBO_posted_pre-site_visit_questions_2.docx DOCX document
31_25_10_DAFB_Sediment_and_Erosion_Control_(9_April_2018).pdf PDF
01_11_10_DAFB_General_Requirements_(9_April_2018).pdf PDF
02_61_10_DAFB_Environmental_Control_(9_April_2018).pdf PDF
DAFB_Architectural_Compatibility_Plan.pdf PDF
2_of_16_.pdf PDF
15_of_16_M793.3.pdf PDF
6_of_16.pdf PDF
12_of_16.pdf PDF
5_of_16_M793.2.pdf PDF
7_of_16.pdf PDF
10_of_16.pdf PDF
16_of_16.pdf PDF
13_of_16_M793.1.pdf PDF
4_of_16_E793.1_(1).pdf PDF
3_of_16_E793.1_.pdf PDF
1_of_16_.pdf PDF
14_of_16.pdf PDF
8_of_16.pdf PDF
11_of_16.pdf PDF
FBO_posted_questions_1_pre-site_visit.docx DOCX document
Foundation.pdf PDF
Solicitation_-_FA449719RA006.pdf PDF
Wage_Determination_Bldg_1-4-19_DE190007.pdf PDF
SOW_-_B793_Rpr_Foundation_(19_Oct_18).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOVER, DELAWARE

DOVER AIR FORCE BASE

BUILDING 793

N O R T H

REVISION DESCRIPTIONDATE

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:Chugach Support Services Inc.

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

COVER SHEET

SHEET 1 OF 2MJZ

DRAWN BY:

G1

SCALE OF VIEWPORT MUST BE .0025

A/C AIR CONDITION

ACT ACOUSTIC

AFF ABOVE FINISHED FLOOR

ALUM ALUMINUM

APPROX APPROXIMATELY

CB CIRCUIT BREAKER

CFM CUBIC FEET A MINUTE

CO CLEAN OUT

COM/LANCOMMUNICATION / LOCAL AREA NETWORK
CONCCONCRETE

CONT CONTINUOS

DW/PTDDRYWALL, PAINTED
ELECELECTRICAL

EW EYE WASH

EX EXHAUST

FD FLOOR DRAIN

FIN GR FINISH GRADE

GFI GROUND FAULT INTERRUPT

GYP GYPSUM

HM HOLLOW METAL

MAX MAXIMUM

MIN MINIMUM

O.C. ON CENTER

O.D. OUTSIDE DIAMETER

PLS PLACES

PNL PANEL

RECP RECEPTACLE

REF REFERENCE

RM ROOM

SQ SQUARE

TYP TYPICAL

VCT VINYL COMPOSITION TILE

G1 COVER SHEET

A1 ELEVATIONS

DRAWING INDEX ABBREVIATIONS

PLOT SCALE:AS BUILT DATE:

1=1 FOR 24x36

EVREUX STREET, BUILDING 638 DOOR #2

DAFB, DE 19902

P.O. Box 2049

OFFICE: (302) 735-5570 FAX: (302) 735-9737

19 JUN 06 AS BUILT MJZ

19 JUN 06 051073C / DO# 5059

REPAIR ROOF MAINTENANCE SHOP 793

REPAIR ROOF MAINTENANCE SHOP 793

QC MANAGER

DAVID NEAL DATE

8" 8"

8"8"

8" 8"

8"

8"

8"

8" 8" 8" 8" 8"

8" 8

8"

8"

8"

" 6

8"

12"

24"

10"

12"

8"

8"

8"

8"

8"

10"

10"

20" 10"10"

STORAGE TANK

(BLDG 611)

PUMPHOUSE (BLDG 610)

2- 700 &

2-

1400 GPM

PRODUCTION = 4,032,000 GAL

POINT OF CHLORINATION

(ELEC); 16 HOUR

HOUSE (BLDG 641)

1-700 GPM (ELEC);

16 HOUR PRODUCTION

750,000

GAL. CAPACITY

WELL "B" & PUMP-=672,000 GAL

DELUGE FIRE STORAGE

3000,000 GAL. ABOVE

GROUND - 40' DIA.

TANK (BLDG 946)

PUMPHOUSE (BLDG 717)

4-

2500 GPM

(GAS)-DELUGE SYSTEM

RESERVIOR (BLDG 718)

DELUGE SYSTEM

500,000 GAL. CAPACITY-

1A83

1A84

1A85 1A86 1A87

1A82

1A81

1A72

1A74

1A73

1A75

1A71 1A70

1A76

1A77

1A78

1A79

1A69

1A68

1A67

1A66

A

1A80

1B73

1B72

1B71

1B74

1A64

A

A

A

1B75

1B70

1B69

A

1A59

1A58

A

A

A

A

A

1A49

1A45

A

A

1B60

1A47

1B60

1A48

1A53

1A54 1A55

1B76

1B77

1B68 1B66

1B67

1B65 1B62

1B63

B

A

A

A

A

1A

1A

1A

1A

1A

1A

1B78

B

1 1/2" PVC

10"

B

B

P A R K I N G

P A R K I N G

PARKING

P A R K I N G

PARKING

PKNG.

PARKING

PARKING

PARKING

P A R K I N G

P A R K I N G

PARKING

P A R K

IN

G

MAIN RAMP

C-5 PARKING MAIN RAMP

N O R T H

G A T E

TRACK

T A N K

T A N K S

T A N K

T A N K S

T A N K

T A N K S

T A N K

T

STORAGE

OPEN

CONTROL

STORAGE

M O T O R

P O O L

OPEN

OPEN STORAGE

CC

T A X I W A Y

G

TAXIWAY "A"

D

IE

S E L

M O G A S

T A N K S

T A N K S

F U E L

APPR

OACH

/ D

EPAR

TURE

CLE

ARAN

CE

A P P R O A C H

D E P A R T U R E

C L E A R A N C E

67442

67443

67922

67910

65000

64502

68526

68528

67502

67501

67483

67484

64503

65004

82700

611 6

69615

65003

US ROUTE 113

ARNOLD DRIVE EXTENDED

N D

S T

O R L Y

S T

EVREUX

R D

S T

ST.

ATLANTIC STREET

T H

S T

T H

S T

T H

S T

RAMP ROAD

A P Z

756 757

BB AA Z Y X W V U T S R Q P O

T A N

KC

E L L

C E L L

T A N K

F A R M

T A N K

EL

.9

E 5, 7.

N 4, 3.

B R

AS

S

D

IS

K

E 6, 2.

N 4, 7.

EL

.7 3B

R

AS

S

D

IS

K

E 6, 3.

N 4, 8.

EL

.4 8B

R

AS

S

D

IS

K

H

AR

TM

AN

N

AS

S O C

H

AR

TM

AN

N

AS

S O C

H

AR

TM

AN

N

AS

S O C

US ROUTE 113

39 40 41

S S

S S

S S

X X X X

EL

.7

N 4, 7.

E 6, 8.

68525

68525

64502

68525

68525

64502

68525 64502

65331

68525

C-5 C-5 C-5 C-5 C-5 C-5 C-5 C-5 C-5 C-5 C-5 C-5

C-5

C-5

C-5

C-5 C-5

C-5

3050' 220'600'1,100'

700'

8 9

13 1

E X

IS

T

IN

G

P O L E

N E W

P O U R

M O U N T

X F O R M E R

N E W

U N D E R G R O U N D

S E C

X

T R A

IL

E R

MJZAS BUILT19 JUN 06

051073C / DO# 5059

REVISION DESCRIPTIONDATE

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:Chugach Support Services Inc.

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

ELEVATIONS

SHEET 2 OF 2MJZ

DRAWN BY:

A1

REPAIR ROOF MAINTENANCE SHOP 793

PLOT SCALE:

19 JUN 06

AS BUILT DATE:

1=1 FOR 24x36

EVREUX STREET, BUILDING 638 DOOR #2

DAFB, DE 19902

P.O. Box 2049

OFFICE: (302) 735-5570 FAX: (302) 735-9737

DAVID NEAL DATE

QC MANAGER

SCALE: NONE

NORTH ELEVATION

SCALE: NONE

WEST ELEVATION

SCALE: NONE

SOUTH ELEVATION

SCALE: NONE

EAST ELEVATION

DOWNSPOUTS COLOR BASE

STANDARD

EAGLE FEATHER TAN

SSMR

COLOR: BALD EAGLE BROWN

ICI DEVOE #4208-7460

SSMR

COLOR: BALD EAGLE BROWN

ICI DEVOE #4208-7460

DOWNSPOUTS TO MATCH SIDING

ICI DEVOE #BLK 1P32 YOX 1P39 OXR 19

"DAFB EAGLE FEATHER TAN"

DOWNSPOUTS COLOR BASE

STANDARD

EAGLE FEATHER TAN

GUTTERS, FASCIA LOUVERS &

ROOF ACCESSORIES TO

MATCH ROOF AND SIDING

ICI DEVOE #4208-7460

"DAFB BALD EAGLE BROWN"

DOWNSPOUT

DOWNSPOUT

DOWNSPOUT

NEW SSMR WITH RIDGE CAP, VENTED SOFFIT AND

SNOW BARS, PLACED OVER OLD ROOF SYSTEM

COLOR: BALD EAGLE BROWN

ICI DEVOE #4208-7460

NEW SSMR WITH RIDGE CAP, VENTED SOFFIT AND

SNOW BARS, PLACED OVER OLD ROOF SYSTEM

COLOR: BALD EAGLE BROWN

ICI DEVOE #4208-7460

DOWNSPOUT

DOWNSPOUT

DOWNSPOUT

DOWNSPOUT

SNOW BAR

SNOW BAR

SNOW BAR

GUTTERS, FASCIA LOUVERS &

ROOF ACCESSORIES TO

MATCH ROOF AND SIDING

ICI DEVOE #4208-7460

"DAFB BALD EAGLE BROWN"

Sht01.pdf
COVER SHEET
Sht02.pdf
A1 Elevations

File details come from the government source that posted it.