Attachment 8 Removal and Disposal of Asbestos Material Division 0282
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 May 12 Attachment 8
DIVISION 0282
REMOVAL AND DISPOSAL OF ASBESTOS MATERIALS
General
a. Scope.
This section specifies the requirements applicable to the removal, handling and disposal of all asbestos containing materials at Dover AFB. All work involving the removal and disposal of asbestos containing materials shall be accomplished in conformance with the requirements specified herein and with related requirements covered by the other divisions of these specifications.
b. Description of Work.
The work covered by this division includes the handling of friable and non-friable materials containing asbestos which are encountered during removal and demolition operation and the incidental procedures and equipment required to protect workers and occupants of the building or area, or both, from contact with airborne asbestos fibers.
The work also includes the disposal of the removed asbestos-containing materials.
Perform work in accordance with 29 CFR 1926.1101, and 40 CFR 61, Subparts A and
M, and the requirements specified herein. All non-mandatory material within 29 CFR
1926.1101 shall be considered mandatory for the purposes of this specification. The asbestos abatement subcontractor is responsible for being current and conforming with all EPA, OSHA, DNREC, and State of Delaware regulations pertinent to the removal and disposal of asbestos materials and shall hold the responsibility of the "Competent Person" as stated in the aforementioned regulations.
c. Referenced Standards.
The publications listed below form a part of this specification to the extent referenced.
The publications are referred to in the text by the basic designation only.
(1) Federal Standard (Fed. Std.):
Fed. Std. 595B Colors
(2) Military Standard (Mil. Std.):
MIL-STD-101B Color Code for Pipelines and for Compressed-Gas
Cylinders
(3) Code of Federal Regulations (CFR) Publications:
29 CFR Access to Employee Exposure and
1910.20 Medical Records
29 CFR Respiratory Protection
1910.134
29 CFR Specifications for Accident
1910.145 Prevention Signs and Tags
29 CFR Asbestos
1 May 12 Attachment 8
1926.1101
40 CFR 61, General Provisions
Subpart A
40 CFR 601, National Emission Standard for
Subpart M Asbestos
40 CFR 241 Guidelines for the Land Disposal of Solid Wastes
40 CFR 257 Criteria for Classification of Solid Waste Disposal
Facilities and Practices
40 CFR 763 Asbestos Hazard Emergency Response Act
(AHERA)
49 CFR 171, Transportation of Hazardous
172 & 173 Materials
(4) American National Standards Institute (ANSI) Publications:
Z9.2-79 Fundamentals Governing the Design and Operation of Local Exhaust Systems
Z88.2-92 Practices for Respiratory Protection
(5) National Institute of Occupational Safety and Health (NIOSH) Publications:
Manual of Analytical Methods, 2nd Ed., Vol. 1, Physical and Chemical analysis
Method (P&CAM)
Method 239 Asbestos Fibers in Air
Method 7400 Fibers (Nl, 3rd Ed., Vol. 1)
(6) Underwriters Laboratories, Inc. (UL) Publications:
586-90 Test Performance of High Efficiency, Particulate, Air Filter Units
(7) Air Force Occupational Safety and Health (AFOSH) Stds:
161-1 Respiratory Protection Program
(8) State of Delaware Standards:
Delaware Regulations Governing the Control of Air Pollution, Section 10, Emission
Standards for Asbestos.
d. General Requirements.
The "Competent Person" shall possess a current project supervisor badge required for the removal of asbestos as required by Federal, state, and local safety and health requirements. Asbestos workers shall possess a current asbestos removal badge for the removal of asbestos as required by Federal, State, and local laws and regulations.
(1) Title to Materials. Materials resulting from demolition work, except as specified otherwise, shall become the property of the contractor and shall be disposed of as specified herein.
1 May 12 Attachment 8
(2) Protection of Existing Work to Remain. Perform demolition work without damage or contamination of adjacent work. Where such work is damaged or contaminated, restore work to the original condition.
e. Permits Of Notifications.
Secure necessary permits in conjunction with asbestos removal, hauling, and disposition and provide timely notification of such actions as may be required by federal, state, regional, and local authorities. Notify the Environmental Protection Agency Region III, and State of Delaware Department of Natural Resources and Environmental Control
(DNREC) in accordance with 40 CFR 61 subpart M 20 days prior to asbestos removal work. Notification requires submittal of DNREC "10 Day Notice" form to DNREC and
USEPA. Dover Air Force Base also requires "10 Day Notice" prior to asbestos removal.
Failure to comply with this requirement may result in a fine of up to $25,000 per day.
This fine is the contractor's responsibility and is at no cost to the government.
f. Safety and Health Compliance.
In addition to detailed requirements of this specification, comply with laws, ordinances, rules, and regulations of federal, state , regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with the applicable requirements of the current issue of 29 CFR 1926.1101 and 40 CFR 61, Subpart A and M. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where specification requirements and referenced documents vary, the most stringent requirement shall apply.
g. Stop Work Provisions.
If any aspect of the work is in violation of specification requirements, the CO will issue a stop work order to be in effect immediately and until the violation is resolved. Standby time and expenses required to resolve the violation shall be at the contractor's expense.
h. Respirator Program.
Establish a respirator program as required by ANSI Z88.2 and 29 CFR 1910.134, and
AFOSH 161-1.
i. Industrial Hygienist (IH).
The industrial hygienist shall be State of Delaware certified as an asbestos abatement supervisor and have a minimum of 3-5 years experience in asbestos abatement experience. The IH hired by the general contractor shall not be a member of the same corporation or firm as the abatement subcontractor. The IH will oversee the project and bring immediately to the attention of the CO any asbestos abatement procedures identified that are not approved by the State of Delaware, unsafe work practices and sample results exceeding the action level. The IH will be responsible for the following work:
(1) The IH shall prepare and sign the asbestos removal plan.
(2) All monitoring test results shall be reviewed and signed by the IH and the laboratory employee.
1 May 12 Attachment 8
(3) The IH shall be available for any emergencies or additional consultation at no additional cost to the government.
(4) The pre-abatement inspection and release of the contractor to begin abatement will be conducted by the IH or his designated representative in each containment area.
The release will be documented in writing.
(5) The contractor cannot begin any abatement of either friable or non-friable asbestos-containing material until he receives written authorization from the IH or his designated representative to proceed for each new work area.
(6) The IH will be responsible for the final visual inspection and final air test for each major work area. The IH shall conduct the final visual inspection and final air test for each major work area after the IH and abatement contractor's competent person have agreed the work area is ready for inspection.
(7) The IH has the authorization to halt abatement activities at any time, irrespective of airborne fiber levels, if the provisions of asbestos removal plan are not being followed by the abatement contractor or the general contractor.
(8) The IH is responsible for ensuring that adequate personnel are on site to perform both asbestos removal monitoring and air sampling.
j. Special Submittal Requirements.
The following items shall be submitted to and approved by the CO prior to commencing work involving asbestos materials. (Items A, B, C, D, H and I shall be submitted together at one time for approval.)
(1) Asbestos Plan: Submit a detailed plan of the work procedures to be used in the removal and demolition of materials containing asbestos. The plan shall be prepared, signed, and sealed, including certification number and date, by the industrial hygienist. Such plan shall include a sketch showing the location, size, and details of asbestos control areas, location and details of the decontamination layout of decontamination area, and locations of local exhaust equipment. The plan shall also include interface of trades involved in the construction, sequencing of asbestos-related work, disposal plan, type of wetting agent to be used, air monitoring, respirators, protective equipment, pressure differential monitoring device, and a detailed description of the method to be employed in order to control pollution. The plan shall be approved prior to the start of any asbestos work. Prior to beginning work, the contractor and industrial hygienist shall meet with the CO to discuss in detail the asbestos plan, including work procedures and safety precautions. Upon approval of the CO this plan will become the specification for the asbestos removal and disposal on this project.
(2) Testing Laboratory: Submit the name, address, and telephone number of the testing laboratory selected to perform the monitoring, testing, and reporting of airborne concentrations of asbestos fibers along with certification that persons counting the samples have been judged proficient by successful participation within the last year in the National Institute for Occupational Safety and Health (NIOSH) Proficiency
Analytical Testing (PAT) Program.
1 May 12 Attachment 8
(3) Industrial Hygienist: Submit the name, address, and telephone number of the industrial hygienist selected to prepare asbestos plan, direct monitoring and perform training, and a certification that the industrial hygienist is certified by the State of
Delaware , including certification number and date, and is experienced in asbestos removal activities. Also include a copy of the industrial hygienist firm’s State of
Delaware certificate.
(4) Monitoring Results: Fiber counting shall be completed and results reviewed by the industrial hygienist within 16 hours of their collection. The results shall be posted at the work site within 24 hours. The industrial hygienist shall notify the contractor and the CO immediately of any exposure to fibers in excess of the acceptable limits.
Submit monitoring results to the CO within 3 working days, signed by the testing laboratory employee performing air monitoring, the employee that tested the sample, and the industrial hygienist.
(5) Notification: Notify the CO 10 working days prior to the start of asbestos work.
Submit copies of all permits required by EPA and DNREC for asbestos removal.
(6) Landfill: Submit copies of all letters requested by or received from the Delaware
Solid Waste Authority. Submit detailed delivery tickets, prepared, signed, and dated by an agent to the landfill, certifying the amount of asbestos materials delivered by the landfill, within 3 working days after delivery.
(7) Negative Air System: A negative air system shall be installed and operated in accordance with ANSI Z9.2. The local exhaust system shall be operated continuously, 24 hours a day, until the enclosure of the asbestos control area is removed. Pressure differential recordings for each workday shall be reviewed by the industrial hygienist and submitted to the CO within 24 hours from end of each workday. The industrial hygienist shall notify the contractor and the CO immediately of any variance in the pressure differential which could cause exposure of adjacent unsealed areas to asbestos fiber concentrations in excess of the action level.
(8) Training: The contractor shall submit current State of Delaware certificates that the employee has received approved training in the proper handling of materials that contain asbestos. The contractor shall also submit the asbestos firm’s State of
Delaware certificate.
(9) Final Report: The contractor shall submit a final report and daily log book documenting all findings of sampling data, observations, problems encountered with removal operations, actions taken to resolve problems, negative pressure readings of control area enclosures, and all acceptance monitoring to reopen the facility will be submitted to the CO, for the purpose of documenting the removal operation, and review of information for final facility acceptance by the Air Force.
2. Execution.
a. Equipment.
(1) Respirators. Select respirators approved by the Mine Safety and Health
Administration (MSHA) and the National Institute for Occupational Safety and
Health (NIOSH), Department of Health and Human Services, for use in atmosphere
1 May 12 Attachment 8 containing asbestos fibers. Provide personnel engaged in the removal or demolition of pipes, structures, or equipment covered or insulated with asbestos, or in the removal or demolition of asbestos insulation or covering, with Type C supplied air respirators.
(2) Special Clothing and Accessories. Clothing and accessories shall be utilized as specified by Federal, State and Local laws and regulations.
(3) Change Rooms. Change rooms will be utilized as specified by Federal, State and
Local laws and regulations.
(4) Warning Signs and Labels. Provide warning signs at approaches to asbestos control areas containing airborne asbestos fibers. Locate signs at such distance that personnel may read the sign and take the necessary protective steps required before entering the area. Provide labels and affix to asbestos materials, scrap, waste, debris, and other products contaminated with asbestos.
(a) Warning Signs. Provide warning signs that are of sufficient size to be clearly legible and display the following information:
DANGER
ASBESTOS
CANCER AND LUNG DISEASE HAZARD
AUTHORIZED PERSONNEL ONLY
RESPIRATORS AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA
(b) Warning Labels: Provide labels of sufficient size to be clearly legible, printed in large, bold letters on a contrasting background, and displaying the following legend:
DANGER
CONTAINS ASBESTOS FIBERS
AVOID CREATING DUST
CANCER AND LUNG DISEASE HAZARD
(5) Tools and Negative Air System. Provide a negative air system in the asbestos control area. Filters on vacuums and exhaust equipment shall be UL 586-labeled
HEPA filters. Negative air equipment shall be sufficient to maintain a minimum pressure differential of minus 0.02 inch of water column relative to adjacent, unsealed areas. Provide a manometer-type negative pressure differential monitor with minor scale division of 0.02 inch of water and accuracy within plus or minus
1.0 percent. Calibrate the manometer daily as recommended by the manufacturer.
Provide manually recorded manometer readings of the pressure differential between the asbestos control area and adjacent unsealed areas at the beginning of each workday and every 2 working hours thereafter. The negative air system shall be operated continuously, 24 hours a day, until the asbestos control area enclosed is removed. Replace filters as required to maintain the efficiency of system. The building heating, ventilating, and air conditioning (HVAC) system shall not be used as the local exhaust system for the asbestos control area.
b. Work Procedure.
1 May 12 Attachment 8
Perform asbestos-related work in accordance with 29 CFR 1926.1101 and as specified herein. Use wet removal procedures. Personnel shall wear and use protective clothing and equipment as specified herein. Eating, smoking, drinking, chewing tobacco or chewing gum shall not be permitted in the asbestos control area. Personnel of other trades not engaged in the removal and demolition of asbestos shall not be exposed at any time to airborne concentrations of asbestos in excess of 0.01 fibers unless the personnel protection provisions of this specification are complied with by the trade personnel. Shut down the building HVAC system. Disconnect electrical service when wet removal is performed and provide temporary electrical service protected by a ground fault circuit interrupter.
(1) Masking and Sealing. Masking and sealing shall be performed in accordance with
Federal, State, and Local laws and regulations.
(2) Asbestos Handling Procedures:
(a) General Procedures. Sufficiently wet asbestos material, including floor tile and cement asbestos board, with a fine spray of amended water during removal, cutting, or other handling to reduce the emission of airborne fibers. Remove material and immediately place in plastic disposal bags. When both piping and insulation are to be removed, wet the insulation, then, using glovebag technique, remove up to three foot sections of the pipe insulation and encapsulate exposed edges of the asbestos insulation to remain, and remove the pipe. Where unusual circumstances prohibit the use of plastic disposal bags, the industrial hygienist shall submit, in the asbestos plan, an alternate proposal for removal of asbestos materials and containment of asbestos fibers.
(b) Exposed Pipe Insulation Edges. Encapsulate exposed edges of asbestos insulation to remain. Wet and cut the rough ends true and square with sharp tools and encapsulate the edges with a 1/4-inch-thick layer of insulating cement troweled to a smooth, hard finish. When cement is dry, lag the end with a layer of fiberglass cloth and thermal insulation adhesive, overlapping the existing ends by 4 inches.
When insulating cement and cloth are an impractical method of sealing raw edges of asbestos, take appropriate steps to seal the raw edges as approved by the CO.
Remove existing asbestos insulation for new piping connections during the asbestos handling and disposal procedures as specified herein.
(3) Identification of Asbestos-Free Insulation. Apply "ASBESTOS-FREE" markings to the exterior jackets of non-asbestos-insulated piping installed herein. Letter size shall be in accordance with MIL-STD-101. Apply marking at maximum of 20-foot intervals. Indicate the limits of "ASBESTOS-FREE" insulation with a 1-inch wide band with attached arrow pointing in the direction of the label "ASBESTOS-FREE."
Paint markings in orange, No. 12246 of Fed. Std. 595.
(4) Monitoring. Monitoring of airborne concentrations of asbestos fibers shall be in accordance with 29 CFR 1926.1101, 40 CFR 763 and as specified herein, whichever is stricter. The government shall have the option to perform independent monitoring.
1 May 12 Attachment 8
(5) Site Inspection. While performing asbestos removal work, the contractor shall be subject to on-site inspection by a Government SABER Project Manager trained in asbestos working procedures who may be assisted by safety or health personnel.
c. Cleanup and Disposal.
(1) Cleanup. Maintain surfaces of the asbestos control area free of accumulations of asbestos fibers. Restrict the spread of dust and debris; keep waste from being distributed over the general area. Do not dry sweep or blow down the space with compressed air. Clean all surfaces in the work area and other contaminated areas with water and/or HEPA vacuum equipment. The IH or his designated representative shall visually inspect the affected surfaces for residual asbestos material and accumulated dust; the contractor shall re-accomplish cleaning of areas showing dust or residual asbestos materials. If additional cleaning is required, monitor the airborne fiber concentration after additional cleaning. After cleaning the work area, allow 24 hours for settlement of dust and wet clean or clean with
HEPA vacuum equipment all surfaces in the work area. When asbestos removal, disposal, and cleanup are complete, the industrial hygienist shall certify, in writing, that the concentration of airborne fibers in the control area is less than 70 structures/mm2 per TEM analysis, using aggressive monitoring procedures., the contractor shall repeat the cleaning until a satisfactory fiber count is reached, at no additional cost to the government. Aggressive monitoring will be as detailed in the
EPA publication Guidance for Controlling Asbestos-Containing Material in
Buildings, Appendix M.1.5. Do not remove the asbestos control area enclosure and caution signs prior to the CO's receipt of the industrial hygienist's certification.
After final cleanup, remove filters on the building HVAC system and provide new filters. Dispose of filters as asbestos-contaminated materials. Reestablish HVAC, mechanical, and electrical systems in proper working order. Notify the CO before unrestricted entry is permitted. The government shall have the option to perform independent monitoring to certify the areas are safe before entry is permitted.
(2) Disposal of Asbestos. Collect asbestos waste, scrap, debris, bags, containers, equipment, and asbestos-contaminated, clothing which may produce airborne concentrations of asbestos fibers; place in sealed impermeable bags imprinted with a caution label. Dispose of waste asbestos material by burial at the State of Delaware approved sanitary landfill for each class of asbestos. For temporary storage, store sealed impermeable bags in asbestos waste drums. An area for interim storage of asbestos waste-containing drums will be assigned by the CO or by an authorized representative. Procedure for hauling and disposal shall comply with 40 CFR 61, Subpart M, 40 CFR 241 and 257, 49 CFR 171, 172 and 173, and state, regional, and local standards. Sealed plastic bags may be dumped from drums into the burial site unless the bags have been broken or damaged. Damaged bags shall remain in the drum and the entire contaminated drum shall be buried. Uncontaminated drums may be recycled. Workers unloading the sealed drums shall wear appropriate respirators and personal protective equipment when handling asbestos materials at the disposal site.