Site Visit Questions Answers.pdf

PDF 19 KB Posted

Attached to
Replace Broken Storm Drain Pipe, B 764 Parking Lot Federal contract opportunity
Solicitation number
FA4488-09-R-0033
Issued by
Department of the Air Force Air Mobility Command

About this file

Questions answers from site visit

View the file

Other files for this federal contract opportunity

Other files attached to Replace Broken Storm Drain Pipe, B 764 Parking Lot, newest first.
File Type Posted
Drawing of area.pdf PDF
Site Visit Minutes.pdf PDF
Site Visit Agenda.pdf PDF
Attach 1 - SOW Replace Storm Drain Pipe.pdf PDF
Solication FA4488-09-R-0033.pdf PDF
Attach 8 - 01770 Contract Closeout Procedures.pdf PDF
Attach 4 - 01010 Unique Site Requirements.pdf PDF
Attach 1 - SOW Replace Storm Drain Pipe.pdf PDF
Attach 9 - Storm Drainage Spec.pdf PDF
Attach 6 Copy of AF Form 66.pdf PDF
Attach 3 - 001002 Greem Procurement.pdf PDF
Attach 5 - 01300 Submittals -.pdf PDF
Attach - 7 Spec 01 57 20 00 10-Env Protection During Const.pdf PDF
Attach 10 Davis Bacon WD NC11 07-24-2009.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Visit Questions & Answers

FA4488-09-R-0033

Replace Broken Storm Drain Pipe, B764 Parking Lot

Q. Are there any constraints on the working hours?

A. In accordance with the solicitation, Attachment 4, Section 01010 – Unique Site Requirements .Working Hours are from 07:00am to 04:00pm Monday through Friday.

Q. Where does the pipe come from and go?

A. See attached copy of the drawing. It shows the connection, but does not show where it is going.

Q. Are there any utilities around the broken manhole joint?

A. There are no utilities identified. In accordance with the solicitation, attachment 1, Statement of Work dated 16 September 2009, I. C. 1d. The Government POC shall submit and issue a digging permit prior to starting the project.

Q. Is the estimated cut size (20 foot long by 12 foot wide) for the asphalt estimated or required.

A. In accordance with the solicitation, attachment 1, Statement of Work, dated 16 September 2009, I.C.1b. Contractor shall cut an “estimated” 20 foot long X 12 foot wide area or “as required to reach and repair”.

Q. How are you going to repair the pipe? With a Collar?

A. Repair the pipe in accordance with the solicitation, attachment 9, Storm Drainage Specification.

Ensuring compliance with the manufacturer’s recommendations on the joints. Concrete collar may be used.

Q. Has the Pipe been TV’d?

A. No, it has not.

Q. Is the Pipe active?

A. Yes it is.

Q. Are we required to clean the pipe?

A. Cleaning is not a requirement.

Q. Can you put in a trench box?

A. In accordance with the solicitation, attachment 1, Statement of work, dated 16 September 2009, I.C.1.c. The contractor shall use a trench box. The boxes come in difference sizes and shall be used.