Attach 8 - 01770 Contract Closeout Procedures.pdf

PDF 13 KB Posted

Attached to
Replace Broken Storm Drain Pipe, B 764 Parking Lot Federal contract opportunity
Solicitation number
FA4488-09-R-0033
Issued by
Department of the Air Force Air Mobility Command

About this file

Attach 8 Spec 01770 Contract Closeout Procedures

View the file

Other files for this federal contract opportunity

Other files attached to Replace Broken Storm Drain Pipe, B 764 Parking Lot, newest first.
File Type Posted
Drawing of area.pdf PDF
Site Visit Minutes.pdf PDF
Site Visit Questions Answers.pdf PDF
Site Visit Agenda.pdf PDF
Attach 1 - SOW Replace Storm Drain Pipe.pdf PDF
Attach 4 - 01010 Unique Site Requirements.pdf PDF
Attach 1 - SOW Replace Storm Drain Pipe.pdf PDF
Attach 9 - Storm Drainage Spec.pdf PDF
Solication FA4488-09-R-0033.pdf PDF
Attach 6 Copy of AF Form 66.pdf PDF
Attach 3 - 001002 Greem Procurement.pdf PDF
Attach 5 - 01300 Submittals -.pdf PDF
Attach - 7 Spec 01 57 20 00 10-Env Protection During Const.pdf PDF
Attach 10 Davis Bacon WD NC11 07-24-2009.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4488-09-R-0033

Attachment 8

CONTRACT CLOSEOUT PROCEDURES

REPLACE BROKEN STORM DRAIN PIPE, BLDG764

PARKING LOT

01770-1Revised (7 Feb 2008)

SECTION 01770

CONTRACT CLOSEOUT PROCEDURES

PART I GENERAL

1.1 DESCRIPTION OF REQUIREMENTS

A. Definitions: Closeout is hereby defined to include general requirements near end of Contract

Time, in preparation for final acceptance, final payment, normal termination of contract, occupancy by the government and similar actions evidencing completion of the work.

Specific requirements for individual units of work are specified in individual specification sections.

1.2 PREREQUISITES TO FINAL INSPECTION

A. General: Prior to requesting the government’s final inspection, the Contractor must ensure compliance with all project requirements to include but not limited to the following:

1. Submit specific warranties, workmanship/maintenance bonds, maintenance agreements, final certifications and similar documents.

2. Deliver tools, spare parts, extra stocks of materials, and similar physical items to government.

3. Complete start-up testing of systems, and instructions of the government's operating/maintenance personnel. Discontinue (or change over) and remove from project site temporary facilities and services, along with construction tools and facilities, mock-ups, and similar elements.

B. When the Contractor considers the work has reached final completion, submit written certification that the contract documents have been reviewed, the work has been inspected, and that the work is complete in accordance with the contract documents and ready for final inspection.

C. Provide the Contracting Officer with a requested date for final inspection, in writing, not less than 5 working days prior to the proposed date of final inspection. The Contracting Officer will coordinate with the members of the inspection party and establish the final inspection date. If construction deficiencies are identified, the contractor must request re-inspection upon correction of the deficiencies. Suspense date will be mutually determined at final inspection.

D. Inspection Procedures: Upon receipt of the Contractor's request, the government will either proceed with inspection or advise Contractor of prerequisites not fulfilled. Inspection shall not be scheduled until all of the Contractor’s prerequisites have been fulfilled. The Government has the right to cease final inspection if excessive deficiencies are noted.

PART II. RECORD DOCUMENT SUBMITTALS

CONTRACT CLOSEOUT PROCEDURES

REPLACE BROKEN STORM DRAIN PIPE, BLDG764

PARKING LOT

01770-2Revised (7 Feb 2008)

2.1 WARRANTIES:

A. The contractor shall provide all manufacturers’ warranty documents for each item as required in specification sections of Division 1 through 16.

B. Bind the warranties into binders properly identified and indexed (thumb-tabbed). Include name, address, and telephone number of contact person. Bind all warranties in a heavy-duty 2", 3 ring vinyl-covered binder, and include pocket folders for folded sheet information.

Mark identification on both front and spine of each binder. Furnish in accordance with Schedule of Submittals.

PART III. EXECUTION

3.1 FINAL CLEANING

A. General: Comply with Specification 01000. The following are examples, but not limited to cleaning levels required:

1. Remove labels which are not required as permanent labels.

2. Clean transparent materials, including mirrors and window/door glass, to a polished condition, removing substances which are noticeable as vision-obscuring materials.

Replace broken glass and damaged transparent materials.

3. Clean exposed exterior and interior hard-surfaced finishes, to a dirt-free condition, free of dust, stains, films, and similar noticeable distracting substances. Except as otherwise indicated, avoid disturbance of natural weathering of exterior surfaces.

Restore reflective surfaces to original reflective condition.

4. Wipe surfaces of mechanical and electrical equipment clean; remove excess lubrication and other substances.

5. Remove debris and surface dust from limited-access spaces including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.

6. Wash, scrape, and scrub, using a detergent as necessary to remove all bond breaker, dirt and discoloration.

7. Vacuum clean carpeted surfaces and similar soft surfaces.

8. Clean plumbing fixtures to a sanitary condition, free of stains including those resulting from water exposure.

9. Clean light fixtures and lamps so as to function with full efficiency.

B. Removal of Protection: Except as otherwise indicated or requested by the government, remove temporary protection devices and facilities.

CONTRACT CLOSEOUT PROCEDURES

REPLACE BROKEN STORM DRAIN PIPE, BLDG764

PARKING LOT

01770-3Revised (7 Feb 2008)

C. Compliances: Comply with safety standards and governing regulations for cleaning operations. Do not burn waste materials on site, or bury debris or excess materials on government property, or discharge volatile or other harmful or dangerous materials into drainage systems; remove all waste materials from site and the facility and dispose of in a lawful manner.

PART IV. REQUEST FOR FINAL PAYMENT

A. Prior to request for final payment, Contractor must comply with all contract requirements to include receiving notification of approval by Contracting Officer.

END OF SECTION