Attach 10 Davis Bacon WD NC11 07-24-2009.pdf
PDF 9 KB Posted
- Attached to
- Replace Broken Storm Drain Pipe, B 764 Parking Lot Federal contract opportunity
- Solicitation number
- FA4488-09-R-0033
About this file
Attach 10 Davis Bacon WD
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Drawing of area.pdf | ||
| Site Visit Questions Answers.pdf | ||
| Site Visit Agenda.pdf | ||
| Site Visit Minutes.pdf | ||
| Attach 1 - SOW Replace Storm Drain Pipe.pdf | ||
| Attach 6 Copy of AF Form 66.pdf | ||
| Attach 3 - 001002 Greem Procurement.pdf | ||
| Attach 5 - 01300 Submittals -.pdf | ||
| Attach - 7 Spec 01 57 20 00 10-Env Protection During Const.pdf | ||
| Solication FA4488-09-R-0033.pdf | ||
| Attach 8 - 01770 Contract Closeout Procedures.pdf | ||
| Attach 4 - 01010 Unique Site Requirements.pdf | ||
| Attach 1 - SOW Replace Storm Drain Pipe.pdf | ||
| Attach 9 - Storm Drainage Spec.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Davis Bacon WD NC11 07-24-2009
GENERAL DECISION: NC20080011 07/24/2009 NC11
Date: July 24, 2009 General Decision Number: NC20080011 07/24/2009
Superseded General Decision Number: NC20070011
State: North Carolina
Construction Type: Highway
Counties: Alamance, Alexander, Buncombe, Burke, Cabarrus, Catawba, Cumberland, Davidson, Davie, Durham, Forsyth, Franklin, Gaston, Guilford, Lincoln, Mecklenburg, New Hanover, Onslow, Orange, Randolph, Rowan, Stokes, Union, Wake and Yadkin Counties in North Carolina.
HIGHWAY CONSTRUCTION PROJECTS (does not include tunnels,building structures in rest area projects, railroad construction, and bascule, suspension and spandrel arch bridges, bridges designed for commercial navigation, and bridges involving marine construction, and other major bridges).
Modification Number Publication Date 0 02/08/2008 1 07/25/2008 2 07/24/2009
* SUNC1990-014 02/12/1990
Rates Fringes
Carpenter......................$ 7.63
Concrete finisher..............$ 7.52
Electrician....................$ 10.26
Ironworker, reinforcing........$ 9.76
Laborers:
_Asphalt lay-down person....$ 7.25 _Asphalt raker..............$ 7.25 _Form setter (road).........$ 8.57 _General....................$ 7.25 _Mason (brick, block, stone)...................$ 7.44 _Pipelayer..................$ 7.25 _Power tool operator........$ 8.28
Power equipment operators:
_Asphalt distributor........$ 7.25 _Asphalt paver..............$ 7.47 _Bulldozer (utility)........$ 7.25 _Bulldozer..................$ 7.33 _Concrete curb machine......$ 7.25 _Concrete finishing machine.$ 7.85 _Concrete paver.............$ 7.25 _Crane, backhoe, shovel, and dragline:
____1 yd. & under..........$ 7.25 ____Over 1 yd..............$ 8.16
_Drill operator.............$ 7.34 _Grade checker..............$ 7.25 _Gradeall...................$ 8.38 _Grease person..............$ 7.25 _Loader.....................$ 7.25 _Mechanic...................$ 8.47 _Motor grader (fine grade)..$ 8.04 _Motor grader (rough grade).$ 7.68 _Oiler......................$ 7.25 _Roller (finisher)..........$ 7.25 _Roller (rough).............$ 7.25 _Scraper....................$ 7.25 _Screed asphalt.............$ 7.25 _Stone spreader.............$ 7.25 _Stripping machine operator.$ 7.25 _Subgrade machine...........$ 7.25 _Sweeper....................$ 7.25 _Tractor (utility)..........$ 7.25
Truck drivers:
___Heavy-duty...............$ 9.47 ___Multi-rear axle..........$ 7.25 ___Single rear axle.........$ 7.25
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .