Attach 10 Davis Bacon WD NC11 07-24-2009.pdf

PDF 9 KB Posted

Attached to
Replace Broken Storm Drain Pipe, B 764 Parking Lot Federal contract opportunity
Solicitation number
FA4488-09-R-0033
Issued by
Department of the Air Force Air Mobility Command

About this file

Attach 10 Davis Bacon WD

View the file

Other files for this federal contract opportunity

Other files attached to Replace Broken Storm Drain Pipe, B 764 Parking Lot, newest first.
File Type Posted
Drawing of area.pdf PDF
Site Visit Questions Answers.pdf PDF
Site Visit Agenda.pdf PDF
Site Visit Minutes.pdf PDF
Attach 1 - SOW Replace Storm Drain Pipe.pdf PDF
Attach 6 Copy of AF Form 66.pdf PDF
Attach 3 - 001002 Greem Procurement.pdf PDF
Attach 5 - 01300 Submittals -.pdf PDF
Attach - 7 Spec 01 57 20 00 10-Env Protection During Const.pdf PDF
Solication FA4488-09-R-0033.pdf PDF
Attach 8 - 01770 Contract Closeout Procedures.pdf PDF
Attach 4 - 01010 Unique Site Requirements.pdf PDF
Attach 1 - SOW Replace Storm Drain Pipe.pdf PDF
Attach 9 - Storm Drainage Spec.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Davis Bacon WD NC11 07-24-2009

GENERAL DECISION: NC20080011 07/24/2009 NC11

Date: July 24, 2009 General Decision Number: NC20080011 07/24/2009

Superseded General Decision Number: NC20070011

State: North Carolina

Construction Type: Highway

Counties: Alamance, Alexander, Buncombe, Burke, Cabarrus, Catawba, Cumberland, Davidson, Davie, Durham, Forsyth, Franklin, Gaston, Guilford, Lincoln, Mecklenburg, New Hanover, Onslow, Orange, Randolph, Rowan, Stokes, Union, Wake and Yadkin Counties in North Carolina.

HIGHWAY CONSTRUCTION PROJECTS (does not include tunnels,building structures in rest area projects, railroad construction, and bascule, suspension and spandrel arch bridges, bridges designed for commercial navigation, and bridges involving marine construction, and other major bridges).

Modification Number Publication Date 0 02/08/2008 1 07/25/2008 2 07/24/2009

* SUNC1990-014 02/12/1990

Rates Fringes

Carpenter......................$ 7.63

Concrete finisher..............$ 7.52

Electrician....................$ 10.26

Ironworker, reinforcing........$ 9.76

Laborers:

_Asphalt lay-down person....$ 7.25 _Asphalt raker..............$ 7.25 _Form setter (road).........$ 8.57 _General....................$ 7.25 _Mason (brick, block, stone)...................$ 7.44 _Pipelayer..................$ 7.25 _Power tool operator........$ 8.28

Power equipment operators:

_Asphalt distributor........$ 7.25 _Asphalt paver..............$ 7.47 _Bulldozer (utility)........$ 7.25 _Bulldozer..................$ 7.33 _Concrete curb machine......$ 7.25 _Concrete finishing machine.$ 7.85 _Concrete paver.............$ 7.25 _Crane, backhoe, shovel, and dragline:

____1 yd. & under..........$ 7.25 ____Over 1 yd..............$ 8.16

_Drill operator.............$ 7.34 _Grade checker..............$ 7.25 _Gradeall...................$ 8.38 _Grease person..............$ 7.25 _Loader.....................$ 7.25 _Mechanic...................$ 8.47 _Motor grader (fine grade)..$ 8.04 _Motor grader (rough grade).$ 7.68 _Oiler......................$ 7.25 _Roller (finisher)..........$ 7.25 _Roller (rough).............$ 7.25 _Scraper....................$ 7.25 _Screed asphalt.............$ 7.25 _Stone spreader.............$ 7.25 _Stripping machine operator.$ 7.25 _Subgrade machine...........$ 7.25 _Sweeper....................$ 7.25 _Tractor (utility)..........$ 7.25

Truck drivers:

___Heavy-duty...............$ 9.47 ___Multi-rear axle..........$ 7.25 ___Single rear axle.........$ 7.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .