Attach 5 - 01300 Submittals -.pdf

PDF 13 KB Posted

Attached to
Replace Broken Storm Drain Pipe, B 764 Parking Lot Federal contract opportunity
Solicitation number
FA4488-09-R-0033
Issued by
Department of the Air Force Air Mobility Command

About this file

Attch 5 Spec 01300 Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Replace Broken Storm Drain Pipe, B 764 Parking Lot, newest first.
File Type Posted
Drawing of area.pdf PDF
Site Visit Minutes.pdf PDF
Site Visit Questions Answers.pdf PDF
Site Visit Agenda.pdf PDF
Solication FA4488-09-R-0033.pdf PDF
Attach 1 - SOW Replace Storm Drain Pipe.pdf PDF
Attach 6 Copy of AF Form 66.pdf PDF
Attach 3 - 001002 Greem Procurement.pdf PDF
Attach - 7 Spec 01 57 20 00 10-Env Protection During Const.pdf PDF
Attach 10 Davis Bacon WD NC11 07-24-2009.pdf PDF
Attach 8 - 01770 Contract Closeout Procedures.pdf PDF
Attach 4 - 01010 Unique Site Requirements.pdf PDF
Attach 1 - SOW Replace Storm Drain Pipe.pdf PDF
Attach 9 - Storm Drainage Spec.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4488-09-R-0033

Attachment 5

SUBMITTALS

REPLACE BROKEN STORM DRAIN PIPE

BLDG 764 PARKING LOT

SECTION 01300

SUBMITTALS

PART 1 GENERAL

1.1 SUBMITTAL PROCEDURES

A. Coordinate submittal preparation with construction, fabrication, other submittals, and activities that require sequential operations. Transmit in advance of construction operations to avoid delay.

1. Coordinate submittals for related operations to avoid delay because of the need to review submittals concurrently for coordination. The Contracting Officer reserves the right to withhold action on a submittal requiring coordination until related submittals are received.

2. Processing: Allow 3 working days for initial review. Allow more time if the Contracting Officer must delay processing to permit coordination. Allow 3 additional days for reprocessing.

a. No extension of Contract Time will be authorized because of failure to transmit submittals sufficiently in advance of the work to permit processing.

3. Submittal: Transmit items as listed on the Schedule of Submittals utilizing AF

IMT 3000 as directed by the Contracting Officer.

B. Contractor's Construction Schedule: (Not Applicable)

C. Shop Drawings: (Not Applicable)

D. Product Data: Collect Product Data into a single submittal for each element of construction. Mark each copy to show applicable choices and options. Where Product Data includes information on several products, mark copies to indicate applicable information.

1. Include the following information:

a. Manufacturer's printed recommendations.

b. Compliance with trade association standards.

c. Compliance with recognized testing agency standards.

d. Application of testing agency labels and seals.

e. Notation of dimensions.

f. Notation of coordination requirements.

E. Samples: Submit full-size samples cured and finished as specified and identical with the material proposed.

1. Include the following:

a. Specification Section number and reference.

FA4488-09-R-0033

Attachment 5

SUBMITTALS

REPLACE BROKEN STORM DRAIN PIPE

BLDG 764 PARKING LOT

b. Generic description of the Sample.

c. Sample source.

d. Product name or name of the manufacturer.

e. Compliance with recognized standards.

F. Quality Assurance Submittals: Submit quality-control submittals, including design data, certifications, manufacturer's instructions, and manufacturer's field reports required under other Sections of the Specifications.

1. Certifications: Where certification that a product or installation complies with specified requirements is required, submit a notarized certification from the manufacturer certifying compliance.

G. Contracting Officer's Action: Except for submittals for the record or information, where action and return are required, the Contracting Officer will review each submittal, mark to indicate action taken, and return. Compliance with specified characteristics is the Contractor's responsibility.