J-3_Seed_Project_B_-_Bid_Schedule.pdf

PDF 87 KB Posted

Attached to
Asphalt & Paving IDIQ Federal contract opportunity
Solicitation number
FA4484-14-R-0006
Issued by
Department of the Air Force Air Mobility Command

About this file

Updated Bid schedule sheet for Seed Project B

View the file

Other files for this federal contract opportunity

Other files attached to Asphalt & Paving IDIQ, newest first.
File Type Posted
J-2_Seed_Project_A_-_Bid_Schedule.pdf PDF
FA4484-14-R-0006-0001.pdf PDF
J-4_Seed_Project_C_-_Bid_Schedule.pdf PDF
J-10_SAMPLE_Project_Drawings.pdf PDF
J-2_Seed_Project_A.pdf PDF
J-7_Wage_Determination_(NJ140001).pdf PDF
C-1_Statement_of_Work.pdf PDF
FA4484-14-R-0006_Solicitation.pdf PDF
J-3_Seed_Project_B.pdf PDF
J-6_Security_Forces_Appendix.pdf PDF
J-1_Sample_Project.pdf PDF
J-4_Seed_Project_C.pdf PDF
J-9_Healthcare_Statement.pdf PDF
J-5_Past_Performance_Questionnaire.pdf PDF
J-8_Evironmental_Compliance_Statement.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEED PROJECT B LINE STRIPING ~ CONCRETE AND PAVING IDIQ

PRICE SCHEDULE

PROJECT MAGNITUDE IS UNDER $25,000.00

Line Striping ~ Stripe over handicapped parking symbols, 12" wide crosswalk lines, and 4" wide parking lot lines with yellow and/or white paint Area will be free of debris before striping Buildings 5352 and 5353 parking lot ~ Dix

Item Description Quantity Unit Unit Price Total

1 Clean surface of debris prior to re-painting 4890 SF $__________ $__________

2 Paint over 4" existing parking lot lines 1630 LF $__________ $__________

3 Paint over 12" existing crosswalk lines 100 LF $_________ $__________

4 Handicapped parking symbol 8 SF $__________ $__________ 2 each X 4 SF each

5 Provide traffic control measures to block areas 1 EA $__________ $__________

TOTAL $__________

Provide further breakdown of pricing per note below *.

* Provide pricing detail and breakdown of all costs; to include, but not limited to a breakdown of the prime contractors labor, materials, direct and indirect cost, overhead and profit; subcontractor costs

(including evidence of subcontractor competition; breakdown of ALL material costs, labor costs, etc.).

Failure to provide supporting documentation may result in exclusion from further consideration.