J-2_Seed_Project_A_-_Bid_Schedule.pdf
PDF 87 KB Posted
- Attached to
- Asphalt & Paving IDIQ Federal contract opportunity
- Solicitation number
- FA4484-14-R-0006
About this file
Updated Bid schedule sheet for Seed Project A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-4_Seed_Project_C_-_Bid_Schedule.pdf | ||
| J-10_SAMPLE_Project_Drawings.pdf | ||
| FA4484-14-R-0006-0001.pdf | ||
| J-3_Seed_Project_B_-_Bid_Schedule.pdf | ||
| J-6_Security_Forces_Appendix.pdf | ||
| J-1_Sample_Project.pdf | ||
| J-4_Seed_Project_C.pdf | ||
| J-9_Healthcare_Statement.pdf | ||
| J-5_Past_Performance_Questionnaire.pdf | ||
| J-8_Evironmental_Compliance_Statement.pdf | ||
| J-2_Seed_Project_A.pdf | ||
| J-7_Wage_Determination_(NJ140001).pdf | ||
| C-1_Statement_of_Work.pdf | ||
| FA4484-14-R-0006_Solicitation.pdf | ||
| J-3_Seed_Project_B.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEED PROJECT A LINE STRIPING ~ CONCRETE AND PAVING IDIQ
PRICE SCHEDULE
PROJECT MAGNITUDE IS UNDER $25,000.00
Line Striping ~ Stripe over existing arrows, handicapped parking symbol, and 4" wide parking lot lines with yellow and/or white paint Area will be free of debris before striping Buildings 5317 and 5318 parking lot ~ Dix
Item Description Quantity Unit Unit Price Total
1 Clean surface of debris prior to re-painting 13701 SF $__________ $__________
2 Paint over existing parking lot lines 4567 LF $__________ $__________
3 Paint over existing arrows 7' long X 12" wide 48 SF $__________ $__________ 6 each X 8 SF each
4 Handicapped parking symbol 4 SF $__________ $__________ 1 each X 4 SF each
5 Provide traffic control measures to block areas 1 EA $__________ $__________
TOTAL $__________
Provide further breakdown of pricing per note below *.
* Provide pricing detail and breakdown of all costs; to include, but not limited to a breakdown of the prime contractors labor, materials, direct and indirect cost, overhead and profit; subcontractor costs
(including evidence of subcontractor competition; breakdown of ALL material costs, labor costs, etc.).
Failure to provide supporting documentation may result in exclusion from further consideration.