Material_Submittal_Checklist_Upgrade_Electrical_Serv_to_Bldg__331.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Joint Base McGuire-Dix-Lakehurst Electrical Service IDIQ MATOC Federal contract opportunity
- Solicitation number
- FA4484-13-R-0005
About this file
Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittal Checklist SCHEDULE OF MATERIAL SUBMITTALS IWIMS# 30374-Upgrade Electrical Service To Building #331 SOLICITATION/CONTRACT NUMBER
FA4484-13-R-0005
| TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required) | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN
CONTRACTING DATE TO
CIVIL
ENGINEERS RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
| NOTIFIED | CONTRACTOR | |||||||
| RESUBMITTAL | FINAL | |||||||
| APPROVAL | REMARKS | |||||||
| APPROVED | DISAPPROVED | |||||||
| 1 | 480 volt 125 amp 3 pole GE circuit breaker Type THKM | x | x | x | 15 day after AWD |
2 112.5 kva 480/208/120 volt 3 phase NEMA 3R step down transformer x x x 15 day after AWD
3 250 volt 400 amp 3 pole NEMA 3R fusible safety switch x x x 15 day after AWD
4 250 volt 300 amp time delay fuses x x x 15 day after AWD
5 300 MCM gauge black THHN stranded copper cable x x x 15 day after AWD
6 300 MCM gauge white THHN stranded copper cable x x x 15 days after AWD or C/O PKG
7 #1 gauge THHN black stranded x x x 15 days after AWD or C/O PKG
8 #2 gauge THHN green stranded copper cable x x x 15 day after AWD
9 #6 gauge THHN green copper cable 15 days after AWD or C/O PKG
SCHEDULE OF MATERIAL SUBMITTALS SOLICITATION/CONTRACT NUMBER
FA4484-13-R-0005
| TO BE COMPLETED BY THE PROJECT ENGINEER (Fill in the numbers of each submittal required) | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |
| LINE NUMBER | ITEM OR DESCRIPTION |
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL CERTIFICATIONS OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION MANUFACTURES RECOMMENDATIONS MANUFACTURES WARRANTY CATALOG DATA OPERATING INSTRUCTIONS SPECIFICATIONS STYLE/DESIGN REQUIRED
SUB-
MISSION
DATE DATE
RECEIVED
IN
CONTRACTING DATE TO
CIVIL
ENGINEERS RETURN
SUSPENSE
DATE FOLLOW-UP DATE
CONTRACTOR
| NOTIFIED | CONTRACTOR | |||||||
| RESUBMITTAL | FINAL | |||||||
| APPROVAL | REMARKS | |||||||
| APPROVED | DISAPPROVED | |||||||
| 10 | 1-1/2" schedule 40 PVC conduit | x | x | x | 15 day after AWD |
11 3" EMT conduit x x x 15 day after AWD
12 1-1/2" EMT conduit x x x 15 day after AWD
13 15 day after AWD
14 15 day after AWD
15 day after AWD
15 day after AWD
15 day after AWD
15 day after AWD