This is a Requests for Information (RFI) document addressing technical questions submitted by potential offerors for the 352 Special Warfare Training Squadron (SWTS) Base Camp Upgrade solicitation FA445226R0007. The RFI contains two questions with corresponding government responses.
The first question concerns the electrical specifications for a new 30KW GFCI generator, specifically addressing a discrepancy between the generator's available configurations (120/240v 1-Phase or 120/208v 3-Phase) and the existing building infrastructure that is configured for 1-Phase operation. The government confirmed that single phase is preferred and requested that the electrician make a recommendation regarding which 30KW generator model to procure. The second question requests a proposal due date extension to Monday, March 30, 2026, at 2:00 PM Eastern Time, which the government approved. This is a sole source direct 8(a) construction effort awarded to Unami, LLC under the Department of the Air Force Air Mobility Command. Amendment 4 to the solicitation extended the deadline to March 30, 2026, and incorporated answers to questions received and amendments to the RFP Letter.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 352 Special Warfare Training Squadron (SWTS) Base Camp Upgrade
FA445226R0007
Unami - Requests for Information
| NO. | ISSUE / COMMENT | ||
| QUESTION | GOVERNMENT RESPONSE | ||
| 1 | The specifications provided for the new GFCI generator has options for 120/240v 1-Phase and 120/208v 3-Phase. The existing manual transfer switch, electrical panel, and feeder wire from the transfer switch to the electrical panel are configured for 1-Phase. The DRASH generator is 120/208v 3-Phase but appears to be connected to the transfer switch in a 1-phase configuration. Please confirm the new GFCI generator will be 120/240v 1-Phase to work with the building’s existing configuration. | Single phase is preferred. Please have electrician make a recommendation as to the 30KW generator model to procure. | |
| 2 | Will the Government grant a proposal due date extension to Monday, March 30, 2026, at 2:00 PM Eastern Time? | Yes |