This document is a set of architectural construction plans for the Combat Control School Base Camp Covered Shelter renovation project. The plans include floor layouts for a two-story structure with detailed demolition and construction specifications across multiple pages and elevation views.
The project involves significant structural modifications including: demolition of existing plywood siding, asphalt shingles, roof trusses, and antenna platform over Room 104; construction of a new second floor (Room 204) over the existing Operations Center; installation of new gable sheathing, siding, and trims; and creation of new covered deck enclosures using screening between columns. Key interior spaces include a medical area, ready room, storage, operations center, men's and women's bunk rooms with single occupancy bunk beds (top bunks designated for storage), and covered porches. Construction details specify 3.5-inch wood studs at 16-inch on-center spacing with OSB sheathing and R-13 batt insulation, new thermally broken insulated aluminum windows, asphalt fiberglass shingles with ridge venting, new non-insulated interior doors, wood charging station shelves at 5 feet AFF, 2-foot by 2-foot by 4-foot wood cubbies for storage, and provisions for a roof hatch and widow's walk platform for radio antenna servicing. The plans include wall type legends, general demolition notes, key notes for specific installations, and elevation views from all four cardinal directions showing window and door placement, exterior modifications, and material replacements.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6'-11" 12'-4" 9'-0" 9'-0" 6'-9" 8'-0"
52'-0"
4' -1
6'
-1 1"
6' -1
1" 4'
-1
4' -6
9'
-2
9' -2
4'
-6
5'-3" 7'-9" 7'-9" 5'-3"
26'-0"
'-4
'-0
7' -3
7'
-6
7' -3
12'-0"
'-0
6'-11" 12'-4" 9'-0" 9'-0" 6'-9"
44'-0"
4' -1
'-1 0"
4' -1
'-0
MEDICAL
COVERED
DECK
7 10
READY RM
MEDICAL
STORAGE
COVERED
PORCH
OPS CENTER
COVERED
DECK
MEN'S
BUNK ROOM
COVERED
DECK
SLOPE SLOPE
MEN'S
BUNK ROOM
WOMEN'S
BUNK ROOM 5
'-0
'-0
'-0
15'-0" 15'-0" 15'-0" 15'-0"
30'-0" 30'-0"
EXISTING
OPEN AIR SHELTER
NEW
OPEN AIR SHELTER
KEY NOTES
WALL TYPE LEGEND
1 3-1/2" WOOD STUDS @ 16" O.C. w/ ONE LAYER 1/2" OSB EACH SIDE. R-13
BATT INSULATION WITH VAPOR RETARDER BETWEEN STUDS. HOUSE
WRAP VAPOR RETARDER OVER EXTERIOR OSB. INSTALL NEW SIDING
AND TRIMS. PAINT EXTERIOR TO MATCH BASE COLORWAY.
2 3-1/2" WOOD STUDS @ 16" O.C. w/ ONE LAYER 1/2" OSB EACH SIDE
EXTEND TO BOTTOM OF FLOOR AND/OR ROOF FRAMING. TYPICAL
UNLESS NOTED.
WOOD SHELVES AT 5' AFF FOR CHARGING STATIONS
2'D X 3'W X 3'H COUNTER SPACE FOR SMALL APPLIANCES WITH 1'D X 3'W
X 3'T UPPER SHELVES FOR STORAGE
INSTALL NEW NON-INSULATED DOOR IN INTERIOR WALL.
EXISTING WOOD STAIRS TO SECOND FLOOR.
SINGLE OCCUPANCY BUNK BEDS, TOP BUNK TO BE USED AS STORAGE.
CONSTRUCT NEW 2' X 2' X 4' WOOD CUBBIES.
EXISTING VERTICAL LADDER ON SECOND FLOOR AND ROOF HATCH
30X54 - TO ACCESS WIDOW'S WALK PLATFORM ON ROOF FOR SERVICING
OF RADIO ANTENNA.
LEGEND
ROOM NAME
1. DEMOLISH AND DISPOSE OF EXISTING PLYWOOD SIDING AND TRIMS.
2. DEMOLISH AND DISPOSE OF EXISTING ASPHALT SHINGLES,
UNDERLAYMENT, AND SHEATHING OVER RM 104.
3. REMOVE EXISTING WOOD TRUSSES OVER RM 104 AND SAVE FOR REUSE.
4. DEMOLISH AND DISPOSE OF EXISTING ANTENNA PLATFORM.
5. REMOVE EXISTING ROOF HATCH AND SAVE FOR REUSE.
COMBAT CONTROL SCHOOL BASE CAMP
COVERED SHELTER
INSTALL NEW GABLE SHEATING.
INSTALL SCREEN BETWEEN COLUMNS TO ENCLOSE 105 COVERED DECK
AND 202 COVERED PORCH.
INSTALL NEW INSTRUCTOR PODIUM TO MATCH EXISTING BENCHES.
COMBAT CONTROL SCHOOL BASE CAMP
COVERED SHELTER
ROOM NAME
ROOM NUMBER
DOOR TAG
# WALL TAG
1. REMOVE AND DISPOSE OF EXISTING GABLE SHEATHING AND
INSTRUCTOR'S PODIUM.
GENERAL DEMOLITION NOTES
GENERAL NOTES
1. CONSTRUCT NEW SECOND FLOOR RM 204 OVER EXISTING RM 104.
2. REUSE WOOD TRUSSES AT RM 204 AND TIE INTO EXISTING 2ND FLOOR
ROOF STRUCTURE.
3. INSTALL NEW SIDING AND TRIMS.
COMBAT CONTROL SCHOOL BASE CAMP
65" TVS
REFRIGERATOR AND MICROWAVE
COVERED SHELTER
1. INSTALL NEW GABLE SHEATHING AND INSTRUCTOR'S PODIUM.
9' -8
9' -8
9' -8
9' -8
- 1
1' -0
- 1 1'
-0
- 1
1' -0
- 1 1'
-0
ELEVATION KEY NOTES
COVER PLYWOOD ROOF DECKING WITH 30 LB BUILDING PAPER AND 240
LB, 3 TAB ASPHALT COATED FIBERGLASS SHINGLES WITH MANUFACTURED
CONTINUOUS SHINGLE COVERED RIDGE VENT. PROVIDE R-19 BATT
INSULATION WITH VAPOR RETARDER ABOVE THE SECOND FLOOR CEILING
LEVEL.
INSTALL NEW THERMALLY BROKEN INSULATED ALUMINUM WINDOWS.
WINDOWS DO NOT HAVE TO MEET ATFP STANDARDS. PROVIDE WOOD
STOOLS.
INSTALL SCREEN BETWEEN COLUMNS TO ENCLOSE COVER DECK AND 2ND
FLOOR COVERED PORCH.
REINSTALL FALLEN BATT INSULATION IN CRAWL SPACE.
SCALE: 1/8" = 1'-0"8 SOUTH ELEVATION
SCALE: 1/8" = 1'-0"7 EAST ELEVATION
SCALE: 1/8" = 1'-0"6 WEST ELEVATION
SCALE: 1/8" = 1'-0"5 NORTH ELEVATION
WIDOW'S WALK PLATFORM ON ROOF FOR SERVICING OF RADIO ANTENNA.
GRAPHIC SCALE
1/8" = 1'-0"
8'4'0 16'
SCALE: 1/8" = 1'-0"3 ELEVATION
SCALE: 1/8" = 1'-0"1 ELEVATION
SCALE: 1/8" = 1'-0"4 ELEVATION
SCALE: 1/8" = 1'-0"2 ELEVATION
REPLACE GABLE SHEATHING.
REPLACE INSTRUCTORS PODIUM.
COMBAT CONTROL CENTER BASE CAMP
COVERED SHELTER
REPLACE EXISTING PLYWOOD SHEET SIDING WITH WEATHER RESISTANT
SIDING.3
ROOF HATCH ACCESS - ACTIVAR CPG RHGI-2 30X54.9