This document is a set of architectural construction plans for the Combat Control School Base Camp Covered Shelter renovation project. The plans include floor layouts for a two-story structure with detailed demolition and construction specifications across multiple pages and elevation views.

The project involves significant structural modifications including: demolition of existing plywood siding, asphalt shingles, roof trusses, and antenna platform over Room 104; construction of a new second floor (Room 204) over the existing Operations Center; installation of new gable sheathing, siding, and trims; and creation of new covered deck enclosures using screening between columns. Key interior spaces include a medical area, ready room, storage, operations center, men's and women's bunk rooms with single occupancy bunk beds (top bunks designated for storage), and covered porches. Construction details specify 3.5-inch wood studs at 16-inch on-center spacing with OSB sheathing and R-13 batt insulation, new thermally broken insulated aluminum windows, asphalt fiberglass shingles with ridge venting, new non-insulated interior doors, wood charging station shelves at 5 feet AFF, 2-foot by 2-foot by 4-foot wood cubbies for storage, and provisions for a roof hatch and widow's walk platform for radio antenna servicing. The plans include wall type legends, general demolition notes, key notes for specific installations, and elevation views from all four cardinal directions showing window and door placement, exterior modifications, and material replacements.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6'-11" 12'-4" 9'-0" 9'-0" 6'-9" 8'-0"

52'-0"

4' -1

6'

-1 1"

6' -1

1" 4'

-1

4' -6

9'

-2

9' -2

4'

-6

5'-3" 7'-9" 7'-9" 5'-3"

26'-0"

'-4

'-0

7' -3

7'

-6

7' -3

12'-0"

'-0

6'-11" 12'-4" 9'-0" 9'-0" 6'-9"

44'-0"

4' -1

'-1 0"

4' -1

'-0

MEDICAL

COVERED

DECK

7 10

READY RM

MEDICAL

STORAGE

COVERED

PORCH

OPS CENTER

COVERED

DECK

MEN'S

BUNK ROOM

COVERED

DECK

SLOPE SLOPE

MEN'S

BUNK ROOM

WOMEN'S

BUNK ROOM 5

'-0

'-0

'-0

15'-0" 15'-0" 15'-0" 15'-0"

30'-0" 30'-0"

EXISTING

OPEN AIR SHELTER

NEW

OPEN AIR SHELTER

KEY NOTES

WALL TYPE LEGEND

1 3-1/2" WOOD STUDS @ 16" O.C. w/ ONE LAYER 1/2" OSB EACH SIDE. R-13

BATT INSULATION WITH VAPOR RETARDER BETWEEN STUDS. HOUSE

WRAP VAPOR RETARDER OVER EXTERIOR OSB. INSTALL NEW SIDING

AND TRIMS. PAINT EXTERIOR TO MATCH BASE COLORWAY.

2 3-1/2" WOOD STUDS @ 16" O.C. w/ ONE LAYER 1/2" OSB EACH SIDE

EXTEND TO BOTTOM OF FLOOR AND/OR ROOF FRAMING. TYPICAL

UNLESS NOTED.

WOOD SHELVES AT 5' AFF FOR CHARGING STATIONS

2'D X 3'W X 3'H COUNTER SPACE FOR SMALL APPLIANCES WITH 1'D X 3'W

X 3'T UPPER SHELVES FOR STORAGE

INSTALL NEW NON-INSULATED DOOR IN INTERIOR WALL.

EXISTING WOOD STAIRS TO SECOND FLOOR.

SINGLE OCCUPANCY BUNK BEDS, TOP BUNK TO BE USED AS STORAGE.

CONSTRUCT NEW 2' X 2' X 4' WOOD CUBBIES.

EXISTING VERTICAL LADDER ON SECOND FLOOR AND ROOF HATCH

30X54 - TO ACCESS WIDOW'S WALK PLATFORM ON ROOF FOR SERVICING

OF RADIO ANTENNA.

LEGEND

ROOM NAME

1. DEMOLISH AND DISPOSE OF EXISTING PLYWOOD SIDING AND TRIMS.

2. DEMOLISH AND DISPOSE OF EXISTING ASPHALT SHINGLES,

UNDERLAYMENT, AND SHEATHING OVER RM 104.

3. REMOVE EXISTING WOOD TRUSSES OVER RM 104 AND SAVE FOR REUSE.

4. DEMOLISH AND DISPOSE OF EXISTING ANTENNA PLATFORM.

5. REMOVE EXISTING ROOF HATCH AND SAVE FOR REUSE.

COMBAT CONTROL SCHOOL BASE CAMP

COVERED SHELTER

INSTALL NEW GABLE SHEATING.

INSTALL SCREEN BETWEEN COLUMNS TO ENCLOSE 105 COVERED DECK

AND 202 COVERED PORCH.

INSTALL NEW INSTRUCTOR PODIUM TO MATCH EXISTING BENCHES.

COMBAT CONTROL SCHOOL BASE CAMP

COVERED SHELTER

ROOM NAME

ROOM NUMBER

DOOR TAG

# WALL TAG

1. REMOVE AND DISPOSE OF EXISTING GABLE SHEATHING AND

INSTRUCTOR'S PODIUM.

GENERAL DEMOLITION NOTES

GENERAL NOTES

1. CONSTRUCT NEW SECOND FLOOR RM 204 OVER EXISTING RM 104.

2. REUSE WOOD TRUSSES AT RM 204 AND TIE INTO EXISTING 2ND FLOOR

ROOF STRUCTURE.

3. INSTALL NEW SIDING AND TRIMS.

COMBAT CONTROL SCHOOL BASE CAMP

65" TVS

REFRIGERATOR AND MICROWAVE

COVERED SHELTER

1. INSTALL NEW GABLE SHEATHING AND INSTRUCTOR'S PODIUM.

9' -8

9' -8

9' -8

9' -8

- 1

1' -0

- 1 1'

-0

- 1

1' -0

- 1 1'

-0

ELEVATION KEY NOTES

COVER PLYWOOD ROOF DECKING WITH 30 LB BUILDING PAPER AND 240

LB, 3 TAB ASPHALT COATED FIBERGLASS SHINGLES WITH MANUFACTURED

CONTINUOUS SHINGLE COVERED RIDGE VENT. PROVIDE R-19 BATT

INSULATION WITH VAPOR RETARDER ABOVE THE SECOND FLOOR CEILING

LEVEL.

INSTALL NEW THERMALLY BROKEN INSULATED ALUMINUM WINDOWS.

WINDOWS DO NOT HAVE TO MEET ATFP STANDARDS. PROVIDE WOOD

STOOLS.

INSTALL SCREEN BETWEEN COLUMNS TO ENCLOSE COVER DECK AND 2ND

FLOOR COVERED PORCH.

REINSTALL FALLEN BATT INSULATION IN CRAWL SPACE.

SCALE: 1/8" = 1'-0"8 SOUTH ELEVATION

SCALE: 1/8" = 1'-0"7 EAST ELEVATION

SCALE: 1/8" = 1'-0"6 WEST ELEVATION

SCALE: 1/8" = 1'-0"5 NORTH ELEVATION

WIDOW'S WALK PLATFORM ON ROOF FOR SERVICING OF RADIO ANTENNA.

GRAPHIC SCALE

1/8" = 1'-0"

8'4'0 16'

SCALE: 1/8" = 1'-0"3 ELEVATION

SCALE: 1/8" = 1'-0"1 ELEVATION

SCALE: 1/8" = 1'-0"4 ELEVATION

SCALE: 1/8" = 1'-0"2 ELEVATION

REPLACE GABLE SHEATHING.

REPLACE INSTRUCTORS PODIUM.

COMBAT CONTROL CENTER BASE CAMP

COVERED SHELTER

REPLACE EXISTING PLYWOOD SHEET SIDING WITH WEATHER RESISTANT

SIDING.3

ROOF HATCH ACCESS - ACTIVAR CPG RHGI-2 30X54.9