Attachment 3_Base Camp_Price Proposal_Amendment 4.pdf
PDF 116 KB Posted
- Solicitation number
- FA445226R0007
About this file
This is a Volume III Price Proposal template for RFP FA445226R0007, Attachment 3, which serves as the pricing submission format for this Air Force solicitation.
The price proposal requires contractors to submit costs for two Contract Line Items (CLINs): CLIN 0001 is the base project for Building T-2770 Base Camp Upgrade, and CLIN 0002 is an optional task for Building T-2770 Base Camp Covered Parking. Both CLINs are priced on a job basis and require contractors to provide all labor, equipment, and material necessary to complete the work as identified in the Statement of Work. Contractors must submit a Base Project Total (rounded to the nearest dollar) representing the combined cost of CLIN 0001 and CLIN 0002. The template also includes provisions for alternative, additive, or betterment proposals, with each alternative priced as a lot and a final total line combining the Base Project Total and All Proposed Alternates. All pricing must be rounded to the nearest dollar and must reference Section E of the RFP Letter for evaluation information regarding alternatives.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Volume III, Price Proposal
RFP FA445226R0007
Attachment 3
CLIN DESCRIPTION
UNIT
OF
ISSUE
AMOUNT
The contractor shall provide all labor, equipment, and material necessary to complete the work as identified in the Statement of Work for the Building T-2770 Base Camp Upgrade
Job
Optional
The contractor shall provide all labor, equipment, and material necessary to complete the work as identified in the Statement of Work for the Building T-2770 Base Camp Covered
Parking.
Job
Base Project Total $ Round to nearest dollar
Alt.
Alternatives (Refer to Alternatives under Section E –
Evaluation Information in the RFP Letter.)
Lot $________________
(Insert a line for each Proposed Additive, Alternate, or Betterment)
Base Project Total and All Proposed Alternates Total $________________ Round to nearest dollar
Volume III, Price Proposal
File details come from the government source that posted it. Updated .