Tree Locations Part 2 BASH 9.12.25.pdf

PDF 1 MB Posted

Attached to
PKA - Tree Maintenance at Travis AFB
Solicitation number
FA442725Q1151
Issued by

About this file

This document is a series of tree removal project specifications for a military installation, focused on reducing bird strike risks across multiple areas. Projects 35-38 involve removing trees of varying sizes (small to large) located near critical infrastructure such as buildings, training ranges, gates, and a wastewater treatment plant. Each project is designated as high or highest priority, with consistent instructions to contact a Point of Contact (POC) at least 72 hours prior to work and to perform no stump grinding. Project 38 has a unique requirement involving a Golden Eagle nest, mandating that a tribe member must witness the nest removal and collect feathers. The locations span Area 2 and Area 6, with tree removal aimed at minimizing potential aviation hazards by eliminating perching and nesting sites for birds near operational areas.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT 35/AREA 2

• Location: Near bldg. 1212

• Task: Remove

• Size: 4 Medium

• Reason: Reduce Bird Strike

• Priority: High

• Notes: No stump grinding

PROJECT 36/ AREA 2

• Location: Behind CATM range B1372

• Task: Remove

• Size: 2 medium, 1 small

• Reason: Reduce Bird Strike

• Priority: High

• Notes: No Stump Grinding

• NOTE: Contact POC for access at least 72-hours prior to work

PROJECT 36/ Aera 2

• Task: Remove

• Size: 3 Medium

• Reason: Reduce Bird Strike

• Priority: High

• Notes: No stump grinding

•NOTE: Contact POC for access at least 72-hours prior to work

PROJECT 36 / AREA 2

• TASK: Remove

• Size: 4 large, 1 small

• Reason: Reduce Bird Strike

• Priority: Highest

• Notes: No stump grinding

• NOTE: Contact POC for access at least

72-hours prior to work

PROJECT 37 / Area 6

• Location: Adjacent to South (Truck) Gate

• Task: Remove

• Size: 3 Large, 1 medium

• Reason: Reduce Bird Strike

• Priority: High

• Notes: No stump grinding

PROJECT 38 / Area 6

• Location: Old Wastewater Treatment Plant Near EOD Training

• Size: 1 large with Golden Eagle Nest

• Reason: Reduce Bird Strike

• Priority: Highest

• Notes: Cut down only and leave in place. A tribe member must witness removal of nest and will collect feathers

• NOTE: Contact POC for at least 72-hours prior to work

Slide 1: PROJECT 35/AREA 2
Slide 2: PROJECT 36/ AREA 2
Slide 3: PROJECT 36/ Aera 2
Slide 4: PROJECT 36 / AREA 2
Slide 5: PROJECT 37 / Area 6
Slide 6: PROJECT 38 / Area 6

File details come from the government source that posted it. Updated .