This document contains a Request for Information (RFI) regarding a federal construction contract to remove paint from beams at Travis Air Force Base in California. The RFI seeks clarification on whether the contractor is required to remove just flaking paint or all paint down to the bare wood. After detailed review, the recommended solution is for all paint to be removed down to the wood.
A related federal contract opportunity involves multiple award construction contracts for handyman services at Travis AFB. The Government intends to award a minimum of three contracts to perform projects in accordance with the contract Statement of Work, Technical Specifications, and individual task orders. Offerors should conform to solicitation FA442720R0002 for further details on submitting proposals to the Department of the Air Force Air Mobility Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach 9 - RFI QA Combined - B931.docx | DOCX document | |
| Solicitation Amendment FA442720R00020002 SF 30.pdf | ||
| Attach 7 - Travis bldg 931 report ltd lead Survey 9 January 2020.pdf | ||
| Attach 3 - Bldg 931 Insulation Foam Statement of Need dated 15 Jan 20.pdf | ||
| Solicitation Amendment - FA442720R00020002.pdf | ||
| Attach 8 - Bldg 931 Asbuilts.pdf | ||
| Solicitation Amendment FA442720R00020001 SF 30.pdf | ||
| Attach 6 - SCA Wage Determination 2015-5656 Rev. 14 dated 6 December 2019.pdf | ||
| Attach 3 - Bldg. 931 Insulation Foam Statement of Need.pdf | ||
| Attach 2 - Past Performance Questionnaire.pdf | ||
| Attach 5 - Contract Security Clause 29 Apr 19.docx | DOCX document | |
| Attach 4 - Davis Bacon Wage Determination CA20190019 dated 6 December 2019.pdf | ||
| Attach 1 - SOW Handyman dated 23 September 2019.docx | DOCX document | |
| Solicitation - FA442720R0002.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION DATE
Jan 27, 2020TBD
ACTIVITY ID
HANDYMAN BLDG 931 POWER PRODUCTION SHOP
CONTRACT TITLECONTRACT NO RFI NO
RFI SUBJECT SPEC SECTION DWG NO
SPEC PARAGRAPH DWG DETAIL
SPEC PAGE NO DWG SHEET NO
RFI PRIORITY?
POTENTIAL TIME/COST?
SCHEDULE REFERENCED?
CRITICAL PATH?
NORMALHIGH
YES NO
NOYES
NOYES
CONTRACTOR QUESTION AND PROPOSED SOLUTION
RFI QUESTION/ISSUE:
"Contractor is responsible for removing paint from the beams". Does this mean the Government requires just the flaking paint to be removed, or all paint removed down to bare wood?
CONTRACTOR PROPOSED SOLUTION:
DATECONTRACTOR/PROJECT MANAGER
NOTE: If the determination of this RFI is "Answered - No Cost" then this reply is given with the expressed understanding that it does not constitute a basis for any change in the amount or time of subject contract. Information provided in this response does not authorize work not currently included in the contract. If determination of this RFI is "Answered - Pending PCO" then this response may require a change to the contract.
ANSWERS AND COMMENTS
RFI REASON CODE
RFI ACTION
COMMENTS FOR DETAILED REVIEWER:
DETAILED REVIEWER 1 RECOMMENDED RFI SOLUTION:
All paint will be removed down to the wood.
DETAILED REVIEWER 1 NAME/SIGNATURE TITLE
Jan 28, 2020OIC Requirements & Optimization
RESPONSE DATE
DETAILED REVIEWER 2 RECOMMENDED RFI SOLUTION:
DETAILED REVIEWER 2 NAME/SIGNATURE TITLE RESPONSE DATE
RFI RESPONSE:
DATEGOVERNMENT CONSTRUCTION MANAGER
REQUEST FOR INFORMATION
DATE
ACTIVITY ID
CONTRACT TITLE
CONTRACT NO
RFI NO
RFI SUBJECT
SPEC SECTION
DWG NO
SPEC PARAGRAPH
DWG DETAIL
SPEC PAGE NO
DWG SHEET NO
RFI PRIORITY?
POTENTIAL TIME/COST?
SCHEDULE REFERENCED?
CRITICAL PATH?
CONTRACTOR QUESTION AND PROPOSED SOLUTION
RFI QUESTION/ISSUE:
CONTRACTOR PROPOSED SOLUTION:
DATE
CONTRACTOR/PROJECT MANAGER
NOTE: If the determination of this RFI is "Answered - No Cost" then this reply is given with the expressed understanding that it does not constitute a basis for any change in the amount or time of subject contract. Information provided in this response does not authorize work not currently included in the contract. If determination of this RFI is "Answered - Pending PCO" then this response may require a change to the contract.
ANSWERS AND COMMENTS
RFI REASON CODE
RFI ACTION
COMMENTS FOR DETAILED REVIEWER:
DETAILED REVIEWER 1 RECOMMENDED RFI SOLUTION:
DETAILED REVIEWER 1 NAME/SIGNATURE
TITLE
RESPONSE DATE
DETAILED REVIEWER 2 RECOMMENDED RFI SOLUTION:
DETAILED REVIEWER 2 NAME/SIGNATURE
TITLE
RESPONSE DATE
RFI RESPONSE:
DATE
GOVERNMENT CONSTRUCTION MANAGER
8.2.1.3158.1.475346.466429
| Date of RFI.: 2020-01-27 |
| Critical Path Schedule Activity Number that pertains to this RFI.: TBD |
| Contract Title.: HANDYMAN BLDG 931 POWER PRODUCTION SHOP |
| Contract Number and Task Order (TO) Number, if any.: |
| Shall be sequential to previous RFI.: 002 |
| RFI Subject.: |
| Specifications Section that pertains to this RFI.: |
| Drawing number that pertains to this RFI.: |
| Specifications paragraph that pertains to this RFI.: |
| Drawing Detail that pertains to this RFI.: |
| Specifications Page Number that pertains to this RFI.: |
| Drawing Sheet Number that pertains to this RFI.: |
| : |
| Government Final Response for this RFI.: "Contractor is responsible for removing paint from the beams". Does this mean the Government requires just the flaking paint to be removed, or all paint removed down to bare wood? |
| Government Final Response for this RFI.: All paint will be removed down to the wood. |
| Contractor/Project Manager Signature.: |
| Date signed.: 2020-01-28 |
| To be filled by Government Construction Manager.: |
| To be filled by Government Construction Manager.: |
| Detailed Reviewer 1 Signature.: |
| Reviewer 2 position/title.: OIC Requirements & Optimization |
| Detailed Reviewer 2 Signature.: |
| Government Construction Manager Signature.: |
File details come from the government source that posted it. Updated .