Attach 3 - Bldg. 931 Insulation Foam Statement of Need.pdf

PDF 33 KB Posted

Attached to
Travis AFB Handy Man Multiple Award Construction Contract Federal contract opportunity
Solicitation number
FA442720R0002
Issued by
Department of the Air Force Air Mobility Command

About this file

This document includes a Statement of Need and details of a related federal contract opportunity. The Statement of Need is for the installation of 1,536 square feet of 10-inch R-38 thermal coating open cell spray foam at Building 931 at Travis Air Force Base in California. The work must be performed between 7:00 AM and 4:00 PM Monday through Friday and comply with all applicable construction and safety standards.

The related federal contract opportunity is solicitation number FA442720R0002 for handyman services at Travis Air Force Base. The government intends to award a minimum of three contracts for labor, materials, equipment and supervision to perform handyman service projects in accordance with the contract Statement of Work and Technical Specifications. Offerors must submit proposals by the specified due date, and awards will be made to responsible offerors providing the most advantageous offers to the government. The soliciting agency is the Department of the Air Force Air Mobility Command.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT: Handyman Contract/ Statement of Need (SON)

1. GENERAL SCOPE

a. The work covered by this contract will include, but is not limited to, the installation of 1,536 square feet of 10” R-38 thermal coating open cell spray foam. This work will occur at Building 931 at Travis AFB, CA

b. The contractor shall furnish all supervision, labor, tools, equipment, materials, operations and incidentals as required to install new thermal coating. Work shall be accomplished in accordance with the contract documents

c. All work shall be accomplished between the hours of 0700-1600, Monday-Friday.

d. All contractor vehicles must enter the base via the South Gate and shall be subject to inspection.

All contractor personnel must obtain base passes or be listed on the Entry Access List (EAL) throughout duration of work performance.

2. WORK ITEMS

a. The contractor shall comply with all applicable NEC, Federal, State construction standards.

Current Air Force Occupational Safety and Health (AFOSH) standards also apply.

Contractor shall be in compliance in accordance with all NFPA, AFI, UFC and ETL standards for fire safety.

All waste materials not mentioned above will be disposed of and removed off base by Contractor. Contractor will practice good housekeeping during project.

File details come from the government source that posted it. Updated .