Attach 4 - Davis Bacon Wage Determination CA20190019 dated 6 December 2019.pdf
PDF 259 KB Posted
- Attached to
- Travis AFB Handy Man Multiple Award Construction Contract Federal contract opportunity
- Solicitation number
- FA442720R0002
About this file
This is a solicitation for a multiple award construction contract to provide handyman services at Travis Air Force Base in California. The government intends to award a minimum of three contracts to provide labor, materials, equipment, transportation and supervision for handyman projects in accordance with the contract Statement of Work and individual task order specifications. Offerors should submit proposals in accordance with the instructions and terms provided in the attached SF 1442 form. The Department of the Air Force Air Mobility Command is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 004 - Flaking Paint-signed.pdf | ||
| Attach 9 - RFI QA Combined - B931.docx | DOCX document | |
| Attach 8 - Bldg 931 Asbuilts.pdf | ||
| Solicitation Amendment - FA442720R00020002.pdf | ||
| Solicitation Amendment FA442720R00020002 SF 30.pdf | ||
| Attach 7 - Travis bldg 931 report ltd lead Survey 9 January 2020.pdf | ||
| Attach 3 - Bldg 931 Insulation Foam Statement of Need dated 15 Jan 20.pdf | ||
| Solicitation Amendment FA442720R00020001 SF 30.pdf | ||
| Attach 6 - SCA Wage Determination 2015-5656 Rev. 14 dated 6 December 2019.pdf | ||
| Attach 1 - SOW Handyman dated 23 September 2019.docx | DOCX document | |
| Solicitation - FA442720R0002.pdf | ||
| Attach 2 - Past Performance Questionnaire.pdf | ||
| Attach 5 - Contract Security Clause 29 Apr 19.docx | DOCX document | |
| Attach 3 - Bldg. 931 Insulation Foam Statement of Need.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12/6/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190019/9/document 1/76
"General Decision Number: CA20190019 12/06/2019
Superseded General Decision Number: CA20180030
State: California
Construction Type: Residential
Counties: Alameda, Contra Costa, El Dorado, Marin, Monterey, Napa, Placer, Sacramento, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano, Sonoma, Sutter, Yolo and Yuba
Counties in California.
RESIDENTIAL CONSTRUCTION PROJECTS (including single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act https://beta.sam.gov/wage-determination/CA20190019/9/document 2/76 itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
1 02/01/2019
2 02/22/2019
3 05/03/2019
4 07/26/2019
5 11/08/2019
6 11/15/2019
7 11/22/2019
8 11/29/2019
9 12/06/2019
ASBE0016-002 08/01/2019
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN
MATEO & SANTA CLARA COUNTIES
AREA 2: EL DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO,
SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, & YUBA COUNTIES
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Area 1......................$ 71.16 23.39
Area 2......................$ 54.26 23.30
ASBE0016-009 01/01/2019
https://beta.sam.gov/wage-determination/CA20190019/9/document 3/76
AREA 1: EL DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO,
SANTA CRUZ, SOLANO, SANOMA, SUTTER, YOLO & YUBA COUNTIES
AREA 2: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN
MATEO & SANTA CLARA COUNTIES
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Area 1......................$ 28.20 9.27
Area 2......................$ 36.53 9.27
BRCA0003-001 08/01/2019
Rates Fringes
MARBLE FINISHER..................$ 35.41 16.45
BRCA0003-002 05/01/2019
Rates Fringes
BRICKLAYER
( 7) Marin, Napa, San
Francisco, San Mateo, Solano, Sonoma..............$ 45.92 26.70
( 8) Alameda, Contra
Costa, San Benito, Santa
Clara.......................$ 47.73 22.59
( 9) El Dorado, Placer, Sacramento, Sutter..........$ 43.24 21.63 https://beta.sam.gov/wage-determination/CA20190019/9/document 4/76
(16) Monterey, Santa Cruz...$ 44.51 24.59
SPECIALTY PAY:
(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.
(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.
(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.
BRCA0003-007 07/01/2019
Rates Fringes
TERRAZZO FINISHER................$ 37.58 17.33
TERRAZZO WORKER..................$ 48.53 26.84
FOOTNOTE: Base machine operator: $1.00 per hour additional.
BRCA0003-009 08/01/2019
Rates Fringes
MARBLE MASON.....................$ 49.42 27.86
BRCA0003-012 04/01/2019
Rates Fringes
TILE FINISHER
Alameda, Contra Costa, Marin, Monterey, Napa, San
Benito, San Francisco, San
Mateo, Santa Clara, Santa
Cruz, Solano................$ 29.94 16.38
El Dorado, Placer, Sacramento, Sutter, Yolo, https://beta.sam.gov/wage-determination/CA20190019/9/document 5/76
Yuba........................$ 27.31 14.75
Sonoma......................$ 28.06 15.82
Tile Layer
Placer, Sacramento, Sutter, Yolo, Yuba..........$ 45.51 17.64
Alameda, Contra Costa, Marin, Monterrey, Napa, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano..........$ 49.90 19.16
Sonoma......................$ 46.77 19.08
CARP0022-001 07/01/2019
San Francisco County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
CARP0035-005 07/01/2016
AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San
Mateo, Santa Clara, Solano & Sonoma Counties
AREA 2: Monterey, San Benito & Santa Cruz Counties
AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & Yuba
Counties
Rates Fringes https://beta.sam.gov/wage-determination/CA20190019/9/document 6/76
Drywall Installers/Lathers:
Area 1......................$ 40.35 28.64
Area 2......................$ 34.47 28.64
Area 4......................$ 33.62 28.64
Drywall Stocker/Scrapper
Area 1......................$ 20.18 16.57
Area 2......................$ 17.24 16.57
Area 4......................$ 16.81 16.57
CARP0035-009 07/01/2018
Marin County
Rates Fringes
CARPENTER
Bridge Builder/Highway
Carpenter...................$ 48.40 29.32
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 48.55 29.32
Journeyman Carpenter........$ 48.40 29.32
Millwright..................$ 48.50 30.91
CARP0046-001 07/01/2019
El Dorado (West), Placer (West), Sacramento and Yolo Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 44.77 30.20 https://beta.sam.gov/wage-determination/CA20190019/9/document 7/76
Journeyman Carpenter........$ 44.62 30.20
Millwright..................$ 47.12 31.79
Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes territory West of and including Highway 49 and territory inside the city limits of Placerville.
CARP0046-003 07/01/2014
El Dorado (East), Placer (East), Sutter and Yuba Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 40.35 27.53
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 33.27 27.53
Journeyman Carpenter........$ 33.12 27.53
Millwright..................$ 35.62 29.12
CARP0152-001 07/01/2019
Contra Costa County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20 https://beta.sam.gov/wage-determination/CA20190019/9/document 8/76
Millwright..................$ 50.60 31.79
CARP0180-001 07/01/2019
Solano County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
CARP0217-001 07/01/2019
San Mateo County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
CARP0405-001 07/01/2019
Santa Clara County https://beta.sam.gov/wage-determination/CA20190019/9/document 9/76
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
CARP0405-002 07/01/2019
San Benito County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 44.68 30.20
Journeyman Carpenter........$ 44.62 30.20
Millwright..................$ 47.12 31.79
CARP0505-001 07/01/2019
Santa Cruz County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold & https://beta.sam.gov/wage-determination/CA20190019/9/document 10/76
Steel Shoring Erector, Saw
Filer.......................$ 44.77 30.20
Journeyman Carpenter........$ 44.62 30.20
Millwright..................$ 47.12 31.79
CARP0605-001 07/01/2019
Monterey County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 44.77 30.20
Journeyman Carpenter........$ 44.62 30.20
Millwright..................$ 47.12 31.79
CARP0713-001 07/01/2019
Alameda County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
CARP0751-001 07/01/2019
https://beta.sam.gov/wage-determination/CA20190019/9/document 11/76
Napa and Sonoma Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer, Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
ELEC0006-003 12/01/2018
SAN FRANCISCO COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 40.52 3%+19.05
Technician..................$ 46.60 3%+19.05
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.
ELEC0006-005 06/01/2019
https://beta.sam.gov/wage-determination/CA20190019/9/document 12/76
SAN FRANCISCO COUNTY
Rates Fringes
ELECTRICIAN......................$ 44.70 3%+17.63
Work on residential wood frame remodel and repair in all wood-constructed buildings not to exceed 24 living units;
and new wood frame single structure 1 or 2 family houses, or on all wood- constructed buildings not to exceed 20 living units under 1 roof excluding projects or tracts containing more than 2 houses, or more than 1 building
ELEC0006-009 06/01/2018
SAN FRANCISCO COUNTY:
Rates Fringes
ELECTRICIAN
All other work..............$ 71.00 3%+31.215
ELEC0180-002 06/01/2016
NAPA & SOLANO COUNTIES
Rates Fringes
ELECTRICIAN......................$ 30.10 13.19
ELEC0234-002 12/24/2018
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES:
Rates Fringes
ELECTRICIAN
Zone A......................$ 49.30 25.58
Zone B......................$ 54.23 25.73 https://beta.sam.gov/wage-determination/CA20190019/9/document 13/76
Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss
Landing, and an area extending 5 miles east and west of
Highway 101 South to the San Luis Obispo County Line
Zone B: Any area outside of Zone A
ELEC0234-004 12/01/2018
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES
Rates Fringes
Sound & Communications
Installer...................$ 40.02 19.75
Technician..................$ 46.02 19.75
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.
ELEC0302-002 01/01/2018
CONTRA COSTA COUNTY
CABLE SPLICER....................$ 56.17 26.59
https://beta.sam.gov/wage-determination/CA20190019/9/document 14/76
ELECTRICIAN......................$ 49.76 26.59
ELEC0302-004 12/01/2018
CONTRA COSTA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 38.42 19.70
Technician..................$ 44.18 19.88
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.
* ELEC0332-002 06/01/2019
SANTA CLARA COUNTY
Rates Fringes
ELECTRICIAN......................$ 35.00 17.62
ELEC0332-004 12/01/2018
SANTA CLARA COUNTY
https://beta.sam.gov/wage-determination/CA20190019/9/document 15/76
Sound & Communications
Installer...................$ 40.02 19.75
Technician..................$ 46.02 19.93
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.
ELEC0340-001 02/01/2016
EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES
Rates Fringes
ELECTRICIAN
Four stories................$ 39.06 24.51
Work on single family homes and apartments up to and including 3 stories.....$ 23.10 12.48
ELEC0340-004 02/01/2018
COLUSA, PLACER, SUTTER, YOLO AND YUBA COUNTIES
Rates Fringes
Sound & Communications
Installer...................$ 29.35 3%+15.35
Technician..................$ 33.75 3%+15.35 https://beta.sam.gov/wage-determination/CA20190019/9/document 16/76
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.
ELEC0401-006 01/01/2019
EL DORADO AND PLACER COUNTIES
Rates Fringes
ELECTRICIAN......................$ 28.45 8.35
ZONE PAY:
Zone 1 - 0 to 70 miles $0.00 Per Hour
Zone 2 - 70 to 90 miles $5.00 Per Hour
Zone 3 - 91 miles and over $7.00 Per Hour
ELEC0551-003 06/01/2017
MARIN AND SONOMA COUNTIES:
Rates Fringes
ELECTRICIAN......................$ 31.00 13.72
ELEC0595-004 06/01/2018
ALAMEDA COUNTY
https://beta.sam.gov/wage-determination/CA20190019/9/document 17/76
Rates Fringes
CABLE SPLICER....................$ 61.03 3%+35.72
ELECTRICIAN......................$ 54.25 3%+35.72
ELEC0595-007 12/01/2018
ALAMEDA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 40.02 3%+18.96
Technician..................$ 46.02 3%+18.96
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.
ELEC0617-002 06/01/2019
SAN MATEO COUNTY
Rates Fringes
ELECTRICIAN......................$ 63.00 37.68
ELEV0008-001 01/01/2019
https://beta.sam.gov/wage-determination/CA20190019/9/document 18/76
ELEVATOR MECHANIC................$ 67.56 34.125+a+b
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after
Thanksgiving, and Christmas Day.
ENGI0003-009 06/26/2017
EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO,
SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES
""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.
SEE AREA DESCRIPTIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1.....................$ 43.25 30.39
GROUP 2.....................$ 41.80 30.39
GROUP 3.....................$ 40.40 30.39
GROUP 4.....................$ 39.07 30.39
GROUP 5.....................$ 37.86 30.39
GROUP 6.....................$ 36.59 30.39
GROUP 7.....................$ 35.50 30.39
GROUP 8.....................$ 34.00 30.39
GROUP 8-A...................$ 32.30 30.39
OPERATOR: Power Equipment
(Cranes and Attachments -
AREA 1:)
https://beta.sam.gov/wage-determination/CA20190019/9/document 19/76
GROUP 1
Cranes.....................$ 44.85 30.39
Oiler......................$ 35.59 30.39
Truck crane oiler..........$ 38.05 30.39
GROUP 2
Cranes.....................$ 42.41 30.39
Oiler......................$ 35.34 30.39
Truck crane oiler..........$ 37.83 30.39
GROUP 3
Cranes.....................$ 40.77 30.39
Hydraulic..................$ 37.20 30.39
Oiler......................$ 35.11 30.39
Truck crane oiler..........$ 37.58 30.39
GROUP 4
Cranes.....................$ 37.86 30.39
FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo
Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Operator of helicopter (when used in erection work);
Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7
cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds.
up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu.
yd. up to and including 7 cu. yds. m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd;
Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4
cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over;
https://beta.sam.gov/wage-determination/CA20190019/9/document 20/76
Wheel excavator (up to and including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom;
Combination backhoe and loader up to and including 3/4 cu. yd.;
Concrete batch plant (wet or dry); Dozer and/or push cat; Pull-type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine;
Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar);
Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading
(paddle-wheels, etc.); Rubber- tired earthmoving equipment
(scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill combination;
Welder; Woods-Mixer (and other similar Pugmill equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site;
Concrete pump or pumpcrete gun; Drilling equipment, Watson
2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist;
Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge
Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist;
Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5 ft. depth;
Vermeer T-600B rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom-type backfilling machine; Assistant plant engineer; Bridge https://beta.sam.gov/wage-determination/CA20190019/9/document 21/76 and/or gantry crane; Chemical grouting machine, truck-mounted;
Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer;
Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed
(except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar;
Combination slurry mixer and/or cleaner; Drilling equipment, 20
ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine
(tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer);
Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader
GROUP 8: Bit sharpener; Boiler tender; Box operator;
Brakeperson; Combination mixer and compressor
(shotcrete/gunite); Compressor operator; Deckhand; Fire tender;
Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar);
Mixermobile; Oiler; Pump operator; Refrigeration plant;
Reservoir-debris tug (self- propelled floating); Ross Carrier https://beta.sam.gov/wage-determination/CA20190019/9/document 22/76
(construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator
(includes vacuum sweeper); Slusher operator; Surface heater;
Switchperson; Tar pot firetender; Tugger hoist, single drum;
Vacuum cooling plant; Welding machine (powered other than by electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper
ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over
100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons
GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including
100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane
GROUP 3: Clamshell and dragline up to and including 1 cu. yd.;
Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under;
GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over
15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons;
AREA DESCRIPTIONS:
POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND
UNDERGROUND [These areas do not apply to Piledrivers and Steel https://beta.sam.gov/wage-determination/CA20190019/9/document 23/76
Erectors]
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN
BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA COUNTIES
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED BELOW:
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern part
PLACER COUNTY:
Area 1: All but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Reaminder https://beta.sam.gov/wage-determination/CA20190019/9/document 24/76
TEHAMA COUNTY:
Area 1: All but the Western border with mendocino & Trinity
Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeaster border with
Shasta County
Area 2: Remainder
TULARE COUNTY;
Area 1: Remainder
Area 2: Eastern part
ENGI0003-010 06/26/2017
ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA
CLARA AND SOLANO COUNTIES
""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.
SEE AREA DESCRIPTIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1.....................$ 43.25 30.39
GROUP 2.....................$ 41.80 30.39
GROUP 3.....................$ 40.40 30.39
GROUP 4.....................$ 39.07 30.39
GROUP 5.....................$ 37.86 30.39
GROUP 6.....................$ 36.59 30.39
GROUP 7.....................$ 35.50 30.39
https://beta.sam.gov/wage-determination/CA20190019/9/document 25/76
GROUP 8.....................$ 34.00 30.39
GROUP 8-A...................$ 32.30 30.39
OPERATOR: Power Equipment
(Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 44.85 28.03
Oiler......................$ 35.59 28.03
Truck crane oiler..........$ 38.05 28.03
GROUP 2
Cranes.....................$ 42.41 28.03
Oiler......................$ 35.34 28.03
Truck crane oiler..........$ 37.83 28.03
GROUP 3
Cranes.....................$ 40.77 28.03
Hydraulic..................$ 37.20 28.03
Oiler......................$ 35.11 28.03
Truck crane oiler..........$ 37.58 28.03
GROUP 4
Cranes.....................$ 37.86 28.03
FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo
Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Operator of helicopter (when used in erection work);
Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7
cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds.
up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu.
yd. up to and including 7 cu. yds. m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd;
https://beta.sam.gov/wage-determination/CA20190019/9/document 26/76
Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4
cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over;
Wheel excavator (up to and including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom;
Combination backhoe and loader up to and including 3/4 cu. yd.;
Concrete batch plant (wet or dry); Dozer and/or push cat; Pull-type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine;
Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar);
Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading
(paddle-wheels, etc.); Rubber- tired earthmoving equipment
(scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill combination;
Welder; Woods-Mixer (and other similar Pugmill equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site;
Concrete pump or pumpcrete gun; Drilling equipment, Watson
2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist;
Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge
Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist;
Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller;
https://beta.sam.gov/wage-determination/CA20190019/9/document 27/76
Trenching machine, maximum digging capacity over 5 ft. depth;
Vermeer T-600B rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom-type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted;
Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer;
Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed
(except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar;
Combination slurry mixer and/or cleaner; Drilling equipment, 20
ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine
(tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer);
Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader
GROUP 8: Bit sharpener; Boiler tender; Box operator;
Brakeperson; Combination mixer and compressor https://beta.sam.gov/wage-determination/CA20190019/9/document 28/76
(shotcrete/gunite); Compressor operator; Deckhand; Fire tender;
Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar);
Mixermobile; Oiler; Pump operator; Refrigeration plant;
Reservoir-debris tug (self- propelled floating); Ross Carrier
(construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator
(includes vacuum sweeper); Slusher operator; Surface heater;
Switchperson; Tar pot firetender; Tugger hoist, single drum;
Vacuum cooling plant; Welding machine (powered other than by electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper
ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over
100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons
GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including
100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane
GROUP 3: Clamshell and dragline up to and including 1 cu. yd.;
Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under;
GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons;
Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons;
https://beta.sam.gov/wage-determination/CA20190019/9/document 29/76
AREA DESCRIPTIONS:
POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND
UNDERGROUND [These areas do not apply to Piledrivers and Steel
Erectors]
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN
BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,
AND YUBA COUNTIES
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED BELOW:
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern part
PLACER COUNTY:
Area 1: All but the Central portion
Area 2: Remainder
ENGI0003-011 07/26/2017
SEE AREA DESCRIPTIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(LANDSCAPE WORK ONLY)
GROUP 1
AREA 1.....................$ 34.05 28.73
AREA 2.....................$ 36.05 28.73
GROUP 2
https://beta.sam.gov/wage-determination/CA20190019/9/document 30/76
AREA 1.....................$ 34.05 28.73
AREA 2.....................$ 32.45 28.73
GROUP 3
AREA 1.....................$ 27.84 28.73
AREA 2.....................$ 27.84 28.73
GROUP DESCRIPTIONS:
GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP.
GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and
Winch Truck, Backhoe, Forklift, Hydragraphic Seeder
Machine, Roller, Rubber-Tired and Track Earthmoving
Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP.
GROUP 3: Landscae Utility Operator: Small Rubber-Tired
Tractor, Trencher Under 31 HP.
AREA DESCRIPTIONS:
AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN
BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,
YOLO, AND YUBA COUNTIES
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED BELOW:
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
MONTEREY COUNTY
Area 1: Remainder https://beta.sam.gov/wage-determination/CA20190019/9/document 31/76
Area 2: Southwestern part
PLACER COUNTY:
Area 1: All but the Central portion
Area 2: Remainder
IRON0433-005 01/01/2019
REMAINING COUNTIES
Rates Fringes
IRONWORKER
Fence Erector...............$ 32.58 23.41
Ornamental, Reinforcing and Structural..............$ 39.00 32.05
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval
Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training
Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine
Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB
$4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps
Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock https://beta.sam.gov/wage-determination/CA20190019/9/document 32/76
LABO0067-004 12/01/2018
ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, PLACER,
SACRAMENTO, SAN FRANCISCO,SAN MATEO, SANTA CLARA, SANTA CRUZ,
SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES:
Rates Fringes
Asbestos Removal Laborer.........$ 24.00 11.30
SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped;
encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations.
LABO0185-001 06/25/2018
EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES
Rates Fringes
Laborers: (CONSTRUCTION CRAFT
LABORERS)
Construction Specialist.....$ 30.49 23.20
GROUP 1.....................$ 29.79 23.20
GROUP 1-a...................$ 30.01 23.20
GROUP 1-c...................$ 29.84 23.20
GROUP 1-e...................$ 30.34 23.20
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 29.64 23.20
GROUP 3.....................$ 29.54 23.20
GROUP 4.....................$ 23.23 23.20
Laborers: (GUNITE)
GROUP 1.....................$ 28.35 18.66
GROUP 2.....................$ 27.85 18.66
https://beta.sam.gov/wage-determination/CA20190019/9/document 33/76
GROUP 3.....................$ 27.26 18.66
GROUP 4.....................$ 27.14 18.66
Laborers: (WRECKING)
GROUP 1.....................$ 29.79 23.20
GROUP 2.....................$ 29.64 23.20
Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS)
Establishment Warranty
Period......................$ 23.23 23.20
New Construction............$ 29.54 23.20
FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts (not applicable to workers entitled to receive the wage rate set forth in Group 1-a):
$0.25 per hour additional.
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers' work;
Cast-in- place manhole form setter; Pressure pipelayer;
Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill;
Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2
yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches;
Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic https://beta.sam.gov/wage-determination/CA20190019/9/document 34/76 and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder;
Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud gun;
Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller;
Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder;
All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding https://beta.sam.gov/wage-determination/CA20190019/9/document 35/76
GROUP 1-d: Maintenance and repair track and road beds
(underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work);
Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew;
High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher;
Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and https://beta.sam.gov/wage-determination/CA20190019/9/document 36/76 piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material. B:
at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
GUNITE LABORER CLASSIFICATION
GROUP 1: Structural nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
LABO0185-003 07/01/2018
EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES
https://beta.sam.gov/wage-determination/CA20190019/9/document 37/76
Rates Fringes
LABORER
Mason Tender-Brick..........$ 31.20 22.20
LABO0185-007 07/01/2018
EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA,
SUTTER, YOLO AND YUBA COUNTIES
Rates Fringes
Plasterer tender.................$ 32.02 23.00
Work on a swing stage scaffold: $1.00 per hour additional.
LABO0261-001 06/25/2018
MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES
Rates Fringes
Laborers: (CONSTRUCTION CRAFT
LABORERS)
Construction Specialist.....$ 31.49 23.20
GROUP 1.....................$ 30.79 23.20
GROUP 1-a...................$ 31.01 23.20
GROUP 1-c...................$ 30.84 23.20
GROUP 1-e...................$ 31.34 23.20
GROUP 1-f...................$ 31.37 23.20
GROUP 2.....................$ 30.64 23.20
GROUP 3.....................$ 30.54 23.20
GROUP 4.....................$ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
Laborers: (GUNITE)
GROUP 1.....................$ 29.35 18.66
GROUP 2.....................$ 28.85 18.66
GROUP 3.....................$ 28.26 18.66
GROUP 4.....................$ 28.14 18.66
https://beta.sam.gov/wage-determination/CA20190019/9/document 38/76
Laborers: (WRECKING)
GROUP 1.....................$ 28.39 23.20
GROUP 2.....................$ 30.64 23.20
Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE
LABORERS)
Establishment Warranty
Period.......
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .