Atch 5 Task Description
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos and Lead Base Paint Abatement 8 Aug 11
TRAVIS AFB
LIST OF TASK DESCRIPTIONS
Task #1 Preparation of Asbestos or Lead Based Paint Hazard Abatement Plan
Task #2 Preparation of Asbestos or Lead Paint Sampling Plan
Task #3 TCLP (Lead) Analysis
Task #4 Removal and Return of General Office Furniture. This task includes labor, material and equipment.
Task #5 Installation and disposal of Critical Barrier and Full Containment Area up to 8 ft in height for hard floor (per 100 SF for Delivery Orders>100 SF but <= to 1,000 SF) for areas with LESS than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #6 Installation and disposal of Critical Barrier and Full Containment Area up to 8 ft in height for hard floor (per 100 SF for Delivery Orders>100 SF but <= to 1,000 SF) for areas with MORE than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #7 Installation and disposal of Critical Barrier and Full Containment Area up to 8 ft in height for hard floor surfaces (per 1,000 SF for Delivery Orders > 1,000 SF but <= to 10,000 SF) for areas with LESS than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #8 Installation and disposal of Critical Barrier and Full Containment Area up to 8 ft in height for hard floor surfaces (per 1,000 SF for Delivery Orders > 1,000 SF but <= to 10,000 SF) for areas with MORE than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #9 Installation and disposal of Critical Barrier and Full Containment Area up to 8 ft in height for hard floor surfaces (per 1,000 SF for Delivery Orders > 10,000 SF but <= 20,000 SF) for areas with LESS than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #10 Installation and disposal of Critical Barrier and Full Containment Area up to 8 ft in height for hard floor surfaces (per 1,000 SF for Delivery Orders>10,000 SF but <= 20,000 SF) for areas with MORE than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #11 Installation and disposal of Critical Barrier and Full Containment Area >8 Ft but <= to 16 ft in height for hard floor surfaces (per 100 SF for Delivery >100 SF but <= 1,000 SF) for areas with LESS than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #12 Installation and disposal of Critical Barrier and Full Containment Area > 8 ft but <= 16 ft in height for hard floor surfaces (per 100 SF for Delivery > 100 SF but <= to 1,000 SF) for areas with MORE than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #13 Installation and disposal of Critical Barrier and Full Containment Area > 8 ft but <= 16 ft in height for hard floor surfaces (per 1000 SF for Delivery > 1000 SF but <= to 10,000 SF) for areas with LESS than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #14 Installation and disposal of Critical Barrier and Full Containment Area > 8 ft but <= to 16 ft in height for hard floor surfaces (per 1,000 SF for Delivery Orders > 1,000 SF but <= 10,000 SF) for areas with MORE than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #15 Installation and disposal of Critical Barrier and Full Containment Area >8 ft but <= to 16 ft in height for hard floor surfaces (per 1,000 SF for Delivery >10,000 SF but <= 20,000 SF) for areas with LESS than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #16 Installation and disposal of Critical Barrier and Full Containment Area >8 ft but <= to 16 ft in height for hard floor surfaces (per 1,000 SF for Delivery Orders > 10,000 SF but <= 20,000 SF) for areas with MORE than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #17 Installation and disposal of Critical Barrier and Full Containment Area <= 8 ft in height for Vinyl Tile floors (per 100 SF for Delivery Orders > 100 SF but <= 1,000 SF) for areas with LESS than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment
Task #18 Installation and disposal of Critical Barrier and Full Containment Area <= 8 ft in height for Vinyl Tile floors (per 100 SF for Delivery Orders > 100 SF but <= 1,000 SF) for areas with MORE than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #19 Installation and disposal of Critical Barrier and Full Containment Area <= 8 ft in height for Vinyl Tile floors (per 1,000 SF for Delivery Orders > 1,000 SF but <= 10,000 SF) for areas with LESS than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #20 Installation and disposal of Critical Barrier and Full Containment Area <= 8 ft in height for Vinyl Tile floors (per 1,000 SF for Delivery Orders > 1,000 SF but <= 10,000 SF) for areas with MORE than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #21 Installation and disposal of Critical Barrier and Full Containment Area > 8 ft but <= 16 ft in height for Vinyl Tile floors (per 100 SF for Delivery Orders > 100 SF but <= 1,000 SF) for areas with LESS than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #22 Installation and disposal of Critical Barrier and Full Containment Area > 8 ft but <= 16 ft in height for Vinyl Tile floors (per 100 SF for Delivery Orders > 100 SF but <= 1,000 SF) for areas with MORE than 6 Rooms. This task includes labor, material, warning signs, labels, disposal and equipment.
Task #23 Removal/disposal of Lead-Based Paint Window Metal Frames < 200 SF of window surface at opening. This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #24 Removal of Lead-Based Paint Window Metal Frames > 200 SF or <= 2,000 SF of window surface at opening. This task includes labor, material, warning signs, labels, disposal, disposal, monitoring/sampling and equipment.
Task # 25 Poly Enclosure of Fixed Equipment and/or Immovable Objects (per SF of Surface Area).
This task includes labor, material, warning signs, labels, disposal and equipment.
Task #26 Air Monitoring and Testing (PCM). This task includes labor, material and equipment.
Task #27 Air Monitoring and Testing (Lead). This task includes labor, material and equipment.
Task #28 Asbestos Abatement: Pipe Insulation Fitting Removal in Containment per LF (Pipe Diameter < 3 "). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #29 Asbestos Abatement: Pipe Insulation Fitting Removal in Containment per LF (Pipe Diameter 3" or Greater but Less than 8"). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #30 Asbestos Abatement: Pipe Insulation Fitting Removal in Containment per LF (Pipe Diameter 8" or Greater). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #31 Asbestos Abatement: Pipe Insulation Fitting Removal in Glove Bags per LF (Pipe Diameter < 3"). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #32 Asbestos Abatement: Pipe Insulation Fitting Removal in Glove Bags per LF (Pipe Diameter 3" or Greater but Less than 8"). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #33 Asbestos Abatement: Pipe Insulation Fitting Removal in Glove Bags per LF (Pipe Diameter 8" or Greater). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #34 Asbestos Abatement: Pipe Insulation/Fitting Removal by Intact Method (Pipe Diameter < 3"). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #35 Asbestos Abatement: Pipe Insulation Fitting Removal by Intact Method (Pipe Diameter 3" or Greater but Less than 8"). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #36 Asbestos Abatement: Pipe Insulation/Fitting Removal by Intact Method (Pipe Diameter 8" or Greater). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #37 Abatement: Spray-On Insulation Removal per SF (Flat Ceilings <= 8 ft in height).
This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #38 Abatement: Spray-On Insulation Removal per SF (Flat Ceilings > 8 ft but <= 16 ft in height). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #39 Abatement: Spray-On Insulation Removal per SF (Flat Ceilings > 16 ft but <= 24 ft in height). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #40 Abatement: Suspended Ceiling Tile per SF (< or equal to 8 ft in height). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task # 41 Abatement: Suspended Ceiling Tile per SF (> 8 ft but < = to 16 ft in height). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #42 Abatement: Duct/Flue Insulation per LF (Less than 4 ft).
This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #43 Abatement: Duct/Flue Insulation per LF (> 4 ft but <= 8 ft). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #44 Abatement: Duct/Flue Insulation per LF (> 8 ft but <= 12 ft). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #45 Abatement: Tank/Boiler Insulation per SF. This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #46 Abatement: Cement asbestos Board/Shingle Siding per SF <= 10 ft in height. This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #47 Abatement: Cement asbestos Board/Shingle Siding per SF (> 10 ft but <= 20 ft in height). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #48 Abatement: Cement asbestos Board/Shingle Siding per SF (> 20 ft but <= 30 ft in height). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #49 Abatement: Non-Friable ACM VAT, including Adhesive/Mastic (per SF for Delivery Orders > 100 SF but <= 1,000 SF). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #50 Abatement: Non-Friable ACM VAT, including Adhesive/Mastic (per 1,000 SF for Delivery Orders> 1,000 SF but <= 10,000 SF). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #51 LBP Abatement of Flat and Wood Trim Surfaces (per 100 SF for Delivery Orders < 1,000 SF)
Task #52 LBP Abatement of Flat and Wood Trim Surfaces (per 1,000 SF for Delivery Orders >= 1,000 SF)
Task #53 Abatement: Asbestos Debris per Cubic Yard (CY). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #54 Handling/Transportation to Class I Landfill (per mile). This task includes labor, material, warning signs, labels, disposal, disposal documentation and equipment.
Task #55 Handling/Transportation per CY. This task includes labor, material, warning signs, labels, disposal, disposal documentation and equipment.
Task #56 Disposal, monitoring/sampling of used Mastic Remover per 55 Gallon Drum. This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #57 Disposal, monitoring/sampling of Lead-Based Paint per 5 to 55 Gallon Drum. This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #58 Maintenance/Repair: Penetrating Encapsulation. This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #59 Maintenance/Repair: Bridging Encapsulation. This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #60 Clearance Sampling (PCM). This task includes labor, material and equipment.
Task #61 Reinsulation of pipe per LF (diameter less than 3”). This task includes labor, material, warning signs, labels, disposal and equipment.
Task #62 Reinsulation of Pipe per LF (diameter 3” or greater but less than 8”). This task includes labor, material, warning signs, labels, disposal and equipment.
Task #63 Reinsulation of Pipe per LF (diameter 8" or greater). This task includes labor, material, warning signs, labels, disposal and equipment.
Task #64 Reinsulation of Tank/Boiler per SF. This task includes labor, material and equipment.
Task #65 Decontamination Unit (2 Stage). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #66 Decontamination Unit (3 Stage). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #67 Scaffolding, 1 Rise in height, per Unit. This task includes labor, material and equipment.
Task #68 Scaffolding, 2 Rises in height, per Unit. This task includes labor, material and equipment.
Task #69 Scaffolding, 3 Rises in height, per Unit. This task includes labor, material and equipment.
Task # 70 Remove Carpet. This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Task #71 Remove Linoleum (when Floor Tile and Linoleum are present, use this line for both removals). This task includes labor, material, warning signs, labels, disposal, monitoring/sampling and equipment.
Attachment # 5 8 of 8