Mechanical_Drawings.pdf

PDF 829 KB Posted

Attached to
HVAC Renovation for Bldg 174 Aerial Delivery Facility
Solicitation number
FA4418-19-R-A004
Issued by

About this file

FA4418-19-R-A004 Mechanical Drawing

View the file

Other files

File Type Posted
Site_Visit_Questions.pdf PDF
Addendum_1_FA4418-19-R-A0004.pdf PDF
30_Nov_18_(Correct)_General_Drawings.pdf PDF
Specifications_.pdf PDF
Electrical_Drawings.pdf PDF
AF_Form_66.pdf PDF
Wage_Determination.pdf PDF
Solicitation_-_FA441819RA0040001.pdf PDF
General_Drawings.pdf PDF
Green_Procurement_Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN CONDITIONS

INDOOR:

OUTDOOR:

SUMMER

OUTDOOR:

WINTER

INDOOR:

95°F DB / 80°F WB

78°F DB / 45% RH

25°F DB

68°F DB

GENERAL HVAC NOTES

1. THE DRAWINGS SHOW THE GENERAL ARRANGEMENT AND LOCATION OF EQUIPMENT, DUCTWORK, PIPING, ETC. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE MECHANICAL INSTALLATION W/ THE STRUCTURE AND

OTHER TRADES AND SHALL PROVIDE ADDITIONAL OFFSETS AND FITTINGS AS NECESSARY.

2. COORDINATE WORK WITH GOVERNMENT AND OBTAIN ALL PERMITS AND INSPECTIONS.

3. PROVIDE GOVERNMENT WITH CERTIFICATES OF FINAL INSPECTION AND ACCEPTANCE.

4. THE HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS SHALL COMPLY WITH THE THE CODES LISTED ON THIS

SHEET AS WELL AS ALL GOVERNMENT UFC CODE OFFICIAL REQUIREMENTS. IN THE EVENT OF A CONFLICT BETWEEN

CODES, THE MOST STRINGENT SHALL ALWAYS GOVERN.

5. DUCT DIMENSIONS ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS.

6. THE CONTRACTOR SHALL CHECK AND VERIFY ALL CLEARANCES PRIOR TO FABRICATION OR INSTALLATION OF

EQUIPMENT, DUCTWORK, AND PIPING SYSTEMS. WHERE CONDITIONS REQUIRE A CHANGE IN DUCT OR PIPE ROUTING, NOTIFY THE GOVERNMENT AND ENGINEER FOR AN ACCEPTABLE ALTERNATIVE METHOD. AVOID ROUTING COMPONENTS DIRECTLY OVER LIGHT FIXTURES, DIFFUSERS, AND OTHER CEILING MTD. DEVICES. LOCATE ALL MECHANICAL EQUIPMENT SO THAT FILTERS AND COMPONENTS REQUIRING ACCESS (SERVICE AND MAINTENANCE) ARE FULLY ACCESSIBLE.

7. INSTALL ALL DUCT MOUNTED DEVICES (DAMPERS, ACCESS DOORS, ETC.) AND PIPING SPECIALTIES IN EASILY ACCESSIBLE LOCATIONS. ADVISE THE ENGINEER IN ADVANCE OF INSTALLATION IF ACCESS WILL BE HINDERED SO AN ALTERNATE

LOCATION CAN BE SELECTED.

8. ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS WITH PRESCRIBED CLEARANCES FOR SERVICE AND MAINTENANCE. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IF RECOMMENDED CLEARANCES ARE NOT POSSIBLE BEFORE INSTALLING EQUIPMENT.

9. ALL ROTATING MECHANICAL EQUIPMENT SHALL BE PROVIDED WITH VIBRATION ISOLATION. PROVIDE FLEXIBLE

NEOPRENE DUCT CONNECTORS BETWEEN DUCTWORK AND ISOLATED MECHANICAL EQUIPMENT.

10. SEISMIC PROTECTION OF EQUIPMENT, DUCTWORK, PIPING AND UTILITIES SHALL BE PROVIDED IN ACCORDANCE WITH SECTION 16 OF THE INTERNATIONAL BUILDING CODE, 2015 EDITION. ALL SEISMIC RESTRAINT AND BRACING SHALL BE SUBSTANTIATED BY MANUFACTURER'S SUBMITTALS PER THE SPECIFICATIONS. FOR ADDITIONAL INFORMATION, SEE 'SEISMIC AND WIND REQUIREMENTS FOR MECHANICAL SYSTEMS' ON THIS SHEET. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING INSTALLATION OF SEISMIC BRACING DEVICES WITH THE OWNER'S SEISMIC SPECIAL INSPECTOR.

PROVIDE A MINIMUM OF SEVEN DAYS ADVANCE NOTICE OF INSTALLATION.

11. BALANCE ALL AIR DISTRIBUTION DEVICES, EXHAUST FANS, AND OUTSIDE AIR QUANTITIES AS SCHEDULED OR SHOWN ON THE DRAWINGS. PROVIDE MARKERS AT ALL DAMPER LOCATIONS SHOWING FULL OPEN/CLOSED POSITIONS AND DAMPER SETTING FOR REQUIRED AIRFLOW. PROVIDE FINAL TEST AND BALANCE REPORT ALONG W/ SCHEMATIC DRAWINGS SHOWING DIFFUSER LOCATION W/ DESIGN AND ACTUAL CFM. THE DIFFUSER TAGS ON THE DRAWINGS SHALL CORRESPOND TO THE DIFFUSER TAGS ON THE REPORT. THIS REPORT SHALL BE SUBMITTED BEFORE THE FINAL

INSPECTION IS PERFORMED. SEE SPECIFICATIONS FOR FURTHER INFORMATION.

12. ALL CONTROL WIRING, CONDUIT AND CONTROLS ACCESSORIES NECESSARY TO IMPLEMENT THE OUTLINED SEQUENCES

OF OPERATION SHALL BE PROVIDED BY THE CONTROLS CONTRACTOR.

13. WIND LOAD PROTECTION OF ROOF MOUNTED EQUIPMENT AND DUCTWORK SHALL BE PROVIDED IN ACCORDANCE WITH SECTION 16 OF THE INTERNATIONAL BUILDING CODE, 2015 EDITION. ALL WIND LOAD RESTRAINT AND BRACING SHALL BE

SUBSTANTIATED BY MANUFACTURER'S SUBMITTALS PER THE SPECIFICATIONS.

14. WHERE "APPROXIMATELY" IS USED TO DEFINE INSTALLATION LOCATIONS, CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES TO VERIFY THERE ARE NO CONFLICTS PRIOR TO INSTALLATION AT DIMENSION LISTED.

AUTOMATIC BALANCING CONTROL VALVE

HOSE BIBB

DIRECTION OF PIPING FLOW

PIPING SLOPE

PIPE CAP

DRAIN VALVE W/ HOSE CONNECTION

AUTOMATIC AIR VENT

BASKET STRAINER

RELIEF VALVE

RINSE VALVE

FLANGE CONNECTION

M

M

S

SOLENOID VALVE

SWING CHECK VALVE

PLUG VALVE

CIRCUIT SENSOR

BACKFLOW PREVENTER

PRESSURE REDUCING VALVE

UNION

ECCENTRIC REDUCER/INCREASER

CONCENTRIC REDUCER/INCREASER

MOTORIZED BALL VALVE

MOTORIZED BUTTERFLY VALVE

END SUCTION PUMP

DOUBLE SUCTION PUMP

PUMP CONNECTOR/FLEX CONNECTOR

GATE VALVE

PUMP SUCTION DIFFUSERPSD

CIRCUIT SETTER

EARTHQUAKE VALVE

BALL VALVE

HVAC PIPING SPECIALTIES SYMBOL LEGEND

CONNECTION TO EXISTING SYSTEM

X"x Y"

TURNING VANES

CONDENSING UNIT

DUCTWORK (X" = WIDTH, Y" = HEIGHT)

COMPONENT TO BE DEMOLISHED

EQUIPMENT CLEARANCE

HVAC SYMBOL LEGEND

DESCRIPTIONSYMBOL SYMBOL DESCRIPTION

DESCRIPTIONSYMBOL SYMBOL DESCRIPTION

WYE STRAINER W/BLOWDOWN BALL VALVE

WITH HOSE CONNECTION

31WAY CONTROL VALVE

WAFER CHECK VALVE

WYE STRAINER

FLANGED JOINT

ELBOW UP

ELBOW DOWN

TEE UP

TEE DOWN

ELBOW SIDE

TEE SIDE

BUTTERFLY VALVE

BALL VALVE

CIRCUIT SETTER/ BALANCING VALVE

PIPE WITH HEAT TRACING INSULATION AND

JACKET

M

MOTORIZED BUTTERFLY VALVE

HVAC PIPING SYMBOL LEGEND

DESCRIPTIONSYMBOL

A M

IL

I

L W

BA

D E N

I

A

I I

R

L L

DG

No.

TU

D S

IS

R

E T

E

AA

30241

RE

G E

ER

IN

E N

L

RCAH

ORP

SEF

OL

N

S IO

IN

O

I

R A

D

M A

N

COM

MO

IT Y

B I L

A/E SEAL

A

B

C

D

A

B

C

D

4 5321

21 3 4 5

IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

OFSHEET

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D

D A T E

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

D R A W

IN

G

R E V

IS

IO

N S

D A T E

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

ANSI D (22"x34")DRAWING SIZE:

PROJECT NO.

OFSHEET

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D R E V

D A

TE

D E S C R

IP

T

IO

N

D R A W

IN

G

R E V

IS

IO

N S

C H K

B Y

D R A W N

B Y

D S G N

B Y

I

R A

D

M A

N

COM

MO

IT Y

B I L

A P P R O V E D

B Y

F O R

J O

IN

T

B A S E

C H A R L E S T O N

D A T E

G

E W

B

A IR AS

I N 62 8T H

D W

G C

O N

S U

LT

IN

G E

N G

IN

E

E R

S , I

N C

A

N N

A K

N A

P P

B

LV

D

S U

IT

E

M T

. P

LE

A S

A N

T , S

C

JO

IN

T B

AS

E

C H

AR

LE

S

TO

N

C H A R L E S T O N S C

M001

H

VA

C N

O

TE

S, S C H

ED

U

LE

S, L

EG

EN

DS

W D

B W

D B

M A

U

/0

2/

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

Fa ci lit y

Fa ci lit y

Fa ci lit y

Fa ci lit y

DKFX 08110306

MECHANICAL ABBREVIATIONS

ABBR DESCRIPTION

(E) EXISTING

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AH AIR HANDLER

AHU AIR HANDLING UNIT

APD AIR PRESSURE DROP

BHP BRAKE HORSE POWER

BMS BUILDING MANAGMENT SYSTEM

BOD BASIS OF DESIGN

C DOMESTIC COLD WATER SUPPLY

CFM CUBIC FEET PER MINUTE

CHF CHEMICAL FEED

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CO CLEANOUT

CU CONDENSING UNIT

DB DECIBELS

DCW DOMESTIC COLD WATER

DDC DIRECT DIGITAL CONTROLS

DIA DIAMETER

DRN DRAIN

DX DIRECT EXPANSION

EC ELECTRICAL CONDUCTOR

EMCS ENERGY MANAGEMENT CONTROL

SYSTEM

ESP EXTERNAL STATIC PRESSURE

FD FLOOR DRAIN

FPM FEET PER MINUTE

FRPM FAN ROTATIONS PER MINUTE

FT FEET

GPM GALLONS PER MINUTE

HP HORSEPOWER

IN INCHES

LAT LEAVING AIR TEMPERATURE

MBH THOUSANDS OF BTU'S PER HOUR

MC MECHANICAL CONTRACTOR

NC NOISE CRITERIA

NO NORMALLY OPEN

OA OUTSIDE AIR

PD PRESSURE DROP

PS PIPE SUPPORT

REFR REFRIGERANT

RPM ROTATIONS PER MINUTE

TYP TYPICAL

UG UNDERGROUND

UNO UNLESS NOTED OTHERWISE

VFD VARIABLE FREQUENCY DRIVE

W/ WITH

°F DEGREES FAHRENHEIT

MECHANICAL CODES & STANDARDS

CODE DESCRIPTION

IBC (2015) INTERNATIONAL BUILDING CODE

IECC (2015) INTERNATIONAL ENERGY CONSERVATION CODE

IMC (2015) INTERNATIONAL MECHANICAL CODE

NFPA 90A (2009) STANDARD FOR THE INSTALLATION AIR1CONDITIONING & VENTILATING SYSTEMS

SMACNA (2005) HVAC DUCT CONSTRUCTION STANDARDS MANUAL, THIRD EDITION

AIR COOLED CHILLER SCHEDULE

UNIT

I.D.

NOMINAL

CAPACITY

CHILLED WATER

AMBIENT

AIR IPLV

BASIS OF

DESIGN MODEL

DESIGN

FLOW RATE EWT LWT

MAX PRESSURE

DROP

CH11 60 TONS 106 GPM 56 °F 44 °F 8.60 ftH2O 95 14.6 TRANE CGAM 60

CHILLED WATER COOLING COIL SCHEDULE

UNIT

I.D.

AIR CAPACITY

CFM

TOTAL

MBH

SENS.

MBH

MAX FV

(FPM)

ENTERING AIR LEAVING AIR

GPM EWT °F LWT °F

AIR P.D. (IN

W.G.)

WATER P.D.

(FT W.G.)

FINS /

INCH SIZE MANUFACTURER MODELD.B. °F W.B. °F D.B. °F W.B. °F

CCC11 10,000 385.2 275.6 481 FPM 80.0 °F 67.0 °F 55.0 °F 54.5 °F 64.0 GPM 56 °F 44 °F 0.65 in1wg 6.2 ftH2O 103 67"x45" TRANE DUWB45

CCC12 8,800 249.4 209.9 423 FPM 76.7 °F 63.8 °F 55.0 °F 54.5 °F 42.0 GPM 56 °F 44 °F 0.44 in1wg 2.8 ftH2O 84 67"x45" TRANE DUWB45

NOTES:

1. FIELD VERIFY DIMENSIONS OF COIL TO FIT IN EXISTING AIR HANDLER CABINET.

2. DELTA FLOW H FIN TYPE

3. ALUMINUM FINS, COPPER TUBES

4. AHRI ACHC 410 CERTIFIED

5. PROVIDE REPLACEMENT AIR HANDLER ENCLOSURE PANELS TO REPLACE EXISTING AROUND REPLACED COILS.

NOTES:

1. COORDINATE VOLTAGE WITH ELECTRICAL DRAWINGS.

2. INCLUDE INTEGRAL DUAL PUMPING PACKAGE, 60' HEAD PRESSURE. VFD'S SHALL BE PROVIDED BY THE CHILLER

MANUFACTURER TO CONTROL THE PUMPS.

3. INCLUDE WITH INTEGRAL 136 GALLON BUFFER TANK.

4. INCLUDE WITH INTEGRAL 5 GALLON EXPANSION TANK.

5. SUPER QUIET SOUND ATTENUATOR PACKAGE.

6. INCLUDE WITH DDC CONNECTION TO CONNECT TO EXISTING BASE EMCS.

7. INCLUDE WITH SINGLE POINT POWER, EXCEPT HEAT TRACE.

8. CONDENSER COIL SHALL BE FACTORY APPLIED WITH EPOXY COATING.

9. PROVIDE WITH INTEGRAL DISCONNECT.

10. PROVIDE WITH FACTORY INSTALLED HEAT TRACE, THIS REQUIRES A SEPARATE ELECTRICAL CONNECTION.

AIR SEPARATOR SCHEDULE

UNIT

I.D.

SYSTEM

CONNECTION

DESIGN FLOW

RATE

MAXIMUM DESIGN

PRESSURE DROP TYPE

BASIS OF

DESIGN MODEL

AS11 3" 106 GPM 1.0 ftH2O TANGENTIAL AIR SEPARATOR LESS STRAINER BELL & GOSSETT RL13FB

NOTES:

H = (FAN S.P.) + 1"3.

J"

ACCESSIBLE FOR CLEANING.

2. "RUNNING" TYPE TRAPS SHALL

BE UNACCEPTABLE.

1. LOCATE TRAPS SO AS TO BE

PIPE FULL SIZE

OF UNIT DRAIN

H"

UNIT CASING

SCREWED CAP

OPEN END (VENT)

J = H/2 (MIN.)4.

5 FT 6 8 10

32 2 1/21 1/21 1 1/4THRU 3/4

7 98

ADJUSTABLE CLEVIS HANGER

TYPE 43 1 SEE SPECIFICATIONS

WELD

SADDLE

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

THREADED HANGER ROD

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF

SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

IN.

FT.

NOTES:

SEE SPECIFICATIONS

FOR DETAILED HANGER

REQUIREMENTS

MECHANICAL COMPONENT IMPORTANCE FACTOR (Ip) DESIGNATION

IBC�2015 /ASCE 7�10

SEISMIC AND WIND REQUIREMENTS

FOR MECHANICAL SYSTEMS

COMPONENT IMPORTANCE FACTOR (Ip)

Ip = 1.0 Ip = 1.5

RESTRAIN IF TOTAL WEIGHT OF

DUCTS ON TRAPEZE > 10 LBS/FT

44 RESTRAIN IF TOTAL WEIGHT OF

DUCTS ON TRAPEZE > 10 LBS/FT

MULTIPLE DUCTS ON TRAPEZE

51 6 SQ.FT. AND LARGER

RESTRAIN IF ANY PIPE ON TRAPEZE > 1"

RESTRAIN IF TOTAL WEIGHT OF PIPES ON

TRAPEZE > 10 LBS/FT

4 RESTRAIN ALL

RESTRAIN IF ANY PIPE ON

TRAPEZE > 3" RESTRAIN IF

TOTAL WEIGHT OF PIPES ON

TRAPEZE > 10 LBS/FT

RESTRAIN ALL

SUSPENDED PIPE ON TRAPEZE

SUSPENDED NON DUCTILE PIPING

(CAST IRON, PLASTIC, CERAMIC)

A. PER SECTION 301.15 OF THE 2012 EDITION OF THE INTERNATIONAL MECHANICAL CODE, MECHANICAL EQUIPMENT, APPLIANCES AND SUPPORTS (INCLUDING ROOF CURBS & ROOF RAILS) EXPOSED TO WIND SHALL BE DESIGNED AND INSTALLED TO RESIST THE WIND PRESSURES DETERMINED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. WHERE SEISMIC RESTRAINT IS REQUIRED, THE MORE DEMANDING FORCE OF WIND AND SEISMIC MUST BE USED. SEE SEISMIC INFORMATION CONTAINED IN THE STRUCTURAL

DRAWINGS FOR SITE SPECIFIC INFORMATION ON SEISMIC DESIGN CATEGORY.

B. SEE EQUIPMENT SCHEDULES AND DETAILS FOR SPECIFIC COMPONENT IMPORTANCE FACTOR DESIGNATIONS.

C. USE APPLICABLE TABLE BELOW TO DETERMINE SEISMIC RESTRAINT REQUIREMENTS FOR EACH MECHANICAL COMPONENT.

D. FOR ALL COMPONENTS REQUIRING SEISMIC RESTRAINT, THE COMPONENT SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED BY A

REGISTERED DESIGN PROFESSIONAL. SUBMITTALS MUST INCLUDE STAMPED AND SIGNED DRAWINGS AND CALCULATIONS.

E. WHERE SEISMIC RESTRAINT IS REQUIRED, HOUSEKEEPING PADS NEEDED FOR THE INSTALLATION OF EQUIPMENT UNDER THIS

CONTRACT MUST BE DESIGNED BY THE SEISMIC ENGINEER. DO NOT POUR ANY HOUSEKEEPING PADS PRIOR TO THE RECEIPT OF THE

SEISMIC SUBMITTAL.

F. SEISMIC RESTRAINTS FOR PIPING AND DUCTWORK MUST BE SHOWN ON LAYOUT DRAWINGS SHOWING SPECIFIC RESTRAINT

LOCATIONS ALONG WITH ACCOMPANYING DETAILS AND CALCULATIONS.

NOTES

1.51.0

6REQUIRED6NOT REQUIRED

COMPONENT CERTIFICATION

(SEE NOTE 6)

6 SQ.FT. AND LARGERDUCTWORK

4>1"4>3"SUSPENDED DUCTILE PIPING

STEEL, ALUMINUM, COPPER, ETC.

1RESTRAIN ALL1RESTRAIN ALLNOT INLINE W/

DUCT/PIPE

3RESTRAIN IF >75 LBS

PROVIDE FLEX. CONN.

RESTRAIN IF >75 LBS

PROVIDE FLEX. CONN.

INLINE W/ DUCTSUSPENDED

EQUIPMENT

1RESTRAIN ALL1RESTRAIN ALLCOMPONENT SUPPORTS

1RESTRAIN ALL1, 2RESTRAIN ALLWALL MOUNTED

1RESTRAIN ALL1, 2RESTRAIN ALLFLOOR MOUNTED

1RESTRAIN ALL1RESTRAIN ALLROOF MOUNTED

SEISMIC RESTRAINT

REQUIREMENT

NOTES

SEISMIC RESTRAINT

REQUIREMENT

COMPONENT IDENTIFICATION

SEISMIC DESIGN CATEGORIES D,E,F

ALL HVAC COMPONENTS EXCEPT AS NOTED IN Ip=1.5

NOTES:

1. EQUIPMENT 20 LBS. OR LESS IS EXEMPT IF FLEXIBLE CONNECTIONS ARE PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED

DUCTWORK, PIPING, AND CONDUIT.

2. RESTRAINTS ARE NOT REQUIRED IF THE COMPONENT WEIGHS 400 LBS. OR LESS, IS MOUNTED AT 4FT. OR LESS ABOVE A FLOOR, AND HAS FLEXIBLE CONNECTIONS BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING, AND CONDUIT.

3. FLEXIBLE CONNECTIONS REQUIRED FOR PIPE CONNECTIONS ONLY.

4. RESTRAINT IS NOT REQUIRED IF THE PIPING / DUCTWORK IS SUPPORTED BY HANGERS AND EACH HANGER IN THE PIPING RUN IS 12 IN. OR LESS IN LENGTH FROM THE TOP OF THE PIPE TO THE SUPPORTING STRUCTURE. WHERE PIPES ARE SUPPORTED ON A TRAPEZE, THE TRAPEZE SHALL BE SUPPORTED BY HANGERS HAVING A LENGTH OF 12 IN. OR LESS. WHERE ROD HANGERS ARE USED, THEY SHALL BE EQUIPPED WITH SWIVELS, EYE NUTS OR OTHER DEVICES TO PREVENT BENDING IN THE ROD.

5. ALL DUCTWORK , REGARDLESS OF SIZE, DESIGNED TO CARRY TOXIC, HIGHLY TOXIC, OR EXPLOSIVE GASES OR USED FOR SMOKE

CONTROL MUST BE RESTRAINED.

6. COMPONENT CERTIFICATION MUST BE SUPPLIED BY THE EQUIPMENT MANUFACTURER AT TIME OF SUBMITTAL FOR REVIEW BY

ENGINEER OF RECORD.

TYPE 40 PROTECTION SHIELD

HIGH DENSITY

INSULATION

SEE SPECIFICATIONS

TYPE 46 ADJUSTABLE

PIPE ROLL & BASE

3'10"

3"

ASPHALT SEAL

6" STEEL PIPE

GRADE

2'10"±

W 6 X 15

3/16"

CENTERLINE OF SUPPORT

4 1 No.4 BARS

AT

3" O.C.3'10"∅ CONCRETE

FOOTING

4 1 No.4 BARS AT 6" O.C.

CHILLED WATER PIPE

INTEGRAL 1" 14 GAUGE

GALVANIZED LIPPED

STEEL MOUNTING

CHANNEL

PIPE CLAMP.

SIZE AS

REQUIRED

REFER TO PLANS

FOR QUANTITY &

SIZE OF PIPES

GALVANIZED THREADED

ROD, (TYP)

UV1INHIBITED RUBBER BLOCK,

LENGTH AS REQUIRED

LOCKING SQUARE

WASHER &

LOCKNUT

A M

IL

I

L W

BA

D E N

I

A

I I

R

L L

DG

No.

TU

D S

IS

R

E T

E

AA

30241

RE

G E

ER

IN

E N

L

RCAH

ORP

SEF

OL

N

S IO

IN

O

I

R A

D

M A

N

COM

MO

IT Y

B I L

A/E SEAL

A

B

C

D

A

B

C

D

4 5321

21 3 4 5

IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

OFSHEET

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D

D A T E

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

D R A W

IN

G

R E V

IS

IO

N S

D A T E

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

ANSI D (22"x34")DRAWING SIZE:

PROJECT NO.

OFSHEET

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D R E V

D A

TE

D E S C R

IP

T

IO

N

D R A W

IN

G

R E V

IS

IO

N S

C H K

B Y

D R A W N

B Y

D S G N

B Y

I

R A

D

M A

N

COM

MO

IT Y

B I L

A P P R O V E D

B Y

F O R

J O

IN

T

B A S E

C H A R L E S T O N

D A T E

G

E W

B

A IR AS

I N 62 8T H

D W

G C

O N

S U

LT

IN

G E

N G

IN

E

E R

S , I

N C

A

N N

A K

N A

P P

B

LV

D

S U

IT

E

M T

. P

LE

A S

A N

T , S

C

JO

IN

T B

AS

E

C H

AR

LE

S

TO

N

C H A R L E S T O N S C

M002

H

VA

C N

O

TE

S D

ET

AI

LS

W D

B W

D B

M A

U

/0

2/

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

Fa ci lit y

Fa ci lit y

Fa ci lit y

Fa ci lit y

DKFX 08110306

NOT TO SCALEM002

3 CONDENSATE DRAIN TRAP INSTALLATION DETAIL

NOT TO SCALEM002

1 SUSPENDED PIPE SUPPORT DETAIL

NOT TO SCALEM002

2 GROUND PIPE SUPPORT DETAIL

NOT TO SCALEM002

4 CONDENSATE PIPING SUPPORT DETAIL

1"x 1" CHAMFER

TO PROVIDE BOND

ROUGH UP FLOOR

EACH WAY

No. 4 @ 6"O.C.

TROWEL

FINISH

FIN FLR

ALL AROUND

NOTE:

CONCRETE HOUSEKEEPING PAD SHALL BE

DELEGATED DESIGN BY SEISMIC ENGINEER.

STRUCTURAL REINFORCEMENT OF CONCRETE SHALL

BE VERIFIED BASED UPON SEISMIC REQUIREMENTS

AND ASSOCIATED EQUIPMENT(S) WEIGHTS,

DIMENSIONS AND OPERATING CHARACTERISTICS.

DRAIN VALVE

TO DDC CONTROLLER

CHILLED

WATER COIL

AIR VENT

REDUCERS AS REQ'D (TYPICAL)

ISOLATION VALVE

(TYP.)

MOTORIZED MODULATING

CONTROL VALVE (BY

CONTROLS CONTRACTOR)

CIRCUIT SETTER

FITTING WITH PRESSURE/

TEMPERATURE TEST PLUG

(TYPICAL)

STRAINER

W/BLOWDOWN

VALVE & CAP

PROVIDE

BYPASS LINE

WITH VALVE

FOR

FLUSHING

SYSTEM.

NOTE:

INSTALL AN ISOLATION

VALVE AT EACH

CONNECTION TO COIL FOR

MULTIPLE COIL

CONNECTIONS

NOTES:

1. CHEMICAL SHOT FEEDER SHALL BE 2'10" AFF MIN.

2. SEE SPECIFICATIONS FOR FURTHER

INFORMATION. COORDINATE WITH CHEMICAL

TREATMENT PROVIDER.

3/4" PIPING ROUTED TO

WATER LOOP. CONNECT TO

DISCHARGE SIDE OF PUMPS.

3/4" PIPING ROUTED TO

WATER LOOP. CONNECT

TO SUCTION SIDE OF

PUMPS UPSTREAM OF AIR

SEPERATOR.

CHECK VALVE

BALL VALVE

(TYP.)

1/2" DRAIN

VALVE

FINISHED FLOOR

HOSE CONNECTION

51GALLON CHEMICAL

SHOT FEEDER

MANUFACTURER'S

STANDARD SUPPORT

LEG, BOLTED DOWN TO

FLOOR (TYPICAL 3X)

NOTE:

STRAINER

ELASTOMERIC

VIBRATION

ELIMINATOR

PRESSURE/TEMPERATURE

TEST PLUG (TYPICAL)

BUTTERFLY VALVE

UNION

3/4"

DRAIN

VALVE

EVAPORATOR

AIR VENT

AIR VENT

PRESSURE GAUGE

BUTTERFLY VALVE

PRESSURE

GAUGE

PRESSURE /

TEMPERATURE

TEST PLUG

(TYPICAL)

UNION

ELASTOMERIC

VIBRATION

ELIMINATOR

3/4"

DRAIN

VALVE

1. ALL EXTERIOR CHILLED WATER LINES SHALL BE

WRAPPED WITH HEAT TAPE, INSULATION AND METAL

JACKETS.

2. CHILLER MANUFACTURER SHALL PROVIDE

ARCHITECTURAL LOUVERED PANELS TO COVER THE

SERVICE AREA (CONDENSING COIL) AROUND THE

CHILLER.

3. FLOW SWITCH SHALL BE INSTALLED PER

MANUFACTURERS RECOMMENDATIONS WITH THE

ADEQUATE PIPE DIAMETERS OF STRAIGHT PIPE.

SECURE CHILLER TO

CONCRETE

HOUSEKEEPING PAD

PER SEISMIC

RECOMMENDATIONS

PRESSURE REDUCING VALVE 1 SET AT 4 PSIG HIGHER

THAN THE PRESSURE AT THE HIGH POINT IN THE

SYSTEM

TO DRAIN

BLOWDOWN AND

DRAIN VALVE WITH

HOSE CONNECTION

PRESSURE GAUGE

W/ NEEDLE VALVE

BALL VALVE

REDUCED PRESSURE

BACKFLOW PREVENTER

WITH OPEN AIR GAP

REDUCER (WHERE

REQ'D.)

TO PUMP

SUCTION

RELIEF VALVE 1

PIPED TO FLOOR

DRAIN.

BRACKET SUPPORTS

WITH OVERHEAD

SUPPORTS

BUTTERFLY VALVES

FLANGE / UNION

CENTRIFUGAL AIR

SEPARATOR

HIGH

CAPACITY

AIR VENT

FROM SYSTEM

PIPE ALL DRAINS

TO EXISTING

FLOOR DRAINS

(TYPICAL)

A M

IL

I

L W

BA

D E N

I

A

I I

R

L L

DG

No.

TU

D S

IS

R

E T

E

AA

30241

RE

G E

ER

IN

E N

L

RCAH

ORP

SEF

OL

N

S IO

IN

O

I

R A

D

M A

N

COM

MO

IT Y

B I L

A/E SEAL

A

B

C

D

A

B

C

D

4 5321

21 3 4 5

IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

OFSHEET

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D

D A T E

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

D R A W

IN

G

R E V

IS

IO

N S

D A T E

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

ANSI D (22"x34")DRAWING SIZE:

PROJECT NO.

OFSHEET

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D R E V

D A

TE

D E S C R

IP

T

IO

N

D R A W

IN

G

R E V

IS

IO

N S

C H K

B Y

D R A W N

B Y

D S G N

B Y

I

R A

D

M A

N

COM

MO

IT Y

B I L

A P P R O V E D

B Y

F O R

J O

IN

T

B A S E

C H A R L E S T O N

D A T E

G

E W

B

A IR AS

I N 62 8T H

D W

G C

O N

S U

LT

IN

G E

N G

IN

E

E R

S , I

N C

A

N N

A K

N A

P P

B

LV

D

S U

IT

E

M T

. P

LE

A S

A N

T , S

C

JO

IN

T B

AS

E

C H

AR

LE

S

TO

N

C H A R L E S T O N S C

M003

H

VA

C D

ET

AI

LS

W D

B W

D B

M A

U

/0

2/

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

Fa ci lit y

Fa ci lit y

Fa ci lit y

Fa ci lit y

DKFX 08110306

NOT TO SCALEM003

1 CONCRETE HOUSEKEEPING PAD DETAIL

NOT TO SCALEM003

5 CHILLED WATER COIL PIPING DETAIL

NOT TO SCALEM003

2 CHEMICAL TREATMENT INSTALLATION DETAIL

NOT TO SCALEM003

4 CHILLER PIPING DETAIL

NOT TO SCALEM003

3 CHILLED WATER AIR SEPARATOR AND PIPING DETAIL

CHWS

CHWRM

T

AHU POINTS LIST

LEGEND

RETURN

AHU

AIR

NEW

CHILLED

WATER

COIL

MIXING

BOX

M

M

FILTER

NEW

VFD

FANC

NEW TRACER AHU

CONTROLLER

OUTSIDE

P

M

SUPPLY

AHU

VAV AHU 1 EXISTING JCI

VAV CONTROLLERS

SPACE

T

ENERGY MANAGEMENT CONTROL SYSTEM UNIT CONTROLLER

MOTORIZED ACTUATOR

EMCS

M

TEMPERATURE SENSOR

CURRENT SWITCHC

T

T

EXTG

VAV

VARIABLE FREQUENCY DRIVEVFD

T

LOCATE 2/3 OF THE WAY

DOWN THE LENGTH OF

DUCT.

EXISTING FIRE

ALARM PANEL

PRESSURE SENSORPDI11 AHU FAN STATUS (CURRENT)

AI12 DISCHARGE AIR TEMP

AI13 DUCT STATIC PRESSURE

DI12 FIRE ALARM PANEL CONTACT

AI11 MIXED AIR TEMP

AO15 VARIABLE FREQUENCY DRIVE

DO11 START/STOP AHU

AO11 DISCHARGE STATIC PRESSURE SETPOINT

AO12 SUPPLY AIR TEMP SETPOINT

AO13 OA MOTORIZED DAMPER

AO14 RA MOTORIZED DAMPER

AI14 OUTDOOR AIRFLOW

MEASURING STATION

EXTG AHU

T

VAV AIR HANDLING UNIT NOTES:

THE GENERAL INTENT IS TO REPLACE THE CHILLED

WATER COIL, THE CONTROL DAMPERS, THE

SUPPLY FAN VFD, AND THE SENSORS OF THE AIR

HANDLER.

NEW CHILLED WATER CONTROL VALVE SHALL BE

PROVIDED TO THE NEW CHILLED WATER COIL.

A NEW TRACER SC CONTROLLER COMPATIBLE

WITH THE BASE DDC SYSTEM AND NEW AHU

CONTROLLERS SHALL BE PROVIDED.

THE EXISTING JCI VAV CONTROLLERS AND WALL

MOUNTED ZONE CONTROLLERS SHALL REMAIN TO

PROVIDE CONTROL TO ZONE VAV UNITS.

THE CONTROL DAMPERS SHALL BE PROVIDED AND

INSTALLED BY THE MECHANICAL CONTRACTOR.

THE NEW DAMPER ACTUATORS SHALL BE

PROVIDED AND INSTALLED BY CONTROLS

CONTRACTOR.

VFD SHALL BE PROVIDED AND STARTED BY

CONTROLS CONTRACTOR. MECHANICAL

CONTRACTOR SHALL INSTALL VFD. ELECTRICAL

CONTRACTOR SHALL WIRE VFD.

NEW AIRFLOW MEASURING STATION TO BE

PROVIDED AND INSTALLED BY CONTROLS

CONTRACTOR.

THE TWO EXISTING EMCS EQUIPMENT ENCLOSURE

PANELS MAY BE RE1USED FOR NEW CONTROL

EQUIPMENT.

THE EXISTING EMCS CONTROLS WIRES TO BE

EVALUATED AND REUSED IF DEEMED TO BE IN

GOOD CONDITION BY THE CONTROLS

CONTRACTOR.

F

FREEZESTATF

EXTG TRANE FIELD

CONTROLLER

TO TRANE TRACER

BASEWIDE FRONT

END

NEW TRANE SC

CONTROLLER

NEW BACNET

CHILLER

CONTROLLER

NEW COMM

CONNECTION FROM

COMM ROOM TO

MECHANICAL ROOM

COMM ROOM

NEW DAMPERS

INSTALLED BY

MECHANICAL

CONTRACTOR (TYP 2)

NEW CONTROL VALVE

H

NEW GLOBAL

OUTDOOR

TEMPERATURE

AND HUMIDITY

SENSOR.

MOUNT IN

SHADE IN

EXTERIOR

WALL OF

BUILDING

DI13 DUCT STATIC PRESSURE SWITCH

DI14 VFD ALARM

AO16 CHILLED WATER VALVE

DI15 FREEZE STAT ALARM

FILTER STATUSFL

BACNET MSTP ON VFDB

DUCT STATIC HIGH LIMIT SWITCHDS

DS

B

FL

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

EXISTING VAV BOX

CONTROLS AND ROOM

SENSORS TO REMAIN

WITH NO CHANGE

DI16 EMERGENCY PUSHBUTTON

AIR

MONITORING

STATION

E

EMERGENCY SHUTDOWN SWITCHE

CHWS

CHWRM

T

AHU POINTS LIST

LEGEND

RETURN

AHU

AIR

NEW

CHILLED

WATER

COIL

MIXING

BOX

M

M

FILTER

NEW

VFD

FANC

NEW TRACER AHU

CONTROLLER

OUTSIDE

SUPPLY

AHU

ENERGY MANAGEMENT CONTROL SYSTEM UNIT CONTROLLER

MOTORIZED ACTUATOR

EMCS

M

TEMPERATURE SENSOR

CURRENT SWITCHC

T

T

VARIABLE FREQUENCY DRIVEVFD

T

EXISTING FIRE

ALARM PANEL

PRESSURE SENSORP

DI11 AHU FAN STATUS (CURRENT)

AI12 DISCHARGE AIR TEMP

AI13 DUCT STATIC PRESSURE

DI12 FIRE ALARM PANEL CONTACT

AI11 MIXED AIR TEMP

AO15 VARIABLE FREQUENCY DRIVE

DO11 START/STOP AHU

AO11 DISCHARGE STATIC PRESSURE SETPOINT

AO12 SUPPLY AIR TEMP SETPOINT

AO13 OA MOTORIZED DAMPER

AO14 RA MOTORIZED DAMPER

AI14 OA MEASURING STATION

EXISTING AHU

T

CV AIR HANDLING UNIT NOTES:

THE GENERAL INTENT IS TO REPLACE THE

CHILLED WATER COIL, THE CONTROL

DAMPERS, AND THE SENSORS OF THE AIR

HANDLER.

NEW CHILLED WATER CONTROL VALVE

SHALL BE PROVIDED TO THE NEW

CHILLED WATER COIL.

A NEW TRACER SC CONTROLLER

COMPATIBLE WITH THE BASE DDC

SYSTEM AND NEW AHU CONTROLLERS

SHALL BE PROVIDED.

THE CONTROL DAMPERS SHALL BE

PROVIDED AND INSTALLED BY THE

MECHANICAL CONTRACTOR.

THE NEW DAMPER ACTUATORS SHALL BE

PROVIDED AND INSTALLED BY CONTROLS

CONTRACTOR.

VFD SHALL BE PROVIDED AND STARTED

BY CONTROLS CONTRACTOR.

MECHANICAL CONTRACTOR SHALL

INSTALL VFD. ELECTRICAL CONTRACTOR

SHALL WIRE VFD.

NEW AIRFLOW MEASURING STATION TO

BE PROVIDED AND INSTALLED BY

CONTROLS CONTRACTOR.

THE TWO EXISTING EMCS EQUIPMENT

ENCLOSURE PANELS MAY BE RE1USED

FOR NEW CONTROL EQUIPMENT.

THE EXISTING EMCS CONTROLS WIRES TO

BE EVALUATED AND REUSED IF DEEMED

TO BE IN GOOD CONDITION BY THE

CONTROLS CONTRACTOR.

THE CONTROLS CONTRACTOR SHALL

REPLACE THE EXISTING SPACE

TEMPERATURE AND HUMIDITY SENSORS.

F

FREEZESTATF

EXTG TRANE FIELD

CONTROLLER

TO TRANE TRACER

BASEWIDE FRONT

END

NEW TRANE SC

CONTROLLER

NEW BACNET

CHILLER

CONTROLLER

NEW COMM

CONNECTION FROM

COMM ROOM TO

MECHANICAL ROOM

COMM ROOM

NEW DAMPERS

INSTALLED BY

MECHANICAL

CONTRACTOR (TYP 2)

NEW CONTROL VALVE

H

NEW GLOBAL

OUTDOOR

TEMPERATURE

AND HUMIDITY

SENSOR.

MOUNT IN

SHADE IN

EXTERIOR

WALL OF

BUILDING

DI13 DUCT STATIC PRESSURE SWITCH

DI14 VFD ALARM

AO16 CHILLED WATER VALVE

DI15 FREEZE STAT ALARM

FILTER STATUSFL

BACNET MSTP ON VFDB

DUCT STATIC HIGH LIMIT SWITCHDS

DS

B

FL

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

DO12 DUCT ELECTRIC HEAT STAGE 1

DO13 DUCT ELECTRIC HEAT STAGE 2

(E)

HEAT

STRIP

AI15 OUTDOOR AIR TEMPERATURE

AI16 OUTDOOR AIR HUMIDITY

T H

SPACE

T

EXISTING

ELECTRIC

DUCT HEATER

AIR

MONITORING

STATION

E

EMERGENCY SHUTDOWN SWITCHE

WALL MOUNTED HUMIDITY SENSORH

A M

IL

I

L W

BA

D E N

I

A

I I

R

L L

DG

No.

TU

D S

IS

R

E T

E

AA

30241

RE

G E

ER

IN

E N

L

RCAH

ORP

SEF

OL

N

S IO

IN

O

I

R A

D

M A

N

COM

MO

IT Y

B I L

A/E SEAL

A

B

C

D

A

B

C

D

4 5321

21 3 4 5

IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

OFSHEET

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D

D A T E

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

D R A W

IN

G

R E V

IS

IO

N S

D A T E

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

ANSI D (22"x34")DRAWING SIZE:

PROJECT NO.

OFSHEET

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D R E V

D A

TE

D E S C R

IP

T

IO

N

D R A W

IN

G

R E V

IS

IO

N S

C H K

B Y

D R A W N

B Y

D S G N

B Y

I

R A

D

M A

N

COM

MO

IT Y

B I L

A P P R O V E D

B Y

F O R

J O

IN

T

B A S E

C H A R L E S T O N

D A T E

G

E W

B

A IR AS

I N 62 8T H

D W

G C

O N

S U

LT

IN

G E

N G

IN

E

E R

S , I

N C

A

N N

A K

N A

P P

B

LV

D

S U

IT

E

M T

. P

LE

A S

A N

T , S

C

JO

IN

T B

AS

E

C H

AR

LE

S

TO

N

C H A R L E S T O N S C

M004

H

VA

C C

O N

TR

O

LS

D

ET

AI

LS

W D

B W

D B

M A

U

/0

2/

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

Fa ci lit y

Fa ci lit y

Fa ci lit y

Fa ci lit y

DKFX 08110306

NOT TO SCALEM004

1 AHU11 VAV AHU SCHEMATIC DIAGRAM AND SEQUENCE OF OPERATION

NOT TO SCALEM004

2 AHU12 CONSTANT VOLUME SCHEMATIC DIAGRAM AND SEQUENCE OF OPERATION

3" CHWS

3" CHWR

CH11

AHU11

AHU12

NOTES:

ISOLATION VALVES, BALANCING

VALVES, CONTROL VALVES AND

OTHER PIPE FITTINGS AND

DEVICES ARE NOT SHOWN FOR

CLARITY. REFER TO DETAILS AND

DRAWINGS FOR ADDITIONAL

INFORMATION.

A M

IL

I

L W

BA

D E N

I

A

I I

R

L L

DG

No.

TU

D S

IS

R

E T

E

AA

30241

RE

G E

ER

IN

E N

L

RCAH

ORP

SEF

OL

N

S IO

IN

O

I

R A

D

M A

N

COM

MO

IT Y

B I L

A/E SEAL

A

B

C

D

A

B

C

D

4 5321

21 3 4 5

IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

OFSHEET

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D

D A T E

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

D R A W

IN

G

R E V

IS

IO

N S

D A T E

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

ANSI D (22"x34")DRAWING SIZE:

PROJECT NO.

OFSHEET

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D R E V

D A

TE

D E S C R

IP

T

IO

N

D R A W

IN

G

R E V

IS

IO

N S

C H K

B Y

D R A W N

B Y

D S G N

B Y

I

R A

D

M A

N

COM

MO

IT Y

B I L

A P P R O V E D

B Y

F O R

J O

IN

T

B A S E

C H A R L E S T O N

D A T E

G

E W

B

A IR AS

I N 62 8T H

D W

G C

O N

S U

LT

IN

G E

N G

IN

E

E R

S , I

N C

A

N N

A K

N A

P P

B

LV

D

S U

IT

E

M T

. P

LE

A S

A N

T , S

C

JO

IN

T B

AS

E

C H

AR

LE

S

TO

N

C H A R L E S T O N S C

M010

M

EC

H

AN

IC

AL

I

SO

M

ET

RI

C

W D

B W

D B

M A

U

/0

2/

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

Fa ci lit y

Fa ci lit y

Fa ci lit y

Fa ci lit y

DKFX 08110306

NOT TO SCALEM010

1 MECHANICAL ISOMETRIC

MECHANICAL

YARD

MECHANICAL

ROOM

ELECTRICAL

ROOM

3" CHWS

3" CHWR

2 1/2" CHWS

2 1/2" CHWR

C H

W R

C H

W S

CH11

CCC12

CCC11

53" CHWS

3" CHWR

8 9

AS11

E15

AHU11

AHU12

MECHANICAL

YARD

MECHANICAL

ROOM

ELECTRICAL

ROOM

TRANSFORMER

PAD

CU PAD

FLAT

CONCRETE

PAD

6" HIGH

CONCRETE PAD

RAISED TANK

ENCLOSURE

AHU11

AHU12

AC12

AC11 A

M

IL

I

L W

BA

D E N

I

A

I I

R

L L

DG

No.

TU

D S

IS

R

E T

E

AA

30241

RE

G E

ER

IN

E N

L

RCAH

ORP

SEF

OL

N

S IO

IN

O

I

R A

D

M A

N

COM

MO

IT Y

B I L

A/E SEAL

A

B

C

D

A

B

C

D

4 5321

21 3 4 5

IF SHEET IS LESS THAN 22"x34" (ANSI D) IT IS A REDUCED PRINT, SCALE ACCORDINGLY.

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

OFSHEET

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D

D A T E

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

D R A W

IN

G

R E V

IS

IO

N S

D A T E

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

ANSI D (22"x34")DRAWING SIZE:

PROJECT NO.

OFSHEET

D E

P A

R

TM

E N

T O

F

TH

E A

IR

F

O R

C E

A

IR

M O

B

IL

IT

Y

C O

M M

A N

D R E V

D A

TE

D E S C R

IP

T

IO

N

D R A W

IN

G

R E V

IS

IO

N S

C H K

B Y

D R A W N

B Y

D S G N

B Y

I

R A

D

M A

N

COM

MO

IT Y

B I L

A P P R O V E D

B Y

F O R

J O

IN

T

B A S E

C H A R L E S T O N

D A T E

G

E W

B

A IR AS

I N 62 8T H

D W

G C

O N

S U

LT

IN

G E

N G

IN

E

E R

S , I

N C

A

N N

A K

N A

P P

B

LV

D

S U

IT

E

M T

. P

LE

A S

A N

T , S

C

JO

IN

T B

AS

E

C H

AR

LE

S

TO

N

C H A R L E S T O N S C

M101

M

EC

H

AN

IC

AL

P

LA

N

W D

B W

D B

M A

U

/0

2/

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

JB

C

AB

B ld g Ae ri al D el iv er y

Fa ci lit y

Fa ci lit y

Fa ci lit y

Fa ci lit y

DKFX 08110306

SCALE: 1/8" = 1'10"M101

2 MECHANICAL RENOVATION PLAN

PROVIDE NEW CONCRETE PAD 6" LARGER THAN THE CHILLER IN ALL DIRECTIONS.

PROVIDE PENETRATION THROUGH BRICK WALL ADJACENT TO EXISTING REFRIGERANT LINE PENETRATIONS. SEAL PENETRATION

WEATHER TIGHT.

EXTERIOR CHILLED WATER LINES SHALL BE INSULATED WITH CELLULAR GLASS INSULATION, AND PROVIDED WITH AN ALUMINUM JACKET.

PROVIDE VERTICAL RISER CLAMPS WHERE CHILLED WATER LINES RISE UP WALL TO ABOVE HEAD HEIGHT.

INTERIOR CHILLED WATER LINES SHALL BE INSULATED WITH CELLULAR GLASS INSULATION WITH ALL SERVICE JACKET.

INSTALL NEW CHILLED WATER COIL IN EXISTING AIR HANDLER CABINET IN PLACE OF REMOVED REFRIGERANT COIL. COORDINATE WITH AHU MANUFACTURER (TRANE) FOR SPECIFIC INSTRUCTIONS INCLUDING HOW TO SECURE THE COIL WITHIN THE UNIT. ANY DAMAGE TO

THE EXISTING UNIT DUE TO THE COIL REPLACEMENT SHALL BE REPAIRED.

PROVIDE 1.5" COPPER CONDENSATE DRAIN LINES TO EXISTING FLOOR DRAIN.

PROVIDE NEW TRACER CONTROL PANEL THAT INTERFACES WITH EXISTING TRANE BUILDING CONTROLS, EXISTING METASYS VAV CONTROLLERS, NEW CHILLER, NEW COOLING COIL, EXISTING AIR HANDLERS, AND EXISTING BASE WIDE EMCS.

CHEMICAL TREATMENT POT FEEDER, SEE DETAIL.

PROVIDE HEAT TRACE TO EXTERIOR CHILLED WATER PIPING.

PROVIDE FREEZE STAT TEMPERATURE SENSOR THAT UPON SENSING AIR LOWER THAN 40°F (ADJ.) SHALL INITIATE THE FOLLOWING SEQUENCE: SHUT DOWN AIR HANDLER FAN, CLOSE OUTSIDE AIR DAMPER, OPEN UP CHILLED WATER VALVE 100%, SHUT DOWN CHILLER COMPRESSOR, TURN ON PUMP TO FULL SPEED, NOTIFY THE DDC SYSTEM OF AN ALARM CONDITION.

PROVIDE 8' HIGH VINYL COATED CHAIN LINK FENCE TO CONNECT EXISTING FENCE TO BUILDING TO PROVIDE MECHANICAL ENCLOSURE.

SEE FENCE DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

GROUND PIPE SUPPORT, SEE DETAIL FOR ADDITIONAL INFORMATION.

CONNECT TO EXISTING DOMESTIC WATER PIPING IN THIS APPROXIMATE LOCATION, DOWNSTREAM OF THE BACKFLOW PREVENTER.

ROUTE MAKE1UP WATER ASSEMBLY TO AIR SEPARATOR, SEE DETAIL FOR ADDITIONAL INFORMATION.

PROVIDE EMERGENCY HVAC SHUTDOWN SWITCH.

AS PART OF TEST AND BALANCE PORTION OF WORK, BALANCE FAN MOTOR BY ADJUSTING THE VFD AND PROVIDING AN AIR TRAVERSE IN THE EXISTING SUPPLY DUCTWORK. AIRFLOW SHALL BE BALANCED TO THE AIRFLOWS INDICATED IN THE COOLING COIL SCHEDULE.

PROVIDE AIR BALANCE INFORMATION AND VFD HZ SETTING AS PART OF BALANCING REPORT.

RENOVATION KEYED NOTES

SCALE: 1/8" = 1'10"M101

1 MECHANICAL DEMOLITION PLAN

DEMOLISH AND REMOVE CONDENSING UNIT AND

ASSOCIATED REFRIGERANT LINES, INSULATION, AND

SUPPORTS. REFRIGERANT SHALL BE RECOVERED AND

TURNED OVER TO THE OWNER.

DEMOLISH AND REMOVE DIRECT EXPANSION (DX)

COOLING COILS. AIR HANDLER SHALL REMAIN IN USE

FOLLOWING RENOVATION; THEREFORE ANY DAMAGE

TO THE AIR HANDLER THAT OCCURS DURING COIL

REPLACEMENT SHALL BE REPAIRED AT NO ADDITIONAL

COST TO THE OWNER.

CUT CONDUITS, REBARS, SCREWS AND UNISTRUT THAT

ARE PROTRUCING UP THROUGH SLAB. CONDUITS

SHALL BE FILLED TO PREVENT FURTHER WATER

INTRUSION.

DEMOLITION KEYED NOTES

PHASING DESCRIPTION:

EXISTING DX UNITS SHALL REMAIN OPERATIONAL AS

LONG AS POSSIBLE, AND PROVISIONS SHALL BE

IMPLEMENTED TO REDUCE HVAC SYSTEM DOWNTIME

AS MUCH AS POSSIBLE. BEFORE DEMOLITION OF SPLIT

SYSTEMS AND DX COOLING COILS OCCURS, THE

FOLLOWING SHALL BE COMPLETE:

1. CONCRETE PAD AND CHILLER SHALL BE SET.

2. CHILLER SHALL BE POWERED PER

REQUIREMENTS ON ELECTRICAL DRAWINGS.

3. CHILLED WATER LINES SHALL BE INSTALLED,

SUPPORTED, PRESSURE TESTED, AND

INSULATED ADJACENT TO EXISTING

REFRIGERANT LINES TO THE AIR HANDLERS.

4. REPLACEMENT CHILLED WATER COILS SHALL BE

ON SITE AND READY FOR INSTALLATION ONCE DX

COILS HAVE BEEN REMOVED.

5. CHILLED WATER COIL CONNECTIONS WITH

FITTINGS AND DEVICES PER DETAIL SHALL BE

PRE1FABRICATED TO ALLOW QUICK

INSTALLATION ONCE COILS HAVE BEEN

REPLACED.

6. DDC CONTROLS PANEL SHALL BE SET, POWERED,

PROVIDED WITH DATA, CONDUIT RUN,

CONDUCTORS PULLED. SEQUENCES SHALL BE

PRE1INSTALLED ON CONTROL PANEL TO MINIMIZE

IN1FIELD PROGRAMMING REQUIREMENTS.

Sheets
M001 - HVAC NOTES, SCHEDULES, & LEGENDS
M002 - HVAC NOTES & DETAILS
M003 - HVAC DETAILS
M004 - HVAC CONTROLS DETAILS
M010 - MECHANICAL ISOMETRIC
M101 - MECHANICAL PLAN

File details come from the government source that posted it.