Addendum_1_FA4418-19-R-A0004.pdf
PDF 249 KB Posted
- Solicitation number
- FA4418-19-R-A004
About this file
Addendum 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_Questions.pdf | ||
| 30_Nov_18_(Correct)_General_Drawings.pdf | ||
| Specifications_.pdf | ||
| Electrical_Drawings.pdf | ||
| AF_Form_66.pdf | ||
| Mechanical_Drawings.pdf | ||
| Wage_Determination.pdf | ||
| Solicitation_-_FA441819RA0040001.pdf | ||
| General_Drawings.pdf | ||
| Green_Procurement_Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1
Pre-Award
HVAC Renovation For Bldg. 174 Aerial Delivery
DKFX 08-10306
Joint Base Charleston ABW
South Carolina
13 Dec 2018
1. Contractor’s personnel and all subcontractor’s personnel that will be operating a vehicle or equipment on the airfield (inside flight line fence) are required to attend flight line driver training. The only exception to this will be haulers (truck driver), who will be escorted on and off the airfield by someone with proper flight line certification. Vehicular traffic inside the flight line fencing should be kept to a minimum.
2. At the start and completion of each work day the contractor’s superintendent will check in and out with Airfield Management.
This is to occur in person at Bldg 169.
3. Drawing sheet M101, Detail 2: Delete the requirement to install the emergency HVAC shutoff switch (E-stop) located just inside the Mechanical Room door. The switch will instead be installed at the end of the main corridor where shown on sketch below.
E
E
MECH ROOM
40FT
Fire Wall
E-Stop
50FT
4. E-stop will be mounted a minimum of 6” from the corner wall and 6” from any existing switch. Mounting height will be 48” from floor to the center of the E-stop. Detail for existing interior wall where E-stop is to be mounted is shown below.
Interior Wall Section
5. Conduit and circuit for E-stop will be routed from Mech. Room, above ceiling of “Break Room” and/or Bathrooms then down through cavity of interior wall. There is no ceiling in the Mech. Room.
The wall separating the Mech. Room and the breakroom is fire rated and the penetration shall be as detailed below.
Fire Wall Section Fire Wall Penetration Detail