Pre-bid_QA_FA4418-17-R-0003_12_Jan.pdf

PDF 12 KB Posted

Attached to
Add/Rpr IMC Fire Suppression System Federal contract opportunity
Solicitation number
FA4418-16-R-0028
Issued by
Department of the Air Force Air Mobility Command

About this file

Question and answers dated 12 Jan 2017 for FA4418-17-R-0003 Add/ Rpr IMC Fire suppression system

View the file

Other files for this federal contract opportunity

Other files attached to Add/Rpr IMC Fire Suppression System, newest first.
File Type Posted
Attachment__9_Addendum__2_dated_15_Feb_17..pdf PDF
Attachment__13_Specification_Section_26_42_15.00_10_CATHODIC_PROTECTION_SYSTEM_(STEEL_WATER_TANKS)_dated_15_Feb_17.pdf PDF
Attachment__11_Drawing_35_SB-101_Structural_Plan,_Elevations_and_Details_rev.01_Dated_13_Feb_17..pdf PDF
Attachment__10_Specification_Section_28_31_76_JB_CHS_INTERIOR_FIRE_ALARM_AND_MASS_NOTIFICATION_SYSTEM_Dated_15_Feb.pdf PDF
Attachment__12_Specification_Section_33_16_15_WATER_STORAGE_STEEL_TANKS_dated_15_Feb_17.pdf PDF
FA4418-17-R-0003-0007.pdf PDF
FA4418-17-R-0003-0006.pdf PDF
FA4418-17-R-0003-0005.pdf PDF
FA4418-17-R-0003-0004.pdf PDF
Attachment__8_-_FA4418-17-R-0003_Section_26_42_15.00_10_CATHODIC_PROTECTION_SYSTEM_(STEEL_WATER_TANKS).pdf PDF
Attachment__6_-_FA4418-17-R-0003_Davis_Bacon_Wage_Determination_dated_6_Jan_2017.pdf PDF
Attachment__7_-_FA4418-17-R-0003_Addendum__1_dated_12_Jan_17.pdf PDF
FA4418-17-R-0003-0003.pdf PDF
Pre-bid_QA_FA4418-17-R-0003_11_Jan.pdf PDF
FA4418-17-R-0003-0002.pdf PDF
Pre-bid_QA_FA4418-17-R-0003_10_Jan_2017.pdf PDF
FA4418-17-R-0003-0001.pdf PDF
Site_Visit_Attendees_Sign-In_Sheet_-_Fire_Supp._Sys.pdf PDF
Site_Visit_Briefing_Slides_-_Fire_Supp._Sys.pdf PDF
Site_Visit_Minutes_-_Fire_Supp_Sys.pdf PDF
Attachment__1_-_FA4418-17-R-0003_Specifications,_IMC_Fire_Suppression_dated_Oct_2013.pdf PDF
Attachment__4_-_FA4418-17-R-0003_FAA_Form_7460-2_dated_Oct_2013.pdf PDF
Attachment__3_-_FA4418-17-R-0003_FAA_Form_7460-1_dated_Fed_2012.pdf PDF
Attachment__5_-_FA4418-17-R-0003_Green_Procurement_Form_dated_Dec_2016.pdf PDF
Attachment__2_-_FA4418-17-R-0003_Drawings,_AddRepair_IMC_Fire_Suppression_System.pdf PDF
FA4418-17-R-0003.pdf PDF
Attachment__6_-_FA4418-17-R-0003_Davis_Bacon_Wage_Determination_dated_Aug_2016.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Wage Rates. General Decision Number: SC160048 08/26/2016 SC48. This “Construction Type: Heavy” does not list wage rates for electricians, masons/cement workers, painters, or welders. Please provide a wage decision including the trade categories that will most likely perform the work for this project.

Wage determination SC160048 08/26/2016 SC48 will be removed and replaced with SC170030 01/06/2017 SC30. This will be incorporated in a forthcoming Addendum.

2. “Buy American Clause”. On page 42/50 of the RFP the full text of FAR 52.225-9 is included. This clause restricts “The Contractor shall use only domestic construction material in this contract.” Section K, Clauses Incorporated by Reference, pages 30-31/50 includes reference to other “Buy American Clause(s)”, including 52.225-6 which allows a wide range of Trading Partners. These clauses conflict with each other. Please indicate the correct clause for this project.

52.225-6, Trade Agreements Certificate only applys to contracts containing the clause 52.225-5 Trade Agreements.

File details come from the government source that posted it. Updated .