Attachment__11_Drawing_35_SB-101_Structural_Plan,_Elevations_and_Details_rev.01_Dated_13_Feb_17..pdf

PDF 896 KB Posted

Attached to
Add/Rpr IMC Fire Suppression System Federal contract opportunity
Solicitation number
FA4418-16-R-0028
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment #11 Drawing 35_SB-101 Structural Plan, Elevations and Details rev.01 Dated 13 Feb 17 for FA4418-17-R-0003-0007 Add-Rpr IMC Fire Suppression System

View the file

Other files for this federal contract opportunity

Other files attached to Add/Rpr IMC Fire Suppression System, newest first.
File Type Posted
Attachment__9_Addendum__2_dated_15_Feb_17..pdf PDF
Attachment__13_Specification_Section_26_42_15.00_10_CATHODIC_PROTECTION_SYSTEM_(STEEL_WATER_TANKS)_dated_15_Feb_17.pdf PDF
Attachment__10_Specification_Section_28_31_76_JB_CHS_INTERIOR_FIRE_ALARM_AND_MASS_NOTIFICATION_SYSTEM_Dated_15_Feb.pdf PDF
Attachment__12_Specification_Section_33_16_15_WATER_STORAGE_STEEL_TANKS_dated_15_Feb_17.pdf PDF
FA4418-17-R-0003-0007.pdf PDF
FA4418-17-R-0003-0006.pdf PDF
FA4418-17-R-0003-0005.pdf PDF
FA4418-17-R-0003-0004.pdf PDF
Attachment__6_-_FA4418-17-R-0003_Davis_Bacon_Wage_Determination_dated_6_Jan_2017.pdf PDF
Attachment__7_-_FA4418-17-R-0003_Addendum__1_dated_12_Jan_17.pdf PDF
Attachment__8_-_FA4418-17-R-0003_Section_26_42_15.00_10_CATHODIC_PROTECTION_SYSTEM_(STEEL_WATER_TANKS).pdf PDF
FA4418-17-R-0003-0003.pdf PDF
Pre-bid_QA_FA4418-17-R-0003_12_Jan.pdf PDF
Pre-bid_QA_FA4418-17-R-0003_11_Jan.pdf PDF
FA4418-17-R-0003-0002.pdf PDF
Pre-bid_QA_FA4418-17-R-0003_10_Jan_2017.pdf PDF
FA4418-17-R-0003-0001.pdf PDF
Site_Visit_Attendees_Sign-In_Sheet_-_Fire_Supp._Sys.pdf PDF
Site_Visit_Briefing_Slides_-_Fire_Supp._Sys.pdf PDF
Site_Visit_Minutes_-_Fire_Supp_Sys.pdf PDF
Attachment__4_-_FA4418-17-R-0003_FAA_Form_7460-2_dated_Oct_2013.pdf PDF
Attachment__3_-_FA4418-17-R-0003_FAA_Form_7460-1_dated_Fed_2012.pdf PDF
Attachment__1_-_FA4418-17-R-0003_Specifications,_IMC_Fire_Suppression_dated_Oct_2013.pdf PDF
Attachment__5_-_FA4418-17-R-0003_Green_Procurement_Form_dated_Dec_2016.pdf PDF
Attachment__2_-_FA4418-17-R-0003_Drawings,_AddRepair_IMC_Fire_Suppression_System.pdf PDF
FA4418-17-R-0003.pdf PDF
Attachment__6_-_FA4418-17-R-0003_Davis_Bacon_Wage_Determination_dated_Aug_2016.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S T

R U

C T

U R

A L

P

L A

N S

E

L E

V A

T I O

N S

A

D

E T

A I L S

SB-101

B J Z

J R

M L V

P

RECORD DRAWING DATE

ARCH30 E(30X42)DRAWING SIZE:

PROJECT NO.

SHEET

SEAL AREA

D R

A W

I N

G

R

E V

I S

I O

N S

P R

P

B

Y A

P P

R D

RECORD DRAWING DATE

ARCH30 E(30X42)DRAWING SIZE:

PROJECT NO.

SHEET

D E

P A

R T

M E

T

O

F

T

H

I R

F

R

C E

A

M

B

I L I T

Y

C

O M

M A

N D

R E

V

D A

T E

D E

S C

R I P

T I O

N

D R

A W

I N

G

R

E V

I S

I O

N S

C H

K

B

Y

D R

A W

N

B

Y

D S

G

B

Y

S U

P V

C

G

R

C H

A R

L E

S T

O N

S

C

J O

I N

T

B

A S

E

C

H A

R L E

S T

I R

A T

R I A

X P

L L C

V E

N

E

H

I C

K O

R Y

N

C

L V

P T

L K

J M

DKFX 11-1005 A/B

D A

T E

R E

P A

I R

A

M

C

F

I R

E

S

U P

P R

E S

S I O

N

S

Y S

T E

M

B J Z

M D

L

F

I N

S

I G

N

C

O N

S T

R U

C T

I O

N

D

O C

S

Attachment #11 FA4418-17-R-0003

AutoCAD SHX Text

150,000 GALLON CAPACITY WATER TANK

AutoCAD SHX Text

PILES. SEE FOUNDATION PLAN

AutoCAD SHX Text

RING WALL

AutoCAD SHX Text

14"X14" PRE-STRESSED CONCRETE PILE (TYP)

AutoCAD SHX Text

CENTERLINE OF INTERIOR PILE RING

AutoCAD SHX Text

CENTERLINE OF EXTERIOR PILE RING

AutoCAD SHX Text

14"X14" PRE-STRESSED CONCRETE PILE

AutoCAD SHX Text #6 @ 18" O.C.

AutoCAD SHX Text #6 @ 9" O.C.

AutoCAD SHX Text

(2) #5 CONTINUOUS. LAP SPLICE @ 24"

AutoCAD SHX Text

FINISHED GRADE

AutoCAD SHX Text #5 @ 12" O.C.

AutoCAD SHX Text #4 @ 10" O.C.

AutoCAD SHX Text

SCALE: 1/2" = 1'-0"

AutoCAD SHX Text

TANK RING FOUNDATION PLAN

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FOUNDATION SECTION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SB101

AutoCAD SHX Text

SCALE: 1/2" = 1'-0"

AutoCAD SHX Text

TANK ELEVATION

AutoCAD SHX Text

AutoCAD SHX Text TANK INSTALLATION STRUCTURAL NOTES 1. BOTTOM OF MAT FOUNDATION SHALL BE PLACED ON COMPACTED SOILS WITH A MINIMUM BOTTOM OF MAT FOUNDATION SHALL BE PLACED ON COMPACTED SOILS WITH A MINIMUM BEARING CAPACITY OF 2,000 PSF. 2. ALL CONCRETE SHALL DEVELOP A COMPRESSIVE STRENGTH OF 4000 PSI @ 28 DAYS. ALL CONCRETE SHALL DEVELOP A COMPRESSIVE STRENGTH OF 4000 PSI @ 28 DAYS. 3. ALL REINFORCING STEEL SHALL CONFORM TO ASTM SPECIFICATIONS FOR A-615 GRADE 60. ALL REINFORCING STEEL SHALL CONFORM TO ASTM SPECIFICATIONS FOR A-615 GRADE 60. 4. FOUNDATION DESIGN SHALL BE BASED ON THE ALLOWABLE SOIL BEARING PRESSURE PER THE FOUNDATION DESIGN SHALL BE BASED ON THE ALLOWABLE SOIL BEARING PRESSURE PER THE GEOTECHNICAL ENGINEER'S REPORT PREPARED BY ECS DATED 1-30-12 AND LETTER DATED 2-20-2012. 5. ALL BACKFILL SHALL BE COMPACTED TO 98% STANDARD PROCTOR. ALL BACKFILL SHALL BE COMPACTED TO 98% STANDARD PROCTOR. 6. BACKFILL VOLUME SHALL BE KEPT TO A MINIMUM. BACKFILL VOLUME SHALL BE KEPT TO A MINIMUM. 7. FOUNDATION CONCRETE SHALL BE PLACED IN ACCORDANCE WITH ACI 301. FOUNDATION CONCRETE SHALL BE PLACED IN ACCORDANCE WITH ACI 301. 8. AREA AROUND TANK SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AWAY FROM TANK. AREA AROUND TANK SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AWAY FROM TANK. 9. TOP OF FOUNDATION SHALL BE GRADED AT A SLOPE OF 1" PER 10' TOWARDS THE OUTER TOP OF FOUNDATION SHALL BE GRADED AT A SLOPE OF 1" PER 10' TOWARDS THE OUTER TANK WALL TO PROVIDE POSITIVE WATER FLOW INSIDE THE TANK TO THE SUCTION LINES. 10. LADDERS, CONNECTION, MANWAYS, SAFETY APPURTENANCES, ETC. NOT SHOWN. TANK LADDERS, CONNECTION, MANWAYS, SAFETY APPURTENANCES, ETC. NOT SHOWN. TANK MANUFACTURER SHALL PROVIDE SHOP DRAWINGS FOR ALL REQUIRED ITEMS. ALL SAFETY ITEMS SHALL MEET OSHA REQUIREMENTS TO INCLUDE LADDERS, FALL PROTECTION CABLES AND ANTI-CLIMB DEVICES. 11. PILES ARE SPACED AS SHOWN SO AS TO LIMIT THE LOAD CARRIED BY EACH PILE. PILES ARE SPACED AS SHOWN SO AS TO LIMIT THE LOAD CARRIED BY EACH PILE. 15. SEVERAL OVER LENGTH PILES SHOULD BE DRIVEN PRIOR TO THE START OF PRODUCTION PILE SEVERAL OVER LENGTH PILES SHOULD BE DRIVEN PRIOR TO THE START OF PRODUCTION PILE DRIVING TO ESTABLISH THE DRIVING CRITERIA, PILE LENGTHS TO BE ORDERED AND TO DETERMINE IF AUGER "PILOT" HOLES ARE JUSTIFIED. FOR BIDDING PURPOSES THE CONTRACTOR SHOULD ASSUME THAT PILOT HOLES ARE REQUIRED. PRODUCTION PILES SHOULD NOT BE ORDERED UNTIL THE PILE LENGTHS CAN BE VERIFIED. TWO TEST PILES ARE RECOMMENDED FOR EACH WATER TANK. A PILE SHOULD BE DRIVEN AT BOTH ENDS OF EACH TANK. 16. PILES ARE TO BE DRIVEN TO AN ESTIMATED DEPTH OF 45 FEET OR AS DETERMINED BY TEST PILES ARE TO BE DRIVEN TO AN ESTIMATED DEPTH OF 45 FEET OR AS DETERMINED BY TEST PILES. PILES TO PROVIDE ALLOWABLE AXIAL COMPRESSION CAPACITY OF 60 TONS, ALLOWABLE AXIAL TENSION CAPACITY OF 30 TONS, AND ULTIMATE LATERAL SHEAR CAPACITY OF 12 TONS. 17. PILE DRIVING HAMMER SHALL HAVE A MINIMUM ENERGY OF 22,000 FOOT/POUNDS. PILE DRIVING HAMMER SHALL HAVE A MINIMUM ENERGY OF 22,000 FOOT/POUNDS. 18. DRIVING CRITERIA AND BEARING ELEVATIONS SHOULD BE ESTABLISHED DURING PILE DRIVING CRITERIA AND BEARING ELEVATIONS SHOULD BE ESTABLISHED DURING PILE INSTALLATION AND PDA TESTING. 19. THE OVER LENGTH PILES COULD BE DRIVEN IN PRODUCTION PILE LOCATIONS. ALL PILE THE OVER LENGTH PILES COULD BE DRIVEN IN PRODUCTION PILE LOCATIONS. ALL PILE INSTALLATION OPERATIONS AND PDS TESTING SHOULD BE MONITORED BY A SENIOR SOIL TECHNICIAN WORKING UNDER THE SUPERVISION OF A LICENSED ENGINEER. 20. FILL BETWEEN TANK BOTTOM AND SLAB AND TANK CONNECTION TO SLAB TO BE IN FILL BETWEEN TANK BOTTOM AND SLAB AND TANK CONNECTION TO SLAB TO BE IN ACCORDANCE WITH AWWA D100-11. 21. PENETRATIONS THROUGH THE RING WALL ARE PERMITTED SO LONG AS REBAR IS NOT CUT. PENETRATIONS THROUGH THE RING WALL ARE PERMITTED SO LONG AS REBAR IS NOT CUT. 22. PROVIDE A 2"x4" KEY AND CONTINUOUS PVC WATERSTOP AT THE JOINT WHERE THE RING PROVIDE A 2"x4" KEY AND CONTINUOUS PVC WATERSTOP AT THE JOINT WHERE THE RING WALL AND MAT MEET.

AutoCAD SHX Text

6302 FAIRVIEW ROAD #600 CHARLOTTE, NC 28210 E-MAIL: ZAPATA@ZAPATAINC.COM

AutoCAD SHX Text

PHONE: (704) 358-8240 FAX: (704) 358-8342 WEB SITE: WWW.ZAPATAINC.COM

AutoCAD SHX Text NOTE 1. ALL #6 REBAR TO HAVE A CLASS B TENSION LAP SPLICE OF 48". DO NOT SPLICE BARS ALL #6 REBAR TO HAVE A CLASS B TENSION LAP SPLICE OF 48". DO NOT SPLICE BARS DIRECTLY OVER A PILE.

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text Y

AutoCAD SHX Text B

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text Y

AutoCAD SHX Text B

AutoCAD SHX Text I

AutoCAD SHX Text

Sheets and Views
SB101

File details come from the government source that posted it. Updated .