Solicitation Amendment FA441721R00170001 SF 30.pdf

PDF 205 KB Posted

Attached to
Base Supply Services
Solicitation number
FA441721R0017
Issued by

About this file

This solicitation requests proposals for base supply services at Hurlburt Field, Florida. The contractor shall provide all non-personal services including personnel, equipment, supervision, and other items and services necessary to perform base supply functions such as quality assurance, inventory, document control, hazardous materials management, central repair facility operations, and delivery services. Proposals are due by 4:00 PM Central Time on 24 September 2021. The Department of the Air Force Special Operations Command will evaluate proposals and make award to the responsible offeror whose proposal conforms to the solicitation and provides the best value to the government based on technical and price factors. The period of performance is one base year with four one-year options. Pricing shall be provided for fixed-price contract line items. Teaming agreements must comply with applicable federal regulations and clearly define roles and responsibilities.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

1 10

0001 21 Sep 2021

FA4417

FA4417 1 SOCONS LGC

350 TULLY ST BLDG 90339

CP 850 884 7602

HURLBURT FIELD, FL 32544-5810

UNITED STATES

Lacey Shalenko, Email: lacey.shalenko@us.af.mil Telephone: 579-7691

FA441721R0017

24 Aug 2021

See Section G

See Schedule

Charles Carnley Email: charles.carnley@us.af.mil Telephone: 850-884-1258

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this Amendment is to update Section L of the Solicitation and incorporate Block 14 (Description of Amendment/Modification):

updated PWS, dated 21 September 2021. The PWS changes are minor and are highlighted in the PWS.

1. Section L, Instructions, Conditions, and Notices to Offerors has been changed.

Paragraph 1.10 has been changed from "must also be small when combined in the aggregate of all teaming affiliates" To " must also meet the SBA teaming affiliates requirements as defined in 13 CFR 121.103.

Paragraph 4.1.3 has been changed from "Complete Section A, Contractor Information, of Attachment 4, Past/Present Performance Questionnaire" and "Evaluators are only allowed to use the Attachment 4, Past Performance Questionnaire" to "Complete Section 1, Contract Identification, of Attachment 3, Past/Present Performance Questionnaire" and "Evaluators are only allowed to use the Attachment 3, Past Performance Questionnaire."

2. PWS dated 21 September 2021 is hereby incorporated. The following were changed:

a. Paragraphs 1.5.3.1 and 1.7.5.1 were added.

b. Paragraph 1.7.7 was updated to add the following: "The contractor shall ensure assets are properly protected from the elements as needed."

c. The HFI listed in paragraphs 1.7.9, 1.7.10, 1.7.11 was changed to HFI 23-101, After-Hours / DMS / Delivery.

d. HFI 23-101 Materiel Management (General After Hours, Decentralized Maintenance Support (DMS) & Delivery) Supply Support was added to Appendix 6, Applicable Publications and Forms.

e. Attachment 6 - SS #6: Delivery (Checklist #6), was updated at Inspection Items 8, 9, and 10.

Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

CIN 00000000000006611845

INFORMATION FROM TO

CIN 00000000000006611846

Option Line Item 1001

INFORMATION FROM TO

CIN 00000000000006611847

List of Attachments

The following attachments were added:

PWS-FA441721R0017-dated 21Sep21

The following attachments were deleted:

PWS - FA441721R0017 - dated 11Aug21

Miscellaneous text in this section has been modified to:

1. Performance Work Statement (PWS): dated 21 September 2021

2. Financial Institution Reference Sheet (FIRS)

3. Past Performance Questionnaire (PPQ)

4. DD 254

5. Collective Bargaining Agreement (CBA): dated 11 November 2019

FA441721R00170001

Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

1.0. GENERAL INSTRUCTIONS

1.1. The offeror's proposal must include all data and information requested by these Instructions to Offerors and must be submitted in accordance with these instructions. The offer shall be compliant with the requirements as stated in the Performance Work Statement (PWS) and Solicitation. Non-conformance with the instructions provided in these Instructions to Offerors may result in an unfavorable proposal evaluation.

1.2. The proposal acceptance period is 120 calendar days past the due date of this solicitation.

1.3. All referenced documents for this solicitation are available on the SAM.gov website at https://sam.gov/.

Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.

1.4. The Government reserves the right to revise or amend the PWS or the solicitation prior to the proposal closing time. Such revisions or amendments will be communicated by amendments to the Request for Proposal (RFP) and posted on the SAM.gov website. If such amendments require material changes in quantities or prices, the proposal closing date may be postponed by enough days to enable offerors to revise their proposals. In such cases, the amendment will include an announcement of the new closing date and time. Offerors MUST acknowledge all amendments in their proposal (Volume III), either by providing signed copies of the amendments with their proposal, or by separate letter which includes a reference to the solicitation and amendment numbers.

1.5. The Contracting Officer listed below is the Government's sole point of contact for this acquisition. Address any questions or concerns you may have to the Contracting Officer. Written requests for clarification must be sent to the Contracting Officer at the following email address:

Charles Carnley - charles.carnley@us.af.mil

1.6. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain copy of all unsuccessful proposals.

1.7. The Contracting Officer will promptly notify offerors of any decision to exclude them from the competition, whereupon, they may request and receive a debriefing in accordance with FAR 15.505. Excluded offerors may request a preaward debriefing or they may choose to wait until after the source selection decision to request a post award debriefing. However, excluded offerors are entitled to no more than one debriefing for each proposal. The Contracting Officer will notify unsuccessful offerors of the source selection decision in accordance with FAR 15.503. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR

15.505 or 15.506, as applicable.

1.8. If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer in writing with supporting rationale as well as the remedies the offeror is asking the Contracting Officer to consider as related to the claimed omission or error. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions. This reservation includes matters of additional or substitute pages of the initial proposal.

1.9. The Contracting Officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the Contracting Officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.

1.10. Who Can Participate. Proposals may only be submitted by 8(a) Program Small Businesses. At the time of initial contract offer and at time of award, each business must be in the 8(a) Program. In order to submit an offer on a solicitation, each business concern in a teaming agreement must be a small business under the designated NAICS size standard, and must also meet the SBA teaming affiliates requirements as defined in 13 CFR 121.103.

2.0. SPECIFIC INSTRUCTIONS

The following instructions are to aid in the evaluation process.

2.1. Offerors are responsible for submitting proposals (including any revisions, and amendments) so as to reach the Government office designated in this solicitation by the time specified in this solicitation. Only electronic versions of the proposals will be accepted. Paper copies of proposals or proposals sent via email will not be evaluated, will be rejected, and will not be considered for award. Proposals may be submitted electronically in one of the following three ways:

2.1.1. Contractors may submit proposals electronically to the Government via the DoD SAFE site (https://safe.

apps.mil/). If submitting via DoD Safe site, the offeror shall send an email requesting an "Electronic Drop Authorization" to both of the personnel listed below no later than (NLT) 48 hours prior to proposal due date /time. All documents submitted must be saved in .pdf format, and shall follow the instructions in 2.5 below.

Title of the documents should include the offerors CAGE code (i.e., "Vol 1 Tech Proposal CAGE#").

Charles Carnley - charles.carnley@us.af.mil Lacey Shalenko - lacey.shalenko@us.af.mil

2.1.2. Proposals may be hand carried submissions of compact disks (CDs) containing electronic files. All documents must be in .pdf format and shall follow the instructions in 2.1.4 below. Title of the documents should include the offerors CAGE code (i.e., "Vol 1 Tech Proposal CAGE#"). The physical address for hand carried deliveries is 350 Tully Street, Building 90339, Hurlburt Field, Florida 32544. Contractors should request base access for hand carried proposal delivery NLT 24 hours prior to the proposal due date/time by sending an email request identifying the company name and list of individuals requesting access to the Contracting Officer identified in para 1.1.5 in the previous section.

2.1.3. Proposals may also be submitted by mail to the 1st Special Operations Contracting Squadron at Hurlburt Field, Florida. Mailed proposals must be on compact disk (CD) and all files must be in .pdf format. Title of the documents should include the offerors CAGE code (i.e., "Vol 1 Tech Proposal CAGE#"). Proposals must be submitted by the time specified in this solicitation when mailing in proposals. The address for proposal submission is:

1st Special Operations Contracting Squadron /PKA Attention: Charles M. Carnley 350 Tully Street Hurlburt Field, FL 32544

2.2. Any proposal, modification, or revision, that is received at the designated Government office after the exact time specified for receipt of proposals will be "late" and will not be considered unless the Contracting Officer determines the criteria set forth in FAR 15.208 exists.

2.3. Proposals shall be complete, clearly presented, and include sufficient detail for effective evaluation as detailed in section M of this solicitation and for substantiating validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but rather provide convincing rationale to clearly demonstrate how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of the offeror's facilities and/or experience and will rely heavily, on the information presented in the offeror's proposal. Proposals shall be neat, indexed (cross-indexed as appropriate) and assembled electronically in an orderly manner. Elaborate artwork and expensive visual and other presentation aids are neither necessary nor desired. Include only information that is relevant to this source selection.

2.4. Organization/Number of Copies/Page Limits. A complete proposal shall consist of three (3) volumes:

Volume I, Technical Proposal, Subfactor 1, Subfactor 2, and Subfactor 3; Volume II (a), Past Performance;

Volume II (b), Signed Teaming Agreement (if applicable); and Volume III, Cost/Price Proposal (Executed RFP Documents)/Contractor Responsibility. Specific guidance regarding the content of each volume will be discussed further below. Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal. When Evaluation Notices (ENs) are necessary, the Government will issue them by electronic means to prospective offerors. Page limitations may be placed on responses to these ENs and such limitations will be provided at the time the EN is issued.

2.5. Electronic Page Size, Format and Limit. An electronic page is defined as each face of an 8 1/2" X 11" electronic sheet of paper containing information. Page limits apply to all electronic files whether submitted via DoD SAFE or compact disk (CD). Pages in excess of the maximum page limits defined below will not be evaluated. For the purposes of formatting, the type font shall not be less than 12 pitch. Pages shall be numbered sequentially by volume.

Volume I - Technical Proposal: 40 Page Limit Subfactor 1 - Management Plan: 20 Page Limit

a. Quality Assurance (QA)

b. Inventory

c. Document Control

d. Hazardous Materials (HAZMART) Pharmacy

e. Central Repair Facility (CRF)

f. Delivery Subfactor 2 - Transition Plan: 10 Page Limit Subfactor 3 - Quality Control Plan: 10 Page Limit

Volume II (a) - Past Performance: 20 Page Limit Volume II (b) - Signed Teaming Agreement (required if proposing a teaming agreement): No Page limit

Volume III - Cost/Price Proposal and Contractor Responsibility: No Page Limit

2.5.1. All pages of each part shall be appropriately numbered and identified with the Request for Proposal (RFP) number. Pages in excess of the maximum will not be evaluated.

2.5.2. Cost or Pricing Related Data. All cost and/or pricing data shall ONLY be addressed in the Cost/Price Proposal Volume.

2.5.2. Indexing. Electronic files should be titled appropriately so as to easily discern each volume as outlined in

2.5. Each file shall contain a more detailed table of contents to delineate the subparagraphs within that file. Tab indexing shall be used to identify sections. Indexing is not included in the page limitations.

2.5.2. Proposal Acceptance Period. The proposal acceptance period is 120 calendar days past the due date of this solicitation. By signing block 30a of the SF 1449, the offeror certifies that the proposal is valid from for 120 calendar days past the solicitation due date.

3.0. FACTOR 1, VOLUME 1 - TECHNICAL PROPOSAL

The technical proposal shall be prepared in accordance with these instructions and shall be evaluated in accordance with the evaluation criteria and evaluation standards in Section M, Evaluation Factors for Award.

Technical proposals shall include necessary information to enable the evaluators to form a definitive conclusion concerning the offeror's ability to perform the requirements outlined in the PWS.

(Submit one (1) original and one (1) sanitized copy with CAGE code only in place of Company Name).

Sanitized copy shall be provided as a separate file name. (i.e., "Subfactor 1 Sanitized Tech Proposal CAGE#").

Sanitized copy shall include all subfactors.

3.1. Subfactor 1 - Management Plan. Offerors shall submit a Management Plan that clearly demonstrates offeror's understanding of the managing and staffing requirements of the PWS, specifically addressing each of the following six (6) functions: Quality Assurance (QA), Inventory, Document Control, Hazardous Materials (HAZMART) Pharmacy, Central Repair Facility (CRF), and Delivery.

The Management Plan shall include an organizational chart that identifies key personnel such as the on-site contract manager, alternate contract manager(s), and all other personnel offerors propose to manage and staff this requirement. The organization chart shall also identify the number and labor category of personnel proposed, and a narrative description for each duty title on the organizational chart.

3.1.1. The Management Plan shall demonstrate how the contractor will recruit, retain, and replace sufficient personnel who have the knowledge, experience, training, qualifications, technical expertise, certifications, and security clearances commensurate with the requirements to perform Base Supply services as required in the

PWS.

3.1.2. The Management Plan shall detail how the number and labor category of personnel proposed and proposed supplies will meet duties described in sections 1.2, 1.3, 1.4, 1.5, 1.6, 1.7, 1.8 and 1.9 of the PWS.

3.1.3. The Management Plan shall address how the offeror plans to meet and maintain the qualifications for each designated job description outlined in paragraphs 1.2.10, 1.3.12, 1.4.8, 1.5.11, 1.6.8, 1.7.19 of the PWS. The Management Plan shall also address how the offer will meet and maintain the secret security clearance requirements and the guidelines of the required DD Form 254 detailed in paragraphs 4.2 through 4.2.1.2, 4.8.1 and 4.8.2 of the PWS.

3.1.4. The Management plan shall address any risks that are considered likely to have a significant adverse impact to schedule, or performance.

3.1.5. The Management Plan shall identify key performance measures and objectives and shall state the process for taking those measurements and making organizational, operational, and personnel changes necessary to maintain compliance with all regulations identified in the PWS.

3.1.6. The Management Plan shall identify how the offeror intends to continue uninterrupted services during personnel absences, such as sickness, vacations, etc. without any degradation in services provided.

3.2. Subfactor 2 - Transition Plan. Offerors shall provide a Transition Plan that details how the offeror intends to manage, staff, schedule (to include milestones), and complete all required tasks within 30 days of contract award and be able to perform IAW the PWS on the first day of the performance period without degradation in service from the previous contract; and include, in the plan, the number and labor category of personnel to be used.

3.3. Subfactor 3 - Quality Control Plan. Offerors shall submit a written plan clearly describing the Quality Control Procedures the offeror plans use to ensure compliance with PWS paragraph 4.3 and Service Summary (PWS section 2.0).

3.3.1. The offeror shall identify the procedures the offeror plans to use to analyze, prevent and monitor defects in the quality of service performed as well as corrective actions which shall be performed to ensure non-performance and continual repeat of defective services do not occur, and compliance with the contract terms and conditions.

3.3.2. The Quality Control Plan shall include a detailed schedule of inspections that the offeror plans to conduct per month, quarter and year.

4.0. FACTOR 2, VOLUME II - PAST PERFORMANCE

Submit one (1) copy. Volume II (a) is limited to 20 pages and Volume II (b) - Signed Teaming Agreement has no page limit. Past Performance Questionnaires and Contractor Performance Assessment Reporting System (CPARS) evaluations are not included in the page limitation.

4.1. Volume II (a) - Past Performance. Offerors shall provide adequate past performance information on completed or current contracts (including Federal, State, local government and private) considered most relevant in demonstrating the ability to perform the proposed work as identified within the PWS. Offerors must provide past performance information to establish Recency and Relevancy on all Federal contracts before State, local government or private contracts. The Government's evaluation of past performance information will take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects (See Teaming Agreements, para 4.2), when such information is relevant to the instant acquisition. Offerors are required to explain what aspects of each contract are deemed relevant to complexity and magnitude as related to the requirements of this solicitation and in accordance with Section M. Failure to provide required relevancy description may impact the confidence rating, (i.e. aspects of previous projects should match work elements identified in the Solicitation/PWS).

4.1.1. Provide a summary of the previous contracts described above, not to exceed 2 pages of past performance information per reference. The summary should explain what aspects of each contract are deemed recent and relevant as related to the requirements of this solicitation and in accordance with Section M. Failure to provide required relevancy description may impact the confidence rating, (i.e. aspects of previous projects should match work elements identified in the solicitation/PWS). The maximum number of past performance references shall not exceed 10. The summary should not exceed 2 pages per reference (maximum total of 20 pages) and include:

a) Name of project (Contract number, if applicable)

b) Name and address of customer or Government agency

c) Name, telephone, fax number and/or email of customer contact or contracting officer

d) Dollar value

e) Period of performance/Completion date

f) Description of work performed, and how the effort performed is relevant as outlined in solicitation Section M paragraph 4.2.2.

g) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions

4.1.2. Each proposal shall provide current and relevant information regarding an offeror's actions under previously awarded contracts.

a) Recency Assessment An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past three (3) years from the issuance month of this solicitation. Past performance information that fails this condition will not be evaluated.

b) Relevancy Assessment The Government will conduct an in-depth evaluation of all recent performance information obtained to determine how closely the Base Supply Services performed under those contracts relate to the scope, magnitude /complexity, contract environment and the cost/price factors of the Hurlburt Field AFB requirement. For each recent or current past performance citation reviewed, the relevance of the work performed will generally be assessed for the scope, magnitude/complexity and contract environment aspects (however, all aspects of performance that relate to this acquisition may be considered). Consideration will be given to efforts that are considered to be of the type that are similar in scope, magnitude/complexity, and contract environment when compared to the services described in this solicitation. A relevancy determination of the offeror's past performance will be made based upon the aforementioned considerations, including joint venture partner(s). In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror or teaming partner whose contract is being reviewed and evaluated. The past performance questionnaires and information obtained from other sources will be used to establish the degree of relevancy of past performance.

4.1.3. Complete Section 1, Contract Identification, of Attachment 3, Past/Present Performance Questionnaire and mail, or email the attached Past/Present Performance Questionnaire to all past performance references in the list you provide and instruct them to return the completed questionnaire to the individual(s) indicated in paragraph 4.1.4 below. Evaluators are only allowed to use the Attachment 3, Past Performance Questionnaire.

Altered or substituted questionnaires will not be evaluated. Also, Past Performance Questionnaires will only be accepted electronically by email from Project Owners or their authorized representatives. Past Performance Questionnaires will not be accepted from Prime Contractors, Subcontractors, or Manufacturers. Offerors are responsible to ensure questionnaires are transmitted to their references, and to indicate which references the questionnaire was sent to.

4.1.4. Inform your references that they shall forward questionnaires electronically by email directly to the address below. Questionnaires must be received in the 1st Special Operations Contracting Squadron office not later than the closing date of the solicitation. Offerors are responsible for ensuring their references transmit the questionnaire to the Contracting Office. In lieu of a Past/Present Performance Questionnaire, if a project is currently available in the Past Performance Information Retrieval System (PPIRS), the contractor should attach the evaluation to the questionnaire with the relevant solicitation number and submit directly to the 1st Special Operations Contracting Squadron office before the official closing date and time. Electronic submissions shall be sent to:

Charles Carnley - charles.carnley@us.af.mil Lacey Shalenko - lacey.shalenko@us.af.mil

4.1.5. Lack of any past performance will not automatically disqualify an offeror, but it is a factor that is considered in the Best Value Performance Price Tradeoff Source Selection described in Section M.

4.1.6. If the offeror claims there is no past performance, then that status must be identified to the contracting officer not later than the date/time proposals are due from all offerors.

4.2. Volume II (b) Signed Teaming Agreement. If Teaming Agreements are contemplated they must comply with the appropriate Federal Regulations (13 C.F.R. Part 121 (Size Regulations), Part 124 (8(a) & SDB), Part 125 (Government Contracting Programs), and/or Part 126 (HUBZone). The teaming members must provide complete information as to relevant and recent past performance information on previous teaming agreements. If this is a first time joint effort, each party to the teaming agreement must provide information on all relevant contracts as specified in paragraph 4.1. The maximum number of references combined shall not exceed 10 total.

4.2.1. The Government will recognize the integrity and validity of formal contractor teaming agreements;

provided, the agreements are identified and company relationships are fully disclosed in an offer. A teaming agreement must establish each party's role in the proposal preparation process and will be incorporated into the contract. Failure to clearly define roles and/or provide a teaming agreement with a proposal shall make teaming arrangements and related subcontractor past performance ineligible for evaluation and consideration of award.

The prime contractor shall remain fully responsible for contract performance, regardless of any teaming agreement between the prime contractor and its subcontractors. Teaming Agreements must provide the following information as part of their proposal, Volume II (b), not later than the date/time proposals are due:

4.2.2. Clearly establish roles of each party (who is prime and who is subcontractor, who is responsible for what tasks, contract administration, proposals, work management, etc.)

4.2.3. Provide for protection of competition-sensitive proprietary information. (Subcontractor past performance cannot be disclosed to the prime offeror without the subcontractor's consent). Provide a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor, only if it is being used as part of the past performance evaluation.

4.2.4. Identify each member's share of the prospective contract, 50/50, 51/49, etc.

4.2.5. Exclusivity. Assurance that the team member will not be replaced for the duration of the contract; any exceptions should be identified. Assurance that the team members are not teaming with another firm for the same procurement.

4.2.6. Statement of acknowledgement that the Prime Contractor is responsible for adhering to contract terms and conditions and daily management. The Prime Contractor is obligated to negotiate in good faith and responsible for conveying mandatory government terms and conditions to subcontractors.

4.2.7. The prime contractor shall remain fully responsible for contract performance, regardless of any teaming agreement between the prime contractor and its subcontractors.

4.2.8. At the time of initial contract offer and at time of award, each business must be a small business. In order to submit an offer on a contract, each business concern in a teaming agreement must be a small business under the designated NAICS size standard, and must also be small when combined in the aggregate of all teaming affiliates.

5.0. FACTOR 3, VOLUME III - PRICE/COST PROPOSAL

Submit the Standard Form 1449 and all pages originally included in the RFP. Submit one (1) copy.

5.1. Complete blocks 12, 17a, and 30a-c of the SF 1449, Solicitation, Offer, and Award. An authorized official of the firm submitting the offer must sign and date the SF 1449 in block 30a-c. (In doing so, the offeror accedes to the contract terms and conditions as written in the RFP, Sections A through K).

5.2. Insert prices in Section B for each Contract Line Items Number (CLIN), including all options. All line items Unit Price and Total Amount must be filled in. Total Amount extended price must equal whole dollar unit price multiplied by the number of units. Failure to provide prices for all line items may eliminate an offer from competition.

5.3. Complete representations and certifications in Section K or the System for Award Management (SAM). If representations and certifications are accomplished in SAM, FAR 52.212-3(b)(2) must be completed and included with proposal.

5.4. Submit the Financial Reference Worksheet (Attachment 2) with the top portion only completed.

5.5. Acknowledgement of all amendments referenced in paragraph 1.4 and 7.0.

6.0. RELATIONSHIP BETWEEN INSTRUCTIONS AND EVALUATION

Your attention is directed to the functional relationship between Sections L and M of this solicitation. Section L provides information for the purpose of organizing the proposal and is not intended to be all-inclusive. Section M describes evaluation factors for award. Since the Government evaluation of proposals will cover areas identified in Section M, proposals should address all such areas of evaluation.

7.0. AMENDMENT OF SOLICITATION PRIOR TO CLOSING

The Government reserves the right to revise or amend the performance work statement, or the solicitation prior to the proposal closing time. Such reservations or amendments will be communicated by amendments to the Request for Proposal (RFP) and posted on the SAM.gov website (https://sam.gov/). If such amendments require material changes in quantities or prices, the proposal closing date may be postponed by enough days to enable offerors to revise their proposals. In such cases, the amendment will include an announcement of the new closing date and time. Offerors MUST acknowledge all amendments in their proposal, either by providing signed copies of the amendments with their proposal, or by separate letter which includes a reference to the solicitation and amendment numbers. Amendments must be included with Volume III.

8.0. PRE-PROPOSAL CONFERENCE/SITE VISIT

A pre-bid/pre-proposal conference will be conducted at:

1 SOCONS, 350 Tully Street Bldg. 90339, Hurlburt Field, FL 8 September 2021 at 9:00 AM CST

Please submit the names of all attendees (not to exceed two) to Lacey Shalenko via e-mail at lacey.shalenko@us.

af.mil and Charles Carnley via e-mail at charles.carnley@us.af.mil no later than 10:00 AM CST on 7 September 2021. This information must be provided in advance in order to ensure access to the military base/conference site and adequate seating for the conference attendees. A bus will be provided for transportation around the base.

All interested parties must obtain a visitor pass from the 1 SOSFS/VCC Visitor Control Center prior to obtaining base access. Please arrive early and plan accordingly to ensure on time arrival to the site visit. Once all questions are answered, interested parties will have the opportunity to visit a few facilities. Interested parties will be transported with CONS and customer personnel. The visit will conclude back at Bldg. 90339. Please contact the following personnel for questions regarding this requirement:

Lacey Shalenko: (850) 884-7691 or lacey.shalenko@us.af.mil Charles Carnley: (850) 884-1258 or charles.carnley@us.af.mil

9.0. QUESTIONS

All questions regarding this solicitation must be submitted in writing. All questions and subsequent answers will be posted to the SAM.gov website https://sam.gov/. It is the responsibility of the contractor to continuously monitor the site for updates. To mitigate the risks associated with the cancellation of this solicitation due to untimely submission of questions, all questions must be submitted electronically to the individual(s) listed below no later than close of business 5 business days after the site visit. Any questions submitted after this period may not be answered.

Charles Carnley - charles.carnley@us.af.mil Lacey Shalenko - lacey.shalenko@us.af.mil

File details come from the government source that posted it. Updated .