FA441721B0003 - Questions and Answers - Part 1.pdf
PDF 142 KB Posted
- Attached to
- Convert Bldg 91157 from Storage Warehouse to Testing Lab Federal contract opportunity
- Solicitation number
- FA441721B0003
About this file
This document contains questions and answers regarding Solicitation Number FA441721B0003 to convert Building 91157 from a storage warehouse to a testing lab for the Department of the Air Force Special Operations Command. The questions and answers provide clarification on requirements such as confirming the building does not currently have sewer service so no bypass pumping is needed; specifying the new lift station must be operational before removing the existing one or a temporary pumping system must be provided; and noting the communication line at the site is either direct buried or in conduit rather than a concrete duct bank. Contractors are responsible for submitting digging permits and protecting any marked utilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA441721B0003 - Questions and Answers - Part 2.pdf | ||
| Attachment 7 - Drawings - Revised (Addendum 1).pdf | ||
| Addendum 1 - Drawings Changes.pdf | ||
| Addendum 1 - Specs Changes.pdf | ||
| Solicitation Amendment 2 - FA441721B00030002 SF 30.pdf | ||
| Attachment 6 - Specifications - Revised (Addendum 1).pdf | ||
| CE Response - Site Visit Questions.pdf | ||
| Site Visit Sign In Sheet - 25 August 2021.pdf | ||
| Memo for Record - FA441721B0003 Pre-Proposal Conference_Site Visit - 25 August 2021.pdf | ||
| Solicitation Amendment 1 - FA441721B0003 SF 30.pdf | ||
| Attachment 4 - DBA Wage Determination FL20210217.pdf | ||
| Solicitation - FA441721B0003.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| Attachment 5 - Financial Institution Reference Sheet.pdf | ||
| Attachment 3 - Working Time Analysis.pdf | ||
| Attachment 2 - Drawings.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference: FA441721B0003 HF Convert B91157 - RFI # 1
1. Item 3 in the Work Time Analysis it references Demolition & Structural Preparatory work to receive Hoist System. Should this say lift station or are we missing information about a hoist system that is required?
ANSWER: Item 3 should say “Secure Material/Equipment”.
2. Is the new lift station to be in operation prior to removal of the existing or are we to provide a temporary holding/pumping system?
ANSWER: The existing lift station needs to remain operation until the new lift station is operational, or the contractor will need to provide temporary holding/pumping system for existing flows until new lift station is operational. Either is acceptable.
3. Please confirm building 91157 will not require a bypass pumping system during the sewer line install, In other words, the building is tied to a sewer line elsewhere.
ANSWER: Bldg 91157 does not currently have a sewer system. No bypass pumping is required for this facility.
4. What size is the new 2” waterline to be connected to?
ANSWER: The 2” waterline will be connected to an existing 6” water main.
5. According to drawings C102 and C201 the only other utilities shown is just one comm line
a. Is this comm line in a concrete duct bank? Information is needed for the size of the duct duck back in order to provide ample shoring while digging under the line.
ANSWER: The comm. is not in a concrete duct bank. It is either direct buried or in conduit.
b. Due to the cost associated with digging around and under existing utilities, please confirm GPR has already been done in this area.
ANSWER: Contractor will be required to submit a digging permit prior to starting work so that all the utilities in this area get marked. It will be contractor’s responsibility to protect those utilities.