Attachment 3 - Working Time Analysis.pdf

PDF 77 KB Posted

Attached to
Convert Bldg 91157 from Storage Warehouse to Testing Lab
Solicitation number
FA441721B0003
Issued by

About this file

This document provides a working time analysis for contract CP1031923 to repair and convert Building 91157 from a storage warehouse to a material testing laboratory and replace an existing lift station for the Department of the Air Force Special Operations Command. The analysis outlines a 120 calendar day performance period comprised of five items including mobilization, design submittal and review, securing materials and equipment and performing demolition and preparatory structural and electrical work to receive a hoist system, performing gravity sewer and lift station removal and replacement, and correcting punch list items. Allowable calendar days range from 5 days for mobilization to 59 days for performing gravity sewer and lift station removal and replacement.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORKING TIME ANALYSIS

CP1031923 REPAIR – CONVERT BLDG 91157 FROM STORAGE WAREHOUSE TO

MATERIAL TESTING LAB + REPLACE EXISTING LIFT STATION

ITEM NO: DESCRIPTION ALLOWABLE CALENDAR DAYS

1. Mobilization 5

2. Design Submittal & Review Process 14

3. Secure Material/Equipment – Perform Demolition & 28 Structural/Electrical Preparatory Work to Receive Hoist System

4. Perform Gravity Sewer & Lift Station Removal & Replacement 59

5. Correct Punch List ltems 14

TOTAL ALLOWABLE CONTRACT TIME 120