Atch_7_-_Past_Performance_Questionnaire.pdf

PDF 286 KB Posted

Attached to
Design/Build Mezzanine Bldg 90005 Federal contract opportunity
Solicitation number
FA4417-15-R-0041
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 7

View the file

Other files for this federal contract opportunity

Other files attached to Design/Build Mezzanine Bldg 90005, newest first.
File Type Posted
Award_Notice_FA4417-15-C-0035.pdf PDF
RFI_Answers_-_Post_date_2_Sep_2015.pdf PDF
RFI_Answers_-_Post_date_1_Sep_2015.pdf PDF
25_Aug_Site_Visit_FA4417-15-R-0041.pdf PDF
15-1077_RFP6_RR_PLAN _SCHEDS__(revised_21_Aug_15).pdf PDF
Hurlburt_Standard_Specs_(minus_residential)_updated_24_Aug_2015.pdf PDF
01_10_10_Design_Requirements_24_Aug_15.docx DOCX document
01_10_10_Attch_B_FTEV_15-1077_Data_Wall_Basis_of_Design.pdf PDF
15-1077_RFP3_FLOOR_PLAN2__(revised_21_Aug_15).pdf PDF
Bldg_90005_Mezzane_Structural_As-builts.pdf PDF
01_10_10_Attch_A_FTEV_15-1077_furniture_Basis_of_Design.pdf PDF
RFI_Answers_-_Post_date_25_Aug_2015.pdf PDF
15-1077_RFP2_DEMO_PLAN_(revised_21_Aug_15).pdf PDF
RFI_Answers_-_Post_Date_24_Aug_2015_(second_post_this_date).pdf PDF
RFI_Answers_-_Post_Date_24_Aug_2015.pdf PDF
CAD_15-1077_RFP3_FLOOR_PLAN2.dwg DWG drawing
CAD_15-1077_RFP8_COMM_2FLR.dwg DWG drawing
CAD_15-1077_RFP2_DEMO_PLAN.dwg DWG drawing
RFI_Answers_-_Post_Date_19_Aug_2015.pdf PDF
CAD_15-1077_RFP5_ACCESS_FLOOR.dwg DWG drawing
CAD_15-1077_RFP7_COMM_1FLR.dwg DWG drawing
CAD_15-1077_RFP6_RR_PLAN _SCHEDS.dwg DWG drawing
CAD_15-1077_RFP4_CEILING.dwg DWG drawing
CAD_15-1077_RFP1_TITLE.dwg DWG drawing
FA4417-15-R-0041_Amendment_1.pdf PDF
Site_Visit_FA4417-15-R-0041.pdf PDF
Atch_1_-_Section_01_10_10_35__Design_Submittal.pdf PDF
Atch_2_-_Section_01_10_12_Design_After_Award.pdf PDF
Atch_3_-_Section_01_10_10_Appendix_A.pdf PDF
Solicitation_FA4417-15-R-0041.pdf PDF
Atch_5_-_Drawings.pdf PDF
Atch_4_-_Hurlburt_Standard_Specs.pdf PDF
Atch_8_-_Financial_Questionnaire.pdf PDF
Atch_6_-_Wage_Rates.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

WHEN FILLED IN THIS DOCUMENT IS SOURCE SELECTION SENSITIVE INFORMATION IAW FAR 2.101 & 3.104

PAST/PRESENT PERFORMANCE QUESTIONNAIRE

FA4417-15-R-0041

ATTACHMENT 7

FOR OFFICIAL USE ONLY SOURCE SELECTION SENSITIVE – SEE FAR 3.104 Page 1

SECTION A: CONTRACTOR INFORMATION

1. Contractor’s Name and Address:

2. Point of Contact:

3. Phone Number:

4. Contract Number: Contract Type:

5. Period of Performance:

SECTION B: RESPONDENT INFORMATION (To Be Completed By Evaluation Respondent)

1. Respondent’s Company Name & Address:

2. Respondent’s Name:

3. Phone Number: Fax Number:

E-Mail:

4. Award Amount: Final Amount:

5. Project Title: Project Number:

7. Period of Performance:

Start Date: End Date:

6. Brief Project Description:

PAST/PRESENT PERFORMANCE QUESTIONNAIRE

FA4417-15-R-0041

FOR OFFICIAL USE ONLY SOURCE SELECTION SENSITIVE – SEE FAR 3.104 Page 2

SECTION C: EMAIL OR FAX COMPLETED QUESTIONNAIRE FORM TO:

Contract Specialist: TSgt Jillian Martinez

Email: Jillian.Martinez@us.af.mil

Contracting Officer: Shawn Edwards

Email: Shawn.Edwards.14@us.af.mil

OR

Fax: (850) 884-1272

THIS FORM MUST BE RETURNED NO LATER THAN: The closing date and time of solicitation.

SECTION D: PERFORMANCE INFORMATION: Choose letter on the scale that most accurately describes the contractor’s performance or situation. PLEASE PROVIDEA NARRATIVE EXPLANATION FOR ANY UNSATISFACTORY OR MARGINAL RATINGS.

E V S M U N

Exceptional (Outstanding)

Very Good (Above Average)

Satisfactory Marginal Unsatisfactory Not Available

Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective

Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear, or were, satisfactory.

Performance does not meet some contractual requirements.

The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions.

The Contractor’s proposed actions appear only marginally effective, or were not fully implemented does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective

No record of past performance or the record is inconclusive.

mailto:Jillian.Martinez@us.af.mil mailto:Shawn.Edwards.14@us.af.mil

PAST/PRESENT PERFORMANCE QUESTIONNAIRE

FA4417-15-R-0041

FOR OFFICIAL USE ONLY SOURCE SELECTION SENSITIVE – SEE FAR 3.104 Page 3

1. QUALITY: Access conformance to contract requirements, specifications and standards of Good Workmanship. Provided effective quality control which resulted in a quality finished product.

☐ Exceptional ☐Very Good ☐Satisfactory ☐Marginal ☐Unsatisfactory ☐Not Available

COMMENTS/REMARKS:

2. SCHEDULE: Developed realistic progress schedules and completed the project within the established schedule.

3. MANAGEMENT: Provided experienced superintendent, managers, and supervisors, with the technical and administrative abilities to meet requirements. Adequately coordinate and controlled performance of subcontractors.

Identified problems as they occurred. Suggested approaches to resolving problems. Displayed initiative and cooperation in solving problems. Provided adequate information and pricing for change orders and negotiated them in good faith. Provided timely resolution of punch list items and closeout documentation. Provided submittals in a timely manner. Submittals were well researched and clearly identified the proposed item.

PAST/PRESENT PERFORMANCE QUESTIONNAIRE

FA4417-15-R-0041

FOR OFFICIAL USE ONLY SOURCE SELECTION SENSITIVE – SEE FAR 3.104 Page 4

4. UTILIZATION OF SMALL BUSINESS: Contractor complied with terms and conditions for Small Business Participation. Achieved Small Business Goals.

5. REGULATORY COMPLIANCE: Contractor complied with Financial, Environmental, Safety, and Reporting Requirements. Contractor was compliant with labor standards, posting of EEO, labor rates, minimum wage.

Payrolls were completed properly and received in a timely matter. Paid subcontractors in a timely manner Contractor had an adequate safety plan and it was implemented properly. No safety discrepancies were noted.

6. LIQUIDATED DAMAGES: Was the contractor assessed liquidated damages? ☐YES ☐NO

(If Yes, briefly explain the circumstances)

7. Based on the contractor’s overall performance, would you rehire this contractor? ☐YES ☐NO

OVERALL PERFORMANCE RATING:

Signature of Respondent: ________________________________________________________ Date: ________________

File details come from the government source that posted it. Updated .