Attachment 5 - WD No MD080021 Construction Type Building Anne Arundel County.doc

DOC document 42 KB Posted

Attached to
Roofing IDC Federal contract opportunity
Solicitation number
FA4416-08-R-
Issued by
Department of the Air Force Headquarters District Washington

About this file

Attachment 5 - Wage Determination Anne Arundel County MD

View the file

Other files for this federal contract opportunity

Other files attached to Roofing IDC, newest first.
File Type Posted
Attachment 7 -Roof IDC Schedule of Material Submittals.xls XLS spreadsheet
FA4416-08-R-0008-P0002.doc DOC document
FA4416-08-R-0008-P0001.doc DOC document
Attachment 4a - Updated WD No MD080057 Construction type Building Prince George's County.doc DOC document
Attachment 2 - Pricing Schedule B.xls XLS spreadsheet
FA4416-08-R-0008.doc DOC document
Attachment 2 - Pricing Schedule B.xls XLS spreadsheet
Attachment 6 - Visitor Information.doc DOC document
Attachment 3 - Past Performance Questionnaire.doc DOC document
Attachment 4 - WD No MD080057 Construction type Building Prince George's County.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 – Wage Determination No. MD080021; Construction Type: Building; Anne Arundel County

General Decision Number: MD080021 05/16/2008 MD21

Superseded General Decision Number: MD20070021

State: Maryland

Construction Type: Building

County: Anne Arundel County in Maryland.

*EXCLUDING THE D.C. TRAINING SCHOOL BUILDING CONSTRUCTION

PROJECTS (Does not include single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 02/08/2008

1 04/04/2008

2 05/16/2008

ASBE0024-001 10/01/2007

Rates Fringes

Asbestos Worker/Heat and

Frost Insulator

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems..........$ 27.88 13.88

ASBE0024-002 10/01/2007

Rates Fringes

HAZARDOUS MATERIAL HANDLER

Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 17.95 6.50

ASBE0024-005 10/01/2007

Rates Fringes

Fire Stop Technician.............$ 22.95 6.39

Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.

BOIL0193-001 10/01/2007

Rates Fringes

Boilermakers:....................$ 32.06 16.46

BRMD0001-006 04/29/2007

Rates Fringes

TILE SETTER......................$ 24.50 6.05

ELEC0024-001 06/03/2007

Rates Fringes

Electricians.....................$ 29.65 5.25%+11.65

* IRON0016-006 04/01/2008

Rates Fringes

Glaziers.........................$ 26.73 14.10

Ironworkers, Structural..........$ 26.73 14.10

PLAS0891-003 05/01/2007

Rates Fringes

Cement Mason/Concrete Finisher...$ 26.15 6.01

* PLUM0486-001 04/01/2008

Rates Fringes

Plumber and Steamfitter..........$ 34.195 14.21

ROOF0030-012 05/01/2007

Rates Fringes

Roofers (Remainder of Area)......$ 23.80 7.86

ROOF0030-017 08/01/2007

Rates Fringes

Roofers:

East of the County Line, North of Highway No. 175 to Highway No. 178 to

Highway No. 50, then to

Highway No. 2 to West

Street, east to Bay Ridge to the Bay..................$ 22.45 5.25

SFMD0669-002 04/01/2008

Rates Fringes

Sprinkler Fitters................$ 29.35 14.30

SHEE0100-004 07/01/2007

Rates Fringes

Sheet Metal Worker...............$ 26.50 12.79

SUMD2002-001 01/08/2002

Rates Fringes

BRICKLAYER.......................$ 19.71

Carpenters: (Including

Drywall Hanging and

Acoustical Ceiling Work).........$ 15.91 3.62

Drywall Finishers................$ 13.02 3.94

Ironworkers: (Ornamental)........$ 27.25 2.95

Laborers:

Pipelayers..................$ 11.36 2.08

Unskilled...................$ 10.69 2.00

Power equipment operators:

Backhoes....................$ 15.08 2.62

Bulldozers..................$ 16.12

Loaders.....................$ 13.97

Rollers.....................$ 12.85

Scrapers....................$ 13.71 1.00

Tile Finishers...................$ 18.10

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .