Attachment 5 - WD No MD080021 Construction Type Building Anne Arundel County.doc
DOC document 42 KB Posted
- Attached to
- Roofing IDC Federal contract opportunity
- Solicitation number
- FA4416-08-R-
About this file
Attachment 5 - Wage Determination Anne Arundel County MD
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7 -Roof IDC Schedule of Material Submittals.xls | XLS spreadsheet | |
| FA4416-08-R-0008-P0002.doc | DOC document | |
| FA4416-08-R-0008-P0001.doc | DOC document | |
| Attachment 4a - Updated WD No MD080057 Construction type Building Prince George's County.doc | DOC document | |
| Attachment 2 - Pricing Schedule B.xls | XLS spreadsheet | |
| FA4416-08-R-0008.doc | DOC document | |
| Attachment 2 - Pricing Schedule B.xls | XLS spreadsheet | |
| Attachment 6 - Visitor Information.doc | DOC document | |
| Attachment 3 - Past Performance Questionnaire.doc | DOC document | |
| Attachment 4 - WD No MD080057 Construction type Building Prince George's County.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5 – Wage Determination No. MD080021; Construction Type: Building; Anne Arundel County
General Decision Number: MD080021 05/16/2008 MD21
Superseded General Decision Number: MD20070021
State: Maryland
Construction Type: Building
County: Anne Arundel County in Maryland.
*EXCLUDING THE D.C. TRAINING SCHOOL BUILDING CONSTRUCTION
PROJECTS (Does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 02/08/2008
1 04/04/2008
2 05/16/2008
ASBE0024-001 10/01/2007
Rates Fringes
Asbestos Worker/Heat and
Frost Insulator
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems..........$ 27.88 13.88
ASBE0024-002 10/01/2007
Rates Fringes
HAZARDOUS MATERIAL HANDLER
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 17.95 6.50
ASBE0024-005 10/01/2007
Rates Fringes
Fire Stop Technician.............$ 22.95 6.39
Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.
BOIL0193-001 10/01/2007
Rates Fringes
Boilermakers:....................$ 32.06 16.46
BRMD0001-006 04/29/2007
Rates Fringes
TILE SETTER......................$ 24.50 6.05
ELEC0024-001 06/03/2007
Rates Fringes
Electricians.....................$ 29.65 5.25%+11.65
* IRON0016-006 04/01/2008
Rates Fringes
Glaziers.........................$ 26.73 14.10
Ironworkers, Structural..........$ 26.73 14.10
PLAS0891-003 05/01/2007
Rates Fringes
Cement Mason/Concrete Finisher...$ 26.15 6.01
* PLUM0486-001 04/01/2008
Rates Fringes
Plumber and Steamfitter..........$ 34.195 14.21
ROOF0030-012 05/01/2007
Rates Fringes
Roofers (Remainder of Area)......$ 23.80 7.86
ROOF0030-017 08/01/2007
Rates Fringes
Roofers:
East of the County Line, North of Highway No. 175 to Highway No. 178 to
Highway No. 50, then to
Highway No. 2 to West
Street, east to Bay Ridge to the Bay..................$ 22.45 5.25
SFMD0669-002 04/01/2008
Rates Fringes
Sprinkler Fitters................$ 29.35 14.30
SHEE0100-004 07/01/2007
Rates Fringes
Sheet Metal Worker...............$ 26.50 12.79
SUMD2002-001 01/08/2002
Rates Fringes
BRICKLAYER.......................$ 19.71
Carpenters: (Including
Drywall Hanging and
Acoustical Ceiling Work).........$ 15.91 3.62
Drywall Finishers................$ 13.02 3.94
Ironworkers: (Ornamental)........$ 27.25 2.95
Laborers:
Pipelayers..................$ 11.36 2.08
Unskilled...................$ 10.69 2.00
Power equipment operators:
Backhoes....................$ 15.08 2.62
Bulldozers..................$ 16.12
Loaders.....................$ 13.97
Rollers.....................$ 12.85
Scrapers....................$ 13.71 1.00
Tile Finishers...................$ 18.10
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .