Attachment 2 - Pricing Schedule B.xls
XLS spreadsheet 81 KB Posted
- Attached to
- Roofing IDC Federal contract opportunity
- Solicitation number
- FA4416-08-R-
About this file
Attachment 2 - Pricing Schedule B spreadsheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4416-08-R-0008-P0002.doc | DOC document | |
| Attachment 7 -Roof IDC Schedule of Material Submittals.xls | XLS spreadsheet | |
| Attachment 4a - Updated WD No MD080057 Construction type Building Prince George's County.doc | DOC document | |
| FA4416-08-R-0008-P0001.doc | DOC document | |
| Attachment 2 - Pricing Schedule B.xls | XLS spreadsheet | |
| Attachment 5 - WD No MD080021 Construction Type Building Anne Arundel County.doc | DOC document | |
| FA4416-08-R-0008.doc | DOC document | |
| Attachment 6 - Visitor Information.doc | DOC document | |
| Attachment 3 - Past Performance Questionnaire.doc | DOC document | |
| Attachment 4 - WD No MD080057 Construction type Building Prince George's County.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule B
| Schedule B | |||||
| Pricing Schedule | |||||
| PROJECT AJXF 08-1552, ROOFING SYSTEMS | |||||
| Base Year | |||||
| Provide all plant, labor, equipment, materials and perform all operations required to repair and/or replace Built-Up Roofing (BURS), Standing Seam Metal Roofing (SSMR), Strip Shingles Roofing (SSR), Modified Bitumen Sheet Roofing (MBSR) System, in accordance with the applicable clauses, specifications and drawings for Projects AJXF 08-1552, Repair Roofs Multi-Facilities. The specific items include the following tasks: | |||||
| ITEM | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| 0001 | Built-up Roofing (BURS) Repair or Replace | ||||
| 0001AA | Reroof complete 4 ply built-up roof, aggregate surface without insulation demolish and remove one or two layers of existing BUR roofing membrane and install new 4 ply BUR roofing membrane | 3,200 | SQ | $ - 0 | |
| 0001AB | Repair 4 ply built-up roof, scrape layers of aggregate, flood coat with hot asphalt and spread new aggregate over the repaired area. | 1,000 | SQ | $ - 0 | |
| 0001AC | Replace deteriorated wood decking with 3/4" CD waterproof adhesive plywood | 10,000 | SF | ||
| 0001AD | Replace deteriorated wood decking with 1/2" CD waterproof adhesive plywood | 10,000 | SF | $ - 0 | |
| 0001AE | Replace deteriorated wood framing, cants, curbs, blocking, nailers, sleepers, edge strips using treated wood replacement. | 35,000 | BD FT | $ - 0 | |
| 0001AF | Replace gravel stop with 0.050" factory painted brown aluminum 6" high continuous cleat | 5000 | LF | $ - 0 | |
| 0001AG | Replace gravel stop with 0.050" factory painted brown aluminum 8" high continuous cleat | 4,000 | LF | $ - 0 | |
| 0001AH | Replace 0.040" factory painted brown aluminum counterflashing. | 5,000 | SF | $ - 0 | |
| 0001AJ | Replace gutter 0.050" factory painted brown aluminum box type, 5 inches complete with straps and fasteners assembly and expansion joint every 40 feet | 7,500 | LF | $ - 0 | |
| 0001AK | Replace gutter 0.050" factory painted brown aluminum box type, 6 inches complete with straps and fasteners assembly and expansion joint every 40 feet | 4,000 | LF | $ - 0 | |
| 0001AL | Replace fascia 0.050" factory painted brown aluminum | 4,000 | LF | $ - 0 | |
| 0001AM | Replace downspout with 3" x 4" factory painted brown aluminum 0.032" thick. | 3,200 | LF | $ - 0 | |
| 0001AN | Replace downspout with 4" x 6" factory painted brown aluminum 0.032" thick. | 5,000 | LF | $ - 0 | |
| 0001AP | Replace curb/coping/cap flashing, base flashing and trim 0.040" thick factory painted brown aluminum. Conceal fasteners and caulk joints. | 5,000 | SF | $ - 0 | |
| 0001AQ | Replace parapet coping, 16 gauge (0.50") factory painted brown aluminum. Conceal fasteners and caulk joints | 5,200 | SF | $ - 0 | |
| 0001AR | Remove and install new 4" cast iron roof drain with sump, deck clamp and strainer. | 50 | EA | $ - 0 | |
| 0001AS | Install insulation board, perlite thermal 1" thick | 380,000 | SF | $ - 0 | |
| 0001AT | Install insulation board, polyurethane or polyisocyanurate, one inch thick R7.1 | 380,000 | SF | $ - 0 | |
| 0001AU | Install 1/8" tapered insulation board | 40,000 | BF | $ - 0 | |
| 0001AV | Remove and replace bituminous flashing | 15,000 | SF | $ - 0 | |
| 0001AW | Provide and install new expansion joint with butyl or neoprene 0.42" aluminum flanges, open to 3-1/2 inches. | 275 | LF | $ - 0 | |
| 0001AX | Remove miscellaneous abandoned support structure, brackets, framing support and abandoned pitchpocket | 5,000 | LB | $ - 0 | |
| 0001AY | Snake, clean roof drains (100 ft to 300 ft length) | 4 | EA | $ - 0 | |
| 0001AZ | Replace pitch pockets 8" x 8" and fill with asphalt | 4 | EA | $ - 0 | |
| 0001BA | Replace pitch pockets 12" x 12" and fill with asphalt | 55 | EA | $ - 0 | |
| 0001BB | Repair, refill pitch pockets | 8 | EA | $ - 0 | |
| 0001BC | Reflash roof stack, install #4 lead plumbing stack flashing | 101 | EA | $ - 0 | |
| 0001BD | Replace drain clamping ring | 10 | EA | $ - 0 | |
| 0001BE | Replace drain strainer | 10 | EA | $ - 0 | |
| 0001BF | Install metal scuppers 6" x 6" and up to 10" x 12" | 10 | EA | $ - 0 | |
| 0001BG | Install service walkways/pads | 300 | SF | $ - 0 | |
| 0001BH | Remove/reinstall existing metal coping | 1,000 | LF | $ - 0 | |
| 0001BJ | Remove puff roof materials on existing roofing system | 50 | SQ | $ - 0 | |
| 0001BK | Provide asbestos testing | 10 | EA | $ - 0 | |
| 0001BL | Remove and dispose asbestos | 500 | SF | $ - 0 | |
| 0002 | Standing Seam Metal Roofing (SSMR) Repair or Replace | ||||
| 0002AA | Provide and install SSMR 0.040, 12 inch panel including anchor clips, hooks and fastener assembly. | 22,000 | SF | $ - 0 | |
| 0002AB | Provide and install ridge/hip flashing 18 gauge factory painted brown aluminum finished including ridge closure, hip closure and its fasteners | 100 | SF | $ - 0 | |
| 0002AC | Provide and install fascia/trim/cap flashing 18 gauge factory painted brown aluminum finished | 970 | LF | ||
| 0002AD | Provide and install plastic snow guard. | 1,800 | EA | $ - 0 | |
| 0002AE | Provide and install 2 " galvanized steel Z-purlins | 9,000 | LF | $ - 0 | |
| 0002AF | Provide and install continuous snow rail | 3,000 | LF | $ - 0 | |
| 0002AG | Provide and install continuous snow rail with ice-stopper | 3,000 | LF | $ - 0 | |
| 0002AH | Sawcut and remove existing SSMR | 1,000 | LF | $ - 0 | |
| 0002AI | Provide and install roof hatch for personnel or HVAC access | 2 | EA | $ - 0 | |
| 0002AJ | Provide and install elastomeric coating roof sealant along penetrations | 7,500 | SQ | $ - 0 | |
| 0002AK | Provide and install metal roof truss in accordance with the Unified Facilities Criteria (UFC) and local applicable codes | 300 | SQ | $ - 0 | |
| 0002AL | Professional engineer (PE) stamped designed drawings | 5 | EA | $ - 0 | |
| 0002AM | As-Built Drawings | 5 | EA | $ - 0 | |
| 0003 | Strip Shingles Roofing (SSR) Repair or Replace | ||||
| 0003AA | Reroof complete shingled roof with 235 lb/sq Class "A" asphalt shingles surfaced with mineral granules (remove one or two layers of existing shingles) | 180 | SQ | $ - 0 | |
| 0003AB | Replace drip edge, aluminum 0.040" thick, 5" girt factory painted brown aluminum | 4,000 | LF | $ - 0 | |
| 0003AC | Replace flashing/trim/valley 0.040" thick anodize brown aluminum | 4,000 | SF | ||
| 0003AD | Remove and replace crickets | 100 | EA | $ - 0 | |
| 0003AE | Replace wood trim, framing, board sheeting/fascia | 5,000 | BD FT | $ - 0 | |
| 0003AF | Paint new trim; one prime and one finish coat | 1,000 | SF | $ - 0 | |
| 0003AG | Replace and install new roof stack vent with rubber collar. | 80 | EA | $ - 0 | |
| 0003AH | Paint to match existing fascia, soffit and other paintable woodwork items. | 100 | SF | $ - 0 | |
| 0003AJ | Provide and install wood roof trusses spaced @ 24 inches o.c., 4 in 12 pitch, spanning from 20 ft to 30 ft, with a live load of 40 psf. | 300 | EA | $ - 0 | |
| 0003AK | Provide and install wood roof trusses spaced @ 24 inches o.c., 4 in 12 pitch, spanning from 20 ft to 30 ft, with a live load of 40 psf. | 300 | EA | $ - 0 | |
| 0003AL | Lifting and hoisting equipment rental per day, truck mounted up to 40 ton capacity | 26 | DAY | $ - 0 | |
| 0004 | Modified Bitumen Sheet Roofing (MBSR) System | ||||
| 0004AA | Remove existing one or two layers of roofing system, Provide and install three plies of MBSR. | 225 | SQ | $ - 0 | |
| 0004AB | Provide and install 3/4" conduit to existing electrical wiring laying on the roof | 500 | LF | $ - 0 | |
| 0004AC | Remove and replace worn out screws or fasteners with new screws having neoprene washers. | 25,000 | EA | $ - 0 | |
| 0004AD | Remove and replace foam closure. | 20,000 | LF | $ - 0 | |
| 0004AE | Remove and replace Pipe Flashing 90 mil | 500 | EA | $ - 0 | |
| 0004AF | Provide and install Uncured Neoprene 60 mil | 3,000 | SF | $ - 0 | |
| 0004AG | Provide and install 20 gauge metal to cover abandoned roof deck opening or abandoned penetrations. | 1,000 | SF | $ - 0 | |
| 0004AH | Remove loose, deteriorated cement/mortar from cracks/opening, apply non-shrink grout. | 500 | SF | $ - 0 | |
| 0004AJ | Provide and install ridge vent | 1,200 | LF | $ - 0 | |
| 0004AK | Replace deteriorated light weight conc plank 2-3/4 inch thick | 800 | SF | $ - 0 | |
| 0004AL | Provide and install 4" diameter C.I. Pipe to include 45 degree or 90 degree drainage elbow. | 60 | EA | $ - 0 | |
| 0004AM | Provide and install 4" C.I. Piping | 180 | LF | $ - 0 | |
| 0004AN | Provide and install 6" diameter C. I. Pipe to include 45 degree or 90 degree drainage elbow | 40 | EA | $ - 0 | |
| 0004AO | Provide and install 6" C. I. Piping | 300 | LF | $ - 0 | |
| 0004AP | Provide caulking at joint opening using high grade caulk | 3,000 | LF | $ - 0 | |
| 0004AQ | Provide brick wall waterproofing/sealant by brush application | 10,000 | SF | $ - 0 | |
| 0004AR | Provide brick wall waterproofing/sealant by roller application | 10,000 | SF | $ - 0 | |
| 0004AS | Provide brick wall waterproofing/sealant by spray application | 10,000 | SF | $ - 0 | |
| Base Year, Estimated Total | $ - 0 | ||||
| NOTE 1: Unlike firm-fixed price contracts, there will not be separate or lump sum payments for any bond, premiums, or other bond cost under the contract. Therefore, unit prices are to include all costs associated with the work element of the CLIN (including but not limited to all labor, material, general conditions, mobilizations, overhead, bond, profit, etc). | |||||
| NOTE 2: Contract performance time is 365 calendar days from contract award. Actual contract dates will be inserted at time of award. | |||||
| NOTE 3 : CLINS 0001BL, 1001BL, 2001BL, 3001BL, 4001BL are for removal and disposal of possible hazardous material in conjunction with the work. These CLINS will be utilized if the specific hazardous material is confirmed to be present at the job site and at a level deemed to be hazardous. | |||||
| Schedule B | |||||
| Pricing Schedule | |||||
| PROJECT AJXF 08-1552, ROOFING SYSTEMS | |||||
| Option Year I | |||||
| Provide all plant, labor, equipment, materials and perform all operations required to repair and/or replace Built-Up Roofing (BURS), Standing Seam Metal Roofing (SSMR), Strip Shingles Roofing (SSR), Modified Bitumen Sheet Roofing (MBSR) System, in accordance with the applicable clauses, specifications and drawings for Projects AJXF 08-1552, Repair Roofs Multi-Facilities. The specific items include the following tasks: | |||||
| ITEM | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| 1001 | Built-up Roofing (BURS) Repair or Replace | ||||
| 1001AA | Reroof complete 4 ply built-up roof, aggregate surface without insulation demolish and remove one or two layers of existing BUR roofing membrane and install new 4 ply BUR roofing membrane | 3,400 | SQ | $ - 0 | |
| 1001AB | Repair 4 ply built-up roof, scrape layers of aggregate, flood coat with hot asphalt and spread new aggregate over the repaired area. | 500 | SQ | $ - 0 | |
| 1001AC | Replace deteriorated wood decking with 3/4" CD waterproof adhesive plywood | 6,500 | SF | ||
| 1001AD | Replace deteriorated wood decking with 1/2" CD waterproof adhesive plywood | 6,500 | SF | $ - 0 | |
| 1001AE | Replace deteriorated wood framing, cants, curbs, blocking, nailers, sleepers, edge strips using treated wood replacement. | 30,000 | BD FT | $ - 0 | |
| 1001AF | Replace gravel stop with 0.050" factory painted brown aluminum 6" high continuous cleat | 4,000 | LF | $ - 0 | |
| 1001AG | Replace gravel stop with 0.050" factory painted brown aluminum 8" high continuous cleat | 3,800 | LF | $ - 0 | |
| 1001AH | Replace 0.040" factory painted brown aluminum counterflashing. | 4,800 | SF | $ - 0 | |
| 1001AJ | Replace gutter 0.050" factory painted brown aluminum box type, 5 inches complete with straps and fasteners assembly and expansion joint every 40 feet | 7,000 | LF | $ - 0 | |
| 1001AK | Replace gutter 0.050" factory painted brown aluminum box type, 6 inches complete with straps and fasteners assembly and expansion joint every 40 feet | 8,000 | LF | $ - 0 | |
| 1001AL | Replace fascia 0.050" factory painted brown aluminum | 3,000 | LF | $ - 0 | |
| 1001AM | Replace downspout with 3" x 4" factory painted brown aluminum 0.032" thick. | 3,000 | LF | $ - 0 | |
| 1001AN | Replace downspout with 4" x 6" factory painted brown aluminum 0.032" thick. | 4,600 | LF | $ - 0 | |
| 1001AP | Replace curb/coping/cap flashing, base flashing and trim 0.040" thick factory painted brown aluminum. Conceal fasteners and caulk joints. | 4,500 | SF | $ - 0 | |
| 1001AQ | Replace parapet coping, 16 gauge (0.50") factory painted brown aluminum. Conceal fasteners and caulk joints | 5,000 | SF | $ - 0 | |
| 1001AR | Remove and install new 4" cast iron roof drain with sump, deck clamp and strainer. | 50 | EA | $ - 0 | |
| 1001AS | Install insulation board, perlite thermal 1" thick | 340,000 | SF | $ - 0 | |
| 1001AT | Install insulation board, polyurethane or polyisocyanurate, one inch thick R7.1 | 340,000 | SF | $ - 0 | |
| 1001AU | Install 1/8" tapered insulation board | 20,000 | BF | $ - 0 | |
| 1001AV | Remove and replace bituminous flashing | 18,000 | SF | $ - 0 | |
| 1001AW | Provide and install new expansion joint with butyl or neoprene 0.42" aluminum flanges, open to 3-1/2 inches. | 2,400 | LF | $ - 0 | |
| 1001AX | Remove miscellaneous abandoned support structure, brackets, framing support and abandoned pitchpocket | 500 | LB | $ - 0 | |
| 1001AY | Snake, clean roof drains (100 ft to 300 ft length) | 50 | EA | $ - 0 | |
| 1001AZ | Replace pitch pockets 8" x 8" and fill with asphalt | 20 | EA | $ - 0 | |
| 1001BA | Replace pitch pockets 12" x 12" and fill with asphalt | 100 | EA | $ - 0 | |
| 1001BB | Repair, refill pitch pockets | 100 | EA | $ - 0 | |
| 1001BC | Reflash roof stack, install #4 lead plumbing stack flashing | 200 | EA | $ - 0 | |
| 1001BD | Replace drain clamping ring | 50 | EA | $ - 0 | |
| 1001BE | Replace drain strainer | 50 | EA | $ - 0 | |
| 1001BF | Install metal scuppers 6" x 6" and up to 10" x 12" | 20 | EA | $ - 0 | |
| 1001BG | Install service walkways/pads | 1,000 | SF | $ - 0 | |
| 1001BH | Remove/reinstall existing metal coping | 500 | LF | $ - 0 | |
| 1001BJ | Remove puff roof materials on existing roofing system | 100 | SQ | $ - 0 | |
| 1001BK | Provide asbestos testing | 100 | EA | $ - 0 | |
| 1001BL | Remove and dispose asbestos | 750 | SF | $ - 0 | |
| 1002 | Standing Seam Metal Roofing (SSMR) Repair or Replace | ||||
| 1002AA | Provide and install SSMR 0.040, 12 inch panel including anchor clips, hooks and fastener assembly. | 24,000 | SF | $ - 0 | |
| 1002AB | Provide and install ridge/hip flashing 18 gauge factory painted brown aluminum finished including ridge closure, hip closure and its fasteners | 1,000 | SF | $ - 0 | |
| 1002AC | Provide and install fascia/trim/cap flashing 18 gauge factory painted brown aluminum finished | 1,200 | LF | ||
| 1002AD | Provide and install plastic snow guard. | 3,030 | EA | $ - 0 | |
| 1002AE | Provide and install 2 " galvanized steel Z-purlins | 6,000 | LF | $ - 0 | |
| 1002AF | Provide and install continuous snow rail | 3,000 | LF | $ - 0 | |
| 1002AG | Provide and install continuous snow rail with ice-stopper | 3,000 | LF | $ - 0 | |
| 1002AH | Sawcut and remove existing SSMR | 1,000 | LF | $ - 0 | |
| 1002AI | Provide and install roof hatch for personnel or HVAC access | 2 | EA | $ - 0 | |
| 1002AJ | Provide and install elastomeric coating roof sealant along penetrations | 7,500 | SQ | $ - 0 | |
| 1002AK | Provide and install metal roof truss in accordance with the Unified Facilities Criteria (UFC) and local applicable codes | 300 | SQ | $ - 0 | |
| 1002AL | Professional engineer (PE) stamped designed drawings | 5 | EA | $ - 0 | |
| 1002AM | As-Built Drawings | 5 | EA | $ - 0 | |
| 1003 | Strip Shingles Roofing (SSR) Repair or Replace | ||||
| 1003AA | Reroof complete shingled roof with 235 lb/sq Class "A" asphalt shingles surfaced with mineral granules (remove one or two layers of existing shingles) | 100 | SQ | $ - 0 | |
| 1003AB | Replace drip edge, aluminum 0.040" thick, 5" girt factory painted brown aluminum | 1,500 | LF | $ - 0 | |
| 1003AC | Replace flashing/trim/valley 0.040" thick anodize brown aluminum | 1,500 | SF | ||
| 1003AD | Remove and replace crickets | 100 | EA | $ - 0 | |
| 1003AE | Replace wood trim, framing, board sheeting/fascia | 6,000 | BD FT | $ - 0 | |
| 1003AF | Paint new trim; one prime and one finish coat | 500 | SF | $ - 0 | |
| 1003AG | Replace and install new roof stack vent with rubber collar. | 50 | EA | $ - 0 | |
| 1003AH | Paint to match existing fascia, soffit and other paintable woodwork items. | 600 | SF | $ - 0 | |
| 1003AJ | Provide and install wood roof trusses spaced @ 24 inches o.c., 4 in 12 pitch, spanning from 20 ft to 30 ft, with a live load of 40 psf. | 275 | EA | $ - 0 | |
| 1003AK | Provide and install wood roof trusses spaced @ 24 inches o.c., 4 in 12 pitch, spanning from 20 ft to 30 ft, with a live load of 40 psf. | 275 | EA | $ - 0 | |
| 1003AL | Lifting and hoisting equipment rental per day, truck mounted up to 40 ton capacity | 30 | DAY | $ - 0 | |
| 1004 | Modified Bitumen Sheet Roofing (MBSR) System | ||||
| 1004AA | Remove existing one or two layers of roofing system, Provide and install three plies of MBSR. | 400 | SQ | $ - 0 | |
| 1004AB | Provide and install 3/4" conduit to existing electrical wiring laying on the roof | 500 | LF | $ - 0 | |
| 1004AC | Remove and replace worn out screws or fasteners with new screws having neoprene washers. | 8,000 | EA | $ - 0 | |
| 1004AD | Remove and replace foam closure. | 15,000 | LF | $ - 0 | |
| 1004AE | Remove and replace Pipe Flashing 90 mil | 100 | EA | $ - 0 | |
| 1004AF | Provide and install Uncured Neoprene 60 mil | 5,000 | SF | $ - 0 | |
| 1004AG | Provide and install 20 gauge metal to cover abandoned roof deck opening or abandoned penetrations. | 1,500 | SF | $ - 0 | |
| 1004AH | Remove loose, deteriorated cement/mortar from cracks/opening, apply non-shrink grout. | 3,000 | SF | $ - 0 | |
| 1004AJ | Provide and install ridge vent | 1,200 | LF | $ - 0 | |
| 1004AK | Replace deteriorated light weight conc plank 2-3/4 inch thick | 600 | SF | $ - 0 | |
| 1004AL | Provide and install 4" diameter C.I. Pipe to include 45 degree or 90 degree drainage elbow. | 40 | EA | $ - 0 | |
| 1004AM | Provide and install 4" C.I. Piping | 200 | LF | $ - 0 | |
| 1004AN | Provide and install 6" diameter C. I. Pipe to include 45 degree or 90 degree drainage elbow | 80 | EA | $ - 0 | |
| 1004AO | Provide and install 6" C. I. Piping | 200 | LF | $ - 0 | |
| 1004AP | Provide caulking at joint opening using high grade caulk | 2,500 | LF | $ - 0 | |
| 1004AQ | Provide brick wall waterproofing/sealant by brush application | 9,500 | SF | $ - 0 | |
| 1004AR | Provide brick wall waterproofing/sealant by roller application | 9,500 | SF | $ - 0 | |
| 1004AS | Provide brick wall waterproofing/sealant by spray application | 9,500 | SF | $ - 0 | |
| Option Year I, Estimated Total | $ - 0 | ||||
| NOTE 1: Unlike firm-fixed price contracts, there will not be separate or lump sum payments for any bond, premiums, or other bond cost under the contract. Therefore, unit prices are to include all costs associated with the work element of the CLIN (including but not limited to all labor, material, general conditions, mobilizations, overhead, bond, profit, etc). | |||||
| NOTE 2: Contract performance time is 365 calendar days from contract award. Actual contract dates will be inserted at time of award. | |||||
| NOTE 3 : CLINS 0001BL, 1001BL, 2001BL, 3001BL, 4001BL are for removal and disposal of possible hazardous material in conjunction with the work. These CLINS will be utilized if the specific hazardous material is confirmed to be present at the job site and at a level deemed to be hazardous. | |||||
| Schedule B | |||||
| Pricing Schedule | |||||
| PROJECT AJXF 08-1552, ROOFING SYSTEMS | |||||
| Option Year II | |||||
| Provide all plant, labor, equipment, materials and perform all operations required to repair and/or replace Built-Up Roofing (BURS), Standing Seam Metal Roofing (SSMR), Strip Shingles Roofing (SSR), Modified Bitumen Sheet Roofing (MBSR) System, in accordance with the applicable clauses, specifications and drawings for Projects AJXF 08-1552, Repair Roofs Multi-Facilities. The specific items include the following tasks: | |||||
| ITEM | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| 2001 | Built-up Roofing (BURS) Repair or Replace | ||||
| 2001AA | Reroof complete 4 ply built-up roof, aggregate surface without insulation demolish and remove one or two layers of existing BUR roofing membrane and install new 4 ply BUR roofing membrane | 3,100 | SQ | $ - 0 | |
| 2001AB | Repair 4 ply built-up roof, scrape layers of aggregate, flood coat with hot asphalt and spread new aggregate over the repaired area. | 950 | SQ | $ - 0 | |
| 2001AC | Replace deteriorated wood decking with 3/4" CD waterproof adhesive plywood | 12,000 | SF | ||
| 2001AD | Replace deteriorated wood decking with 1/2" CD waterproof adhesive plywood | 12,000 | SF | $ - 0 | |
| 2001AE | Replace deteriorated wood framing, cants, curbs, blocking, nailers, sleepers, edge strips using treated wood replacement. | 60,000 | BD FT | $ - 0 | |
| 2001AF | Replace gravel stop with 0.050" factory painted brown aluminum 6" high continuous cleat | 6,000 | LF | $ - 0 | |
| 2001AG | Replace gravel stop with 0.050" factory painted brown aluminum 8" high continuous cleat | 6,500 | LF | $ - 0 | |
| 2001AH | Replace 0.040" factory painted brown aluminum counterflashing. | 3,000 | SF | $ - 0 | |
| 2001AJ | Replace gutter 0.050" factory painted brown aluminum box type, 5 inches complete with straps and fasteners assembly and expansion joint every 40 feet | 8,000 | LF | $ - 0 | |
| 2001AK | Replace gutter 0.050" factory painted brown aluminum box type, 6 inches complete with straps and fasteners assembly and expansion joint every 40 feet | 8,000 | LF | $ - 0 | |
| 2001AL | Replace fascia 0.050" factory painted brown aluminum | 4,500 | LF | $ - 0 | |
| 2001AM | Replace downspout with 3" x 4" factory painted brown aluminum 0.032" thick. | 4,000 | LF | $ - 0 | |
| 2001AN | Replace downspout with 4" x 6" factory painted brown aluminum 0.032" thick. | 6,000 | LF | $ - 0 | |
| 2001AP | Replace curb/coping/cap flashing, base flashing and trim 0.040" thick factory painted brown aluminum. Conceal fasteners and caulk joints. | 5,500 | SF | $ - 0 | |
| 2001AQ | Replace parapet coping, 16 gauge (0.50") factory painted brown aluminum. Conceal fasteners and caulk joints | 8,000 | SF | $ - 0 | |
| 2001AR | Remove and install new 4" cast iron roof drain with sump, deck clamp and strainer. | 100 | EA | $ - 0 | |
| 2001AS | Install insulation board, perlite thermal 1" thick | 330,000 | SF | $ - 0 | |
| 2001AT | Install insulation board, polyurethane or polyisocyanurate, one inch thick R7.1 | 330,000 | SF | $ - 0 | |
| 2001AU | Install 1/8" tapered insulation board | 20,000 | BF | $ - 0 | |
| 2001AV | Remove and replace bituminous flashing | 2,000 | SF | $ - 0 | |
| 2001AW | Provide and install new expansion joint with butyl or neoprene 0.42" aluminum flanges, open to 3-1/2 inches. | 800 | LF | $ - 0 | |
| 2001AX | Remove miscellaneous abandoned support structure, brackets, framing support and abandoned pitchpocket | 500 | LB | $ - 0 | |
| 2001AY | Snake, clean roof drains (100 ft to 300 ft length) | 20 | EA | $ - 0 | |
| 2001AZ | Replace pitch pockets 8" x 8" and fill with asphalt | 50 | EA | $ - 0 | |
| 2001BA | Replace pitch pockets 12" x 12" and fill with asphalt | 100 | EA | $ - 0 | |
| 2001BB | Repair, refill pitch pockets | 100 | EA | $ - 0 | |
| 2001BC | Reflash roof stack, install #4 lead plumbing stack flashing | 120 | EA | $ - 0 | |
| 2001BD | Replace drain clamping ring | 25 | EA | $ - 0 | |
| 2001BE | Replace drain strainer | 25 | EA | $ - 0 | |
| 2001BF | Install metal scuppers 6" x 6" and up to 10" x 12" | 50 | EA | $ - 0 | |
| 2001BG | Install service walkways/pads | 2,000 | SF | $ - 0 | |
| 2001BH | Remove/reinstall existing metal coping | 3,500 | LF | $ - 0 | |
| 2001BJ | Remove puff roof materials on existing roofing system | 75 | SQ | $ - 0 | |
| 2001BK | Provide asbestos testing | 10 | EA | $ - 0 | |
| 2001BL | Remove and dispose asbestos | 500 | SF | $ - 0 | |
| 2002 | Standing Seam Metal Roofing (SSMR) Repair or Replace | ||||
| 2002AA | Provide and install SSMR 0.040, 12 inch panel including anchor clips, hooks and fastener assembly. | 18,000 | SF | $ - 0 | |
| 2002AB | Provide and install ridge/hip flashing 18 gauge factory painted brown aluminum finished including ridge closure, hip closure and its fasteners | 3,000 | SF | $ - 0 | |
| 2002AC | Provide and install fascia/trim/cap flashing 18 gauge factory painted brown aluminum finished | 1,500 | LF | ||
| 2002AD | Provide and install plastic snow guard. | 2,000 | EA | $ - 0 | |
| 2002AE | Provide and install 2 " galvanized steel Z-purlins | 12,000 | LF | $ - 0 | |
| 2002AF | Provide and install continuous snow rail | 3,500 | LF | $ - 0 | |
| 2002AG | Provide and install continuous snow rail with ice-stopper | 3,500 | LF | $ - 0 | |
| 2002AH | Sawcut and remove existing SSMR | 1,000 | LF | $ - 0 | |
| 2002AI | Provide and install roof hatch for personnel or HVAC access | 2 | EA | $ - 0 | |
| 2002AJ | Provide and install elastomeric coating roof sealant along penetrations | 7,500 | SQ | $ - 0 | |
| 2002AK | Provide and install metal roof truss in accordance with the Unified Facilities Criteria (UFC) and local applicable codes | 300 | SQ | $ - 0 | |
| 2002AL | Professional engineer (PE) stamped designed drawings | 5 | EA | $ - 0 | |
| 2002AM | As-Built Drawings | 5 | EA | $ - 0 | |
| 2003 | Strip Shingles Roofing (SSR) Repair or Replace | ||||
| 2003AA | Reroof complete shingled roof with 235 lb/sq Class "A" asphalt shingles surfaced with mineral granules (remove one or two layers of existing shingles) | 195 | SQ | $ - 0 | |
| 2003AB | Replace drip edge, aluminum 0.040" thick, 5" girt factory painted brown aluminum | 3,000 | LF | $ - 0 | |
| 2003AC | Replace flashing/trim/valley 0.040" thick anodize brown aluminum | 3,400 | SF | ||
| 2003AD | Remove and replace crickets | 250 | EA | $ - 0 | |
| 2003AE | Replace wood trim, framing, board sheeting/fascia | 2,500 | BD FT | $ - 0 | |
| 2003AF | Paint new trim; one prime and one finish coat | 3,600 | SF | $ - 0 | |
| 2003AG | Replace and install new roof stack vent with rubber collar. | 300 | EA | $ - 0 | |
| 2003AH | Paint to match existing fascia, soffit and other paintable woodwork items. | 6,000 | SF | $ - 0 | |
| 2003AJ | Provide and install wood roof trusses spaced @ 24 inches o.c., 4 in 12 pitch, spanning from 20 ft to 30 ft, with a live load of 40 psf. | 200 | EA | $ - 0 | |
| 2003AK | Provide and install wood roof trusses spaced @ 24 inches o.c., 4 in 12 pitch, spanning from 20 ft to 30 ft, with a live load of 40 psf. | 200 | EA | $ - 0 | |
| 2003AL | Lifting and hoisting equipment rental per day, truck mounted up to 40 ton capacity | 20 | DAY | $ - 0 | |
| 2004 | Modified Bitumen Sheet Roofing (MBSR) System | ||||
| 2004AA | Remove existing one or two layers of roofing system, Provide and install three plies of MBSR. | 185 | SQ | $ - 0 | |
| 2004AB | Provide and install 3/4" conduit to existing electrical wiring laying on the roof | 100 | LF | $ - 0 | |
| 2004AC | Remove and replace worn out screws or fasteners with new screws having neoprene washers. | 6,000 | EA | $ - 0 | |
| 2004AD | Remove and replace foam closure. | 6,000 | LF | $ - 0 | |
| 2004AE | Remove and replace Pipe Flashing 90 mil | 250 | EA | $ - 0 | |
| 2004AF | Provide and install Uncured Neoprene 60 mil | 4,000 | SF | $ - 0 | |
| 2004AG | Provide and install 20 gauge metal to cover abandoned roof deck opening or abandoned penetrations. | 4,600 | SF | $ - 0 | |
| 2004AH | Remove loose, deteriorated cement/mortar from cracks/opening, apply non-shrink grout. | 3,600 | SF | $ - 0 | |
| 2004AJ | Provide and install ridge vent | 6,000 | LF | $ - 0 | |
| 2004AK | Replace deteriorated light weight conc plank 2-3/4 inch thick | 2,100 | SF | $ - 0 | |
| 2004AL | Provide and install 4" diameter C.I. Pipe to include 45 degree or 90 degree drainage elbow. | 300 | EA | $ - 0 | |
| 2004AM | Provide and install 4" C.I. Piping | 300 | LF | $ - 0 | |
| 2004AN | Provide and install 6" diameter C. I. Pipe to include 45 degree or 90 degree drainage elbow | 80 | EA | $ - 0 | |
| 2004AO | Provide and install 6" C. I. Piping | 180 | LF | $ - 0 | |
| 2004AP | Provide caulking at joint opening using high grade caulk | 1,800 | LF | $ - 0 | |
| 2004AQ | Provide brick wall waterproofing/sealant by brush application | 10,500 | SF | $ - 0 | |
| 2004AR | Provide brick wall waterproofing/sealant by roller application | 10,500 | SF | $ - 0 | |
| 2004AS | Provide brick wall waterproofing/sealant by spray application | 10,500 | SF | $ - 0 | |
| Option Year II, Estimated Total | $ - 0 | ||||
| NOTE 1: Unlike firm-fixed price contracts, there will not be separate or lump sum payments for any bond, premiums, or other bond cost under the contract. Therefore, unit prices are to include all costs associated with the work element of the CLIN (including but not limited to all labor, material, general conditions, mobilizations, overhead, bond, profit, etc). | |||||
| NOTE 2: Contract performance time is 365 calendar days from contract award. Actual contract dates will be inserted at time of award. | |||||
| NOTE 3 : CLINS 0001BL, 1001BL, 2001BL, 3001BL, 4001BL are for removal and disposal of possible hazardous material in conjunction with the work. These CLINS will be utilized if the specific hazardous material is confirmed to be present at the job site and at a level deemed to be hazardous. | |||||
| Schedule B | |||||
| Pricing Schedule | |||||
| PROJECT AJXF 08-1552, ROOFING SYSTEMS | |||||
| Option Year III | |||||
| Provide all plant, labor, equipment, materials and perform all operations required to repair and/or replace Built-Up Roofing (BURS), Standing Seam Metal Roofing (SSMR), Strip Shingles Roofing (SSR), Modified Bitumen Sheet Roofing (MBSR) System, in accordance with the applicable clauses, specifications and drawings for Projects AJXF 08-1552, Repair Roofs Multi-Facilities. The specific items include the following tasks: | |||||
| ITEM | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| 3001 | Built-up Roofing (BURS) Repair or Replace | ||||
| 3001AA | Reroof complete 4 ply built-up roof, aggregate surface without insulation demolish and remove one or two layers of existing BUR roofing membrane and install new 4 ply BUR roofing membrane | 3,150 | SQ | $ - 0 | |
| 3001AB | Repair 4 ply built-up roof, scrape layers of aggregate, flood coat with hot asphalt and spread new aggregate over the repaired area. | 600 | SQ | $ - 0 | |
| 3001AC | Replace deteriorated wood decking with 3/4" CD waterproof adhesive plywood | 10,000 | SF | ||
| 3001AD | Replace deteriorated wood decking with 1/2" CD waterproof adhesive plywood | 10,000 | SF | $ - 0 | |
| 3001AE | Replace deteriorated wood framing, cants, curbs, blocking, nailers, sleepers, edge strips using treated wood replacement. | 50,000 | BD FT | $ - 0 | |
| 3001AF | Replace gravel stop with 0.050" factory painted brown aluminum 6" high continuous cleat | 8,000 | LF | $ - 0 | |
| 3001AG | Replace gravel stop with 0.050" factory painted brown aluminum 8" high continuous cleat | 8,000 | LF | $ - 0 | |
| 3001AH | Replace 0.040" factory painted brown aluminum counterflashing. | 4,000 | SF | $ - 0 | |
| 3001AJ | Replace gutter 0.050" factory painted brown aluminum box type, 5 inches complete with straps and fasteners assembly and expansion joint every 40 feet | 9,000 | LF | $ - 0 | |
| 3001AK | Replace gutter 0.050" factory painted brown aluminum box type, 6 inches complete with straps and fasteners assembly and expansion joint every 40 feet | 9,000 | LF | $ - 0 | |
| 3001AL | Replace fascia 0.050" factory painted brown aluminum | 6,000 | LF | $ - 0 | |
| 3001AM | Replace downspout with 3" x 4" factory painted brown aluminum 0.032" thick. | 8,000 | LF | $ - 0 | |
| 3001AN | Replace downspout with 4" x 6" factory painted brown aluminum 0.032" thick. | 8,000 | LF | $ - 0 | |
| 3001AP | Replace curb/coping/cap flashing, base flashing and trim 0.040" thick factory painted brown aluminum. Conceal fasteners and caulk joints. | 10,000 | SF | $ - 0 | |
| 3001AQ | Replace parapet coping, 16 gauge (0.50") factory painted brown aluminum. Conceal fasteners and caulk joints | 9,000 | SF | $ - 0 | |
| 3001AR | Remove and install new 4" cast iron roof drain with sump, deck clamp and strainer. | 110 | EA | $ - 0 | |
| 3001AS | Install insulation board, perlite thermal 1" thick | 315,000 | SF | $ - 0 | |
| 3001AT | Install insulation board, polyurethane or polyisocyanurate, one inch thick R7.1 | 315,000 | SF | $ - 0 | |
| 3001AU | Install 1/8" tapered insulation board | 25,000 | BF | $ - 0 | |
| 3001AV | Remove and replace bituminous flashing | 3,000 | SF | $ - 0 | |
| 3001AW | Provide and install new expansion joint with butyl or neoprene 0.42" aluminum flanges, open to 3-1/2 inches. | 1,800 | LF | $ - 0 | |
| 3001AX | Remove miscellaneous abandoned support structure, brackets, framing support and abandoned pitchpocket | 1,000 | LB | $ - 0 | |
| 3001AY | Snake, clean roof drains (100 ft to 300 ft length) | 30 | EA | $ - 0 | |
| 3001AZ | Replace pitch pockets 8" x 8" and fill with asphalt | 30 | EA | $ - 0 | |
| 3001BA | Replace pitch pockets 12" x 12" and fill with asphalt | 50 | EA | $ - 0 | |
| 3001BB | Repair, refill pitch pockets | 250 | EA | $ - 0 | |
| 3001BC | Reflash roof stack, install #4 lead plumbing stack flashing | 300 | EA | $ - 0 | |
| 3001BD | Replace drain clamping ring | 40 | EA | $ - 0 | |
| 3001BE | Replace drain strainer | 40 | EA | $ - 0 | |
| 3001BF | Install metal scuppers 6" x 6" and up to 10" x 12" | 60 | EA | $ - 0 | |
| 3001BG | Install service walkways/pads | 5,000 | SF | $ - 0 | |
| 3001BH | Remove/reinstall existing metal coping | 4,000 | LF | $ - 0 | |
| 3001BJ | Remove puff roof materials on existing roofing system | 75 | SQ | $ - 0 | |
| 3001BK | Provide asbestos testing | 18 | EA | $ - 0 | |
| 3001BL | Remove and dispose asbestos | 140 | SF | $ - 0 | |
| 3002 | Standing Seam Metal Roofing (SSMR) Repair or Replace | ||||
| 3002AA | Provide and install SSMR 0.040, 12 inch panel including anchor clips, hooks and fastener assembly. | 20,000 | SF | $ - 0 | |
| 3002AB | Provide and install ridge/hip flashing 18 gauge factory painted brown aluminum finished including ridge closure, hip closure and its fasteners | 4,000 | SF | $ - 0 | |
| 3002AC | Provide and install fascia/trim/cap flashing 18 gauge factory painted brown aluminum finished | 1,200 | LF | ||
| 3002AD | Provide and install plastic snow guard. | 4,000 | EA | $ - 0 | |
| 3002AE | Provide and install 2 " galvanized steel Z-purlins | 7,500 | LF | $ - 0 | |
| 3002AF | Provide and install continuous snow rail | 3,500 | LF | $ - 0 | |
| 3002AG | Provide and install continuous snow rail with ice-stopper | 3,500 | LF | $ - 0 | |
| 3002AH | Sawcut and remove existing SSMR | 1,000 | LF | $ - 0 | |
| 3002AI | Provide and install roof hatch for personnel or HVAC access | 2 | EA | $ - 0 | |
| 3002AJ | Provide and install elastomeric coating roof sealant along penetrations | 7,500 | SQ | $ - 0 | |
| 3002AK | Provide and install metal roof truss in accordance with the Unified Facilities Criteria (UFC) and local applicable codes | 300.00 | SQ | $ - 0 | |
| 3002AL | Professional engineer (PE) stamped designed drawings | 5 | EA | $ - 0 | |
| 3002AM | As-Built Drawings | 5 | EA | $ - 0 | |
| 3003 | Strip Shingles Roofing (SSR) Repair or Replace | ||||
| 3003AA | Reroof complete shingled roof with 235 lb/sq Class "A" asphalt shingles surfaced with mineral granules (remove one or two layers of existing shingles) | 120 | SQ | $ - 0 | |
| 3003AB | Replace drip edge, aluminum 0.040" thick, 5" girt factory painted brown aluminum | 3,600 | LF | $ - 0 | |
| 3003AC | Replace flashing/trim/valley 0.040" thick anodize brown aluminum | 3,200 | SF | ||
| 3003AD | Remove and replace crickets | 120 | EA | $ - 0 | |
| 3003AE | Replace wood trim, framing, board sheeting/fascia | 3,000 | BD FT | $ - 0 | |
| 3003AF | Paint new trim; one prime and one finish coat | 4,600 | SF | $ - 0 | |
| 3003AG | Replace and install new roof stack vent with rubber collar. | 250 | EA | $ - 0 | |
| 3003AH | Paint to match existing fascia, soffit and other paintable woodwork items. | 5,000 | SF | $ - 0 | |
| 3003AJ | Provide and install wood roof trusses spaced @ 24 inches o.c., 4 in 12 pitch, spanning from 20 ft to 30 ft, with a live load of 40 psf. | 215 | EA | $ - 0 | |
| 3003AK | Provide and install wood roof trusses spaced @ 24 inches o.c., 4 in 12 pitch, spanning from 20 ft to 30 ft, with a live load of 40 psf. | 215 | EA | $ - 0 | |
| 3003AL | Lifting and hoisting equipment rental per day, truck mounted up to 40 ton capacity | 20 | DAY | $ - 0 | |
| 3004 | Modified Bitumen Sheet Roofing (MBSR) System | ||||
| 3004AA | Remove existing one or two layers of roofing system, Provide and install three plies of MBSR. | 415 | SQ | $ - 0 | |
| 3004AB | Provide and install 3/4" conduit to existing electrical wiring laying on the roof | 250 | LF | $ - 0 | |
| 3004AC | Remove and replace worn out screws or fasteners with new screws having neoprene washers. | 3,000 | EA | $ - 0 | |
| 3004AD | Remove and replace foam closure. | 7,500 | LF | $ - 0 | |
| 3004AE | Remove and replace Pipe Flashing 90 mil | 200 | EA | $ - 0 | |
| 3004AF | Provide and install Uncured Neoprene 60 mil | 2,000 | SF | $ - 0 | |
| 3004AG | Provide and install 20 gauge metal to cover abandoned roof deck opening or abandoned penetrations. | 500 | SF | $ - 0 | |
| 3004AH | Remove loose, deteriorated cement/mortar from cracks/opening, apply non-shrink grout. | 300 | SF | $ - 0 | |
| 3004AJ | Provide and install ridge vent | 7,500 | LF | $ - 0 | |
| 3004AK | Replace deteriorated light weight conc plank 2-3/4 inch thick | 1,000 | SF | $ - 0 | |
| 3004AL | Provide and install 4" diameter C.I. Pipe to include 45 degree or 90 degree drainage elbow. | 200 | EA | $ - 0 | |
| 3004AM | Provide and install 4" C.I. Piping | 200 | LF | $ - 0 | |
| 3004AN | Provide and install 6" diameter C. I. Pipe to include 45 degree or 90 degree drainage elbow | 110 | EA | $ - 0 | |
| 3004AO | Provide and install 6" C. I. Piping | 250 | LF | $ - 0 | |
| 3004AP | Provide caulking at joint opening using high grade caulk | 500 | LF | $ - 0 | |
| 3004AQ | Provide brick wall waterproofing/sealant by brush application | 8,500 | SF | $ - 0 | |
| 3004AR | Provide brick wall waterproofing/sealant by roller application | 8,500 | SF | $ - 0 | |
| 3004AS | Provide brick wall waterproofing/sealant by spray application | 8,500 | SF | $ - 0 | |
| Option Year III, Estimated Total | $ - 0 | ||||
| NOTE 1: Unlike firm-fixed price contracts, there will not be separate or lump sum payments for any bond, premiums, or other bond cost under the contract. Therefore, unit prices are to include all costs associated with the work element of the CLIN (including but not limited to all labor, material, general conditions, mobilizations, overhead, bond, profit, etc). | |||||
| NOTE 2: Contract performance time is 365 calendar days from contract award. Actual contract dates will be inserted at time of award. | |||||
| NOTE 3 : CLINS 0001BL, 1001BL, 2001BL, 3001BL, 4001BL are for removal and disposal of possible hazardous material in conjunction with the work. These CLINS will be utilized if the specific hazardous material is confirmed to be present at the job site and at a level deemed to be hazardous. | |||||
| Schedule B | |||||
| Pricing Schedule | |||||
| PROJECT AJXF 08-1552, ROOFING SYSTEMS | |||||
| Option Year IV | |||||
| Provide all plant, labor, equipment, materials and perform all operations required to repair and/or replace Built-Up Roofing (BURS), Standing Seam Metal Roofing (SSMR), Strip Shingles Roofing (SSR), Modified Bitumen Sheet Roofing (MBSR) System, in accordance with the applicable clauses, specifications and drawings for Projects AJXF 08-1552, Repair Roofs Multi-Facilities. The specific items include the following tasks: | |||||
| ITEM | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| 4001 | Built-up Roofing (BURS) Repair or Replace | ||||
| 4001AA | Reroof complete 4 ply built-up roof, aggregate surface without insulation demolish and remove one or two layers of existing BUR roofing membrane and install new 4 ply BUR roofing membrane | 3,250 | SQ | $ - 0 | |
| 4001AB | Repair 4 ply built-up roof, scrape layers of aggregate, flood coat with hot asphalt and spread new aggregate over the repaired area. | 400 | SQ | $ - 0 | |
| 4001AC | Replace deteriorated wood decking with 3/4" CD waterproof adhesive plywood | 12,000 | SF | ||
| 4001AD | Replace deteriorated wood decking with 1/2" CD waterproof adhesive plywood | 12,000 | SF | $ - 0 | |
| 4001AE | Replace deteriorated wood framing, cants, curbs, blocking, nailers, sleepers, edge strips using treated wood replacement. | 55,000 | BD FT | $ - 0 | |
| 4001AF | Replace gravel stop with 0.050" factory painted brown aluminum 6" high continuous cleat | 9,000 | LF | $ - 0 | |
| 4001AG | Replace gravel stop with 0.050" factory painted brown aluminum 8" high continuous cleat | 8,600 | LF | $ - 0 | |
| 4001AH | Replace 0.040" factory painted brown aluminum counterflashing. | 3,900 | SF | $ - 0 | |
| 4001AJ | Replace gutter 0.050" factory painted brown aluminum box type, 5 inches complete with straps and fasteners assembly and expansion joint every 40 feet | 10,000 | LF | $ - 0 | |
| 4001AK | Replace gutter 0.050" factory painted brown aluminum box type, 6 inches complete with straps and fasteners assembly and expansion joint every 40 feet | 10,500 | LF | $ - 0 | |
| 4001AL | Replace fascia 0.050" factory painted brown aluminum | 5,000 | LF | $ - 0 | |
| 4001AM | Replace downspout with 3" x 4" factory painted brown aluminum 0.032" thick. | 7,500 | LF | $ - 0 | |
| 4001AN | Replace downspout with 4" x 6" factory painted brown aluminum 0.032" thick. | 7,500 | LF | $ - 0 | |
| 4001AP | Replace curb/coping/cap flashing, base flashing and trim 0.040" thick factory painted brown aluminum. Conceal fasteners and caulk joints. | 12,000 | SF | $ - 0 | |
| 4001AQ | Replace parapet coping, 16 gauge (0.50") factory painted brown aluminum. Conceal fasteners and caulk joints | 10,000 | SF | $ - 0 | |
| 4001AR | Remove and install new 4" cast iron roof drain with sump, deck clamp and strainer. | 95 | EA | $ - 0 | |
| 4001AS | Install insulation board, perlite thermal 1" thick | 325,000 | SF | $ - 0 | |
| 4001AT | Install insulation board, polyurethane or polyisocyanurate, one inch thick R7.1 | 325,000 | SF | $ - 0 | |
| 4001AU | Install 1/8" tapered insulation board | 15,000 | BF | $ - 0 | |
| 4001AV | Remove and replace bituminous flashing | 5,000 | SF | $ - 0 | |
| 4001AW | Provide and install new expansion joint with butyl or neoprene 0.42" aluminum flanges, open to 3-1/2 inches. | 4,500 | LF | $ - 0 | |
| 4001AX | Remove miscellaneous abandoned support structure, brackets, framing support and abandoned pitchpocket | 800 | LB | $ - 0 | |
| 4001AY | Snake, clean roof drains (100 ft to 300 ft length) | 25 | EA | $ - 0 | |
| 4001AZ | Replace pitch pockets 8" x 8" and fill with asphalt | 100 | EA | $ - 0 | |
| 4001BA | Replace pitch pockets 12" x 12" and fill with asphalt | 80 | EA | $ - 0 | |
| 4001BB | Repair, refill pitch pockets | 180 | EA | $ - 0 | |
| 4001BC | Reflash roof stack, install #4 lead plumbing stack flashing | 400 | EA | $ - 0 | |
| 4001BD | Replace drain clamping ring | 60 | EA | $ - 0 | |
| 4001BE | Replace drain strainer | 60 | EA | $ - 0 | |
| 4001BF | Install metal scuppers 6" x 6" and up to 10" x 12" | 80 | EA | $ - 0 | |
| 4001BG | Install service walkways/pads | 4,000 | SF | $ - 0 | |
| 4001BH | Remove/reinstall existing metal coping | 4,000 | LF | $ - 0 | |
| 4001BJ | Remove puff roof materials on existing roofing system | 75 | SQ | $ - 0 | |
| 4001BK | Provide asbestos testing | 8 | EA | $ - 0 | |
| 4001BL | Remove and dispose asbestos | 100 | SF | $ - 0 | |
| 4002 | Standing Seam Metal Roofing (SSMR) Repair or Replace | ||||
| 4002AA | Provide and install SSMR 0.040, 12 inch panel including anchor clips, hooks and fastener assembly. | 30,000 | SF | $ - 0 | |
| 4002AB | Provide and install ridge/hip flashing 18 gauge factory painted brown aluminum finished including ridge closure, hip closure and its fasteners | 4,800 | SF | $ - 0 | |
| 4002AC | Provide and install fascia/trim/cap flashing 18 gauge factory painted brown aluminum finished | 3,000 | LF | ||
| 4002AD | Provide and install plastic snow guard. | 4,000 | EA | $ - 0 | |
| 4002AE | Provide and install 2 " galvanized steel Z-purlins | 4,000 | LF | $ - 0 | |
| 4002AF | Provide and install continuous snow rail | 3,500 | LF | $ - 0 | |
| 4002AG | Provide and install continuous snow rail with ice-stopper | 3,500 | LF | $ - 0 | |
| 4002AH | Sawcut and remove existing SSMR | 1,000 | LF | $ - 0 | |
| 4002AI | Provide and install roof hatch for personnel or HVAC access | 2 | EA | $ - 0 | |
| 4002AJ | Provide and install elastomeric coating roof sealant along penetrations | 7,500 | SQ | $ - 0 | |
| 4002AK | Provide and install metal roof truss in accordance with the Unified Facilities Criteria (UFC) and local applicable codes | 300 | SQ | $ - 0 | |
| 4002AL | Professional engineer (PE) stamped designed drawings | 5 | EA | $ - 0 | |
| 4002AM | As-Built Drawings | 5 | EA | $ 20.00 | $ 100.00 |
| 4003 | Strip Shingles Roofing (SSR) Repair or Replace | ||||
| 4003AA | Reroof complete shingled roof with 235 lb/sq Class "A" asphalt shingles surfaced with mineral granules (remove one or two layers of existing shingles) | 115 | SQ | $ - 0 | |
| 4003AB | Replace drip edge, aluminum 0.040" thick, 5" girt factory painted brown aluminum | 7,500 | LF | $ - 0 | |
| 4003AC | Replace flashing/trim/valley 0.040" thick anodize brown aluminum | 4,600 | SF | ||
| 4003AD | Remove and replace crickets | 105 | EA | $ - 0 | |
| 4003AE | Replace wood trim, framing, board sheeting/fascia | 7,500 | BD FT | $ - 0 | |
| 4003AF | Paint new trim; one prime and one finish coat | 600 | SF | $ - 0 | |
| 4003AG | Replace and install new roof stack vent with rubber collar. | 380 | EA | $ - 0 | |
| 4003AH | Paint to match existing fascia, soffit and other paintable woodwork items. | 2,000 | SF | $ - 0 | |
| 4003AJ | Provide and install wood roof trusses spaced @ 24 inches o.c., 4 in 12 pitch, spanning from 20 ft to 30 ft, with a live load of 40 psf. | 210 | EA | $ - 0 | |
| 4003AK | Provide and install wood roof trusses spaced @ 24 inches o.c., 4 in 12 pitch, spanning from 20 ft to 30 ft, with a live load of 40 psf. | 210 | EA | $ - 0 | |
| 4003AL | Lifting and hoisting equipment rental per day, truck mounted up to 40 ton capacity | 15 | DAY | $ - 0 | |
| 4004 | Modified Bitumen Sheet Roofing (MBSR) System | ||||
| 4004AA | Remove existing one or two layers of roofing system, Provide and install three plies of MBSR. | 244 | SQ | $ - 0 | |
| 4004AB | Provide and install 3/4" conduit to existing electrical wiring laying on the roof | 120 | LF | $ - 0 | |
| 4004AC | Remove and replace worn out screws or fasteners with new screws having neoprene washers. | 1,200 | EA | $ - 0 | |
| 4004AD | Remove and replace foam closure. | 2,000 | LF | $ - 0 | |
| 4004AE | Remove and replace Pipe Flashing 90 mil | 150 | EA | $ - 0 | |
| 4004AF | Provide and install Uncured Neoprene 60 mil | 600 | SF | $ - 0 | |
| 4004AG | Provide and install 20 gauge metal to cover abandoned roof deck opening or abandoned penetrations. | 380 | SF | $ - 0 | |
| 4004AH | Remove loose, deteriorated cement/mortar from cracks/opening, apply non-shrink grout. | 420 | SF | $ - 0 | |
| 4004AJ | Provide and install ridge vent | 5,000 | LF | $ - 0 | |
| 4004AK | Replace deteriorated light weight conc plank 2-3/4 inch thick | 200 | SF | $ - 0 | |
| 4004AL | Provide and install 4" diameter C.I. Pipe to include 45 degree or 90 degree drainage elbow. | 90 | EA | $ - 0 | |
| 4004AM | Provide and install 4" C.I. Piping | 140 | LF | $ - 0 | |
| 4004AN | Provide and install 6" diameter C. I. Pipe to include 45 degree or 90 degree drainage elbow | 110 | EA | $ - 0 | |
| 4004AO | Provide and install 6" C. I. Piping | 140 | LF | $ - 0 | |
| 4004AP | Provide caulking at joint opening using high grade caulk | 400 | LF | $ - 0 | |
| 4004AQ | Provide brick wall waterproofing/sealant by brush application | 15,000 | SF | $ - 0 | |
| 4004AR | Provide brick wall waterproofing/sealant by roller application | 15,000 | SF | $ - 0 | |
| 4004AS | Provide brick wall waterproofing/sealant by spray application | 15,000 | SF | $ - 0 | |
| Option Year IV, Estimated Total | $ 100.00 | ||||
| Price Proposal Amount, Estimated Total (Base + all four (4) Option Years) | $ 100.00 | ||||
| NOTE 1: Unlike firm-fixed price contracts, there will not be separate or lump sum payments for any bond, premiums, or other bond cost under the contract. Therefore, unit prices are to include all costs associated with the work element of the CLIN (including but not limited to all labor, material, general conditions, mobilizations, overhead, bond, profit, etc). | |||||
| NOTE 2: Contract performance time is 365 calendar days from contract award. Actual contract dates will be inserted at time of award. | |||||
| NOTE 3 : CLINS 0001BL, 1001BL, 2001BL, 3001BL, 4001BL are for removal and disposal of possible hazardous material in conjunction with the work. These CLINS will be utilized if the specific hazardous material is confirmed to be present at the job site and at a level deemed to be hazardous. |
&CAttachment 2 - Pricing Schedule B &C&P
File details come from the government source that posted it. Updated .