Updated Wage Determination for Prince George's County MD
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7 -Roof IDC Schedule of Material Submittals.xls | XLS spreadsheet | |
| FA4416-08-R-0008-P0002.doc | DOC document | |
| Attachment 2 - Pricing Schedule B.xls | XLS spreadsheet | |
| FA4416-08-R-0008-P0001.doc | DOC document | |
| Attachment 2 - Pricing Schedule B.xls | XLS spreadsheet | |
| Attachment 6 - Visitor Information.doc | DOC document | |
| Attachment 3 - Past Performance Questionnaire.doc | DOC document | |
| Attachment 4 - WD No MD080057 Construction type Building Prince George's County.doc | DOC document | |
| FA4416-08-R-0008.doc | DOC document | |
| Attachment 5 - WD No MD080021 Construction Type Building Anne Arundel County.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4a – Wage Determination No. MD080057; Construction type: Building; Prince George’s County, MD
General Decision Number: MD080057 05/30/2008 MD57
Superseded General Decision Number: MD20070057
State: Maryland
Construction Type: Building
County: Prince George's County in Maryland.
BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 02/08/2008
1 03/28/2008
2 04/04/2008
3 05/02/2008
4 05/09/2008
5 05/30/2008
ASBE0024-001 10/01/2007
Rates Fringes
Asbestos Worker/Heat and
Frost Insulator
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems..........$ 27.88 13.88
ASBE0024-002 10/01/2007
Rates Fringes
HAZARDOUS MATERIAL HANDLER
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 17.95 6.50
ASBE0024-005 10/01/2007
Rates Fringes
Fire Stop Technician.............$ 22.95 6.39
Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.
BRDC0001-001 04/30/2007
Rates Fringes
Bricklayer......................$ 25.90 6.19
CARP0132-001 05/01/2008
Rates Fringes
Carpenter/Lather.................$ 25.37 6.55
Piledriver.......................$ 23.87 7.10
ELEC0026-003 09/03/2007
Rates Fringes
Communication Technician.........$ 23.15 3%+6.87
SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).
WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside
Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.
ELEC0026-015 06/04/2007
Rates Fringes
Electricians (Excluding
Communication Low Voltage
Wiring and Lightning
Protection Wiring)...............$ 33.45 11.35+a
a. PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin
Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after
Thanksgiving Day and Christmas Day.
* ENGI0077-012 05/01/2008
Rates Fringes
Power equipment operators:
Cranes (35 tons and above)..$ 28.74 7.17+a
Forklifts...................$ 21.00 7.17+a
a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration
Day, Independence Day, Labor Day,Martin Luther King's
Birthday, Veterans' Day, Thanksgiving Day, Friday after
Thanksgiving, and Christmas Day.
IRON0005-001 06/01/2007
Rates Fringes
Ironworkers:
Structural, Ornamental and
Chain Link Fence............$ 26.73 11.995
IRON0201-003 05/01/2008
Rates Fringes
Ironworker (Reinforcing).........$ 26.15 12.08
LABO0657-001 06/01/2007
Rates Fringes
Laborer:Skilled..................$ 18.81 4.29
FOOTNOTE: Potmen, power tool operator, small machine operator, concrete labor including concrete preparation, signalmen, laser beam operator, waterproofer, open caisson, test pit, underpinnig, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers (tile laid on road construction projects ONLY), operators of jackhammer, paving breakers, spaders or any machine that does the same general type of work, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline builders of trestle scaffolds over one tier high and sand blaster, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen.
LABO0657-009 06/01/2007
Rates Fringes
Laborers:
Mason Tenders, Brick........$ 14.14 4.29
PAIN0051-004 06/01/2007
Rates Fringes
Glaziers
Contracts $2 million and under.......................$ 24.12 7.46
Contracts over $2 million...$ 26.34 7.46
PAIN0051-010 06/01/2007
Rates Fringes
Painters:
Brush, Roller, Spray and
Drywall Finisher............$ 23.31 7.31
PLAS0891-003 05/01/2007
Rates Fringes
Cement Mason/Concrete Finisher...$ 26.15 6.01
PLUM0005-004 10/21/2007
Rates Fringes
Plumbers
Apartment Buildings over 4 stories (except hotels).
schools, colleges and speculative office buiidings, strip shopping centers. churches, water coolers, room air conditioning units, appliances, packaged ice machines and light commercial refrigeration and/or airconditioning;
systems serving a single business in a single story building and not to exceed
5 h.p. or tons, self-contained package unit up to and including 5 h.p. or tons........................$ 21.54 8.33+a
ALL Other Work..............$ 33.92 12.94+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's
Day, Martin Luther King's Birthday, Memorial Day and the
Fourth of July.
PLUM0602-001 11/01/2007
Rates Fringes
Steamfitter, Refrigeration &
Air Conditioning Mechanic........$ 33.27 13.57+a
a. PAID HOLIDAYS: New Year's Day,Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
ROOF0030-014 05/01/2007
Rates Fringes
Roofers..........................$ 23.80 7.86
SFMD0669-002 04/01/2008
Rates Fringes
Sprinkler Fitters................$ 29.35 14.30
SHEE0100-002 07/01/2007
Rates Fringes
Sheet Metal Worker (Including
HVAC Duct Work)..................$ 31.54 11.65
SUMD2000-004 05/12/2000
Rates Fringes
Laborers:
Unskilled...................$ 11.02 1.39
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION