The document is a Request for Information (RFI) Log related to the HVAC Cooling Tower Chemical Sampling and Treatment solicitation for Scott AFB. The RFI log contains 12 detailed questions and responses covering technical specifications for water treatment, including clarifications on chemical treatment volumes, measurement units, testing frequencies, and system characteristics. Key technical details include treating 10 million gallons of makeup water, testing 124 closed loop systems (56 chilled and 68 hot) across 67 facilities, and servicing 13 cooling towers with 11 sumps located at 8 different facilities.

The solicitation, issued by the Department of the Air Force Air Mobility Command, seeks a contractor to provide labor, tools, chemicals, and equipment for water/chemical monitoring, sampling, and treatment of HVAC systems. Pricing discussions focus on cost per 1,000 gallons of chemical treatment, with responses indicating flexibility in measurement and testing approaches. Notable dates include a potential award timeframe of January 2026, with a quote expiration date of 31 January 2026. The RFI responses provide technical nuances such as preferred chemical forms (propylene glycol with nitrite ions) and clarification on testing frequencies for closed loop and cooling tower systems.

View the file

Other files

File Type Posted
RFQ ATT 3_CLIN Pricing Sheet- HVAC Chemical Service 9 Dec 25.xlsx XLSX spreadsheet
RFQ_FY 26 HVAC Cooling Tower_ Water Sampling_09 Dec 2025.pdf PDF
RFQ ATT 3_CLIN Pricing Sheet- HVAC Chemical Service 9 Dec 25.xlsx XLSX spreadsheet
RFQ - FY26 HVAC Cooling Tower Water Sampling - Scott AFB 09 Dec 2025.pdf PDF
RFQ ATT 3_CLIN Pricing Sheet- New HVAC Chemical Service 5 Dec 25.xlsx XLSX spreadsheet
RFQ ATT 3_CLIN Pricing Sheet- New HVAC Chemical Service 5 Dec 25.xlsx XLSX spreadsheet
RFQ ATT 1_SOW HVAC Chemical Testing Treatment 5 Dec 25.pdf PDF
RFQ - FY26 HVAC Cooling Tower Water Sampling - Scott AFB 09 Dec 2025.pdf PDF
RFQ ATT 6 - RFI Log QA_12-9-2025.xlsx XLSX spreadsheet
Site Visit Sign_HVAC Cooling Towers_12-4-2025.pdf PDF
RFQ ATT 6 - RFI Log QA_12-3-2025.xlsx XLSX spreadsheet
RFQ ATT 5_Solicitation Provisions and Contract Clauses.pdf PDF
RFQ ATT 6 - Previous RFI Log QA.xlsx XLSX spreadsheet
RFQ - FY26 HVAC Cooling Tower Water Sampling - Scott AFB.pdf PDF
RFQ ATT 3_CLIN Pricing Sheet- New HVAC Chemical Service 19 Nov 25.xlsx XLSX spreadsheet
RFQ ATT 4_Past Performance Information Sheet.docx DOCX document
RFQ ATT 2_SOW Attachment 1 24 Jul 25.xlsx XLSX spreadsheet
RFQ ATT 1_SOW HVAC Chemical Testing Treatment 19 Nov 25.pdf PDF
RFI Attachment 2_July-Aug Make up readings.xlsx XLSX spreadsheet
Amendment 03 to RFQ_09-11-2025.pdf PDF
RFI_HVAC Cooling Tower and Water Sampling_9-11-2025.xlsx XLSX spreadsheet
RFQ_FY 26 HVAC Cooling Tower Water Sampling_9-09-2025.pdf PDF
Att 3_Pricing Worksheet_9-9-2025.xlsx XLSX spreadsheet
Amendment 02 to RFQ_09-09-2025.pdf PDF
RFI_HVAC Cooling Tower and Water Sampling_9-9-2025.xlsx XLSX spreadsheet
RFI_HVAC Cooling Tower and Water Sampling_9-8-2025.xlsx XLSX spreadsheet
Amendment 01 to RFQ_09-08-2025.pdf PDF
RFI Attachment 1_AM68.jpg JPG image
RFI Attachment 2_July-Aug Make up readings.xlsx XLSX spreadsheet
RFQ_FY 26 HVAC Cooling Tower and Water Sampling.pdf PDF
RFQ_FY 26 HVAC Cooling Tower and Water Sampling_.pdf PDF
Att 5_Solicitation Provisions and Contract Clauses.pdf PDF
Att 4_Past Performance Information Sheet.docx DOCX document
Att 4_Solicitation Provisions and Contract Clauses.pdf PDF
Att 2_SOW Attachment 1 24 Jul 25.xlsx XLSX spreadsheet
RFQ_FY 26 HVAC Cooling Tower and Water Sampling.pdf PDF
Att 1_SOW HVAC Chemical Testing and Treatment 13 Aug 25.pdf PDF
Att 3_Pricing Worksheet_8-5-2025.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Requests For Information (RFIs) - HVAC Cooling Towers & Water Sampling
RFI #Date Recv'dDate Sent to Customer/Technical ExpertRFIResponseDate Answered
117-Nov-2517-Nov-25On the far right column, it states "Treat 10M GAL/MU". Does the "M" mean Thousands or Millions of make-up water?"M" means Million. The unit of measure is one thousand (K) gallons, the historical is to treat 10 million (M) gallons. 1,000 X 10,000 = 10M gallons. What we are looking for is what are you going to charge to treat with respective chemical per 1,000 gal. We are doing it this way because only one solicitor can actually provide a price per gallon of their respective chemical. Unit of measure X price per unit X Quantity = Year Amount18-Nov-25
217-Nov-2517-Nov-25Typically, cooling tower cost would be $/1,000 gal MU. If $/10,000 gal MU, then make sure cost is to third decimal?"M" means Million. The unit of measure is one thousand (K) gallons, the historical is to treat 10 million (M) gallons. 1,000 X 10,000 = 10M gallons. What we are looking for is what are you going to charge to treat with respective chemical per 1,000 gal. We are doing it this way because only one solicitor can actually provide a price per gallon of their respective chemical. Unit of measure X price per unit X Quantity = Year Amount18-Nov-25
317-Nov-2517-Nov-25Biocides, oxidizing and non-oxidizing are fed based on cooling tower system not MU volume. So, an accurate biocide quote will need cooling tower system volume, total gallons.
a.See to CLIN 0003, 0004, Question 1.B, 1.C, 2.B, 2.C.We do not have this information, historically the contractor performing the services has been able to provide a cost per gallon of chemical provided to maintain acceptable reading limits.18-Nov-25
417-Nov-2517-Nov-25Closed loop quantity, 496, means testing all closed loops, hot and cold, 4 times per year. Typically, cold and hot loops are tested 2 times per season so, essentially loops are being tested each quarter. For example, hot loops in 1st and 4th and cold loops in 2nd and 3rd Quarters. Please clarify?Loop quantity has changed to 248 annually. Please see SOW (18 Nov 2025) para 4.1 & 4.2 for specifics.18-Nov-25
517-Nov-2517-Nov-25Closed loop treatment for systems without glycol specifies it must be NO2 not Na2NO2. However, NO2 is a gas, NaNO2 is the liquid form typically used for closed loop treatment. Should we assume the liquid form will be acceptable?We want propylene glycol that is inhibited with Nitrite ions. We do not want salt sodium nitrite.18-Nov-25
62-Dec-252-Dec-25Of the (124) total closed loop systems, how may are ‘inhibited glycol’ loops?Approx. 583-Dec-25
72-Dec-252-Dec-25What is the average operational ‘Cycles of Concentration’ for the (13) cooling tower systems?Unknown3-Dec-25
82-Dec-252-Dec-25Do you have the water volume for each closed loop systems?No3-Dec-25
92-Dec-252-Dec-25Could you please post the site visit attendee’s list?We will post site visit attendee's list after the site visit.2-Dec-25
102-Dec-252-Dec-25Can you provide the anticipated award date and start date?Start date is the date of award. We cannot provide an anticipated award date, but our hope would be by 1 Jan 2026.2-Dec-25
112-Dec-252-Dec-25Can you verify the Quote expiration date?31 Janurary 20262-Dec-25