09F-_Electrical_SOW.pdf

PDF 516 KB Posted

Attached to
FY19 Multiple Award Paving Contract (MAPC) Federal contract opportunity
Solicitation number
FA440719R0002
Issued by
Department of the Air Force Air Mobility Command

About this file

This statement of work outlines electrical installation requirements for three gate locations at Building 40 on the Symington Drive facility. New breakers will be installed in existing panels to provide power from the panels to the gate locations via PVC conduit buried at least 18 inches underground. Approximately 190 feet of conduit is specified from Building 51 to the first gate on the south end of Building 40, with 20 additional feet to the second gate. Another 40 feet of conduit is outlined from the generator enclosure at Building 4 to the first gate on the north end, plus 20 feet to the second gate. Interior conduit running over 90 feet is also detailed from the basement panel in the east wing of Building 40 to the exterior wall, then 40 feet of buried conduit to the first gate and 20 feet to the second gate in the east courtyard. All work must comply with NFPA 70 standards and the contractor will provide necessary conduit supports and fittings for complete installations.

The related federal contract opportunity is a multiple award task order contract solicitation issued by the Air Mobility Command seeking pavement services. The solicitation, along with amendments one and two, contain further requirement details.

Solicitation Attch 09F- Electrical SOW

View the file

Other files for this federal contract opportunity

Other files attached to FY19 Multiple Award Paving Contract (MAPC), newest first.
File Type Posted
12-_RFI_Answer_Log_v2_10-30-19.pdf PDF
09G-_SG1420_Security_Gate_O&M_Manual.pdf PDF
09-_SOW_Sample_Project_v2.pdf PDF
09A-_Map-Repair,_Reconstruct_Symington_Dr-McClelland_St_v2.pdf PDF
09E-_Price_Schedule_v2.pdf PDF
Solicitation_Amendment_FA440719RA0020002_SF_30.pdf PDF
Solicitation_Amendment_-_FA440719RA0020002.pdf PDF
12-RFI_Answer_Log_10-15-19.pdf PDF
Solicitation_Amendment_FA440719RA0020001.pdf PDF
10-PPI_v2.pdf PDF
01-1442_Continuation_Sheet_Final_v2.pdf PDF
02-MAPC_Gen_Rqmts_Final.pdf PDF
11-PPQ.pdf PDF
03_-_IL20190017_WDOL_Heavy_and_Highway.pdf PDF
09B-_Map_Stormwater_North.pdf PDF
09A-_Map-Repair,_Reconstruct_Symington_Dr-McClelland_St.pdf PDF
06-SAFB_Climatic_Data.pdf PDF
08-TO_Procedures_Final.pdf PDF
01-1442_Continuation_Sheet_Final.pdf PDF
09E-_Price_Schedule_Final.pdf PDF
04-NAF_General_Procedures.pdf PDF
09D-_Map_Stormwater_South.pdf PDF
10-PPI.pdf PDF
09-_SOW_Sample_Project_Final.pdf PDF
09C-_Urban_Forest_Mgt_Plan_2010_pg_24-25.pdf PDF
Solicitation_-_FA440719RA002.pdf PDF
05-SAFB_Map.pdf PDF
FBO_-_Pre-solicitation_Notice.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Symington Drive Bldg 40 South End Gates. (1)

a. Provide new 1P-20 Amp Breaker in existing bldg. 51 panel on South End of Building 40.

b. Provide approximately 10’ of ¾” EMT and (2)-#10 THWN and (1)-#12 gnd from panel through exterior west well of bldg. 51.

c. Provide 3/4” PVC Sch 40 conduit and (2)-#10 THWN and (1)-#12 gnd with minimal 18” burial depth from bldg. 51 to Symington drive to 1st gate location.

Approximate distance is 190’.

d. Provide 3/4” PVC Sch 40 conduit and (2)-#10 THWN and (1)-#12 gnd with minimal 18” burial depth from 1st gate location to 2nd gate location. Approximate distance is 20’

2. Symington Drive Bldg 40 North End Gates. (2)

a. Provide new 1P-20 Amp Breaker in existing bldg. Bldg 4 Exterior Generator Enclosure panel on East End of Building 4.

b. Provide approximately 10’ of ¾” EMT and (2)-#10 THWN and (1)-#12 gnd from panel through exterior west well of bldg. Generator Enclosure.

minimal 18” burial depth from Generator to Symington drive to 1st gate location.

Approximate distance is 40’.

3. Bldg 40 East Courtyard Gates. (3)

a. Provide new 1P-20 Amp Breaker in existing bldg. Bldg 40, basement, East wing interior panel.

b. Provide approximately 90’ of ¾” EMT and (2)-#10 THWN and (1)-#12 gnd from panel and above lay-in ceiling to building 40 North-East Wing through exterior wall.

minimal 18” burial depth from exterior wall to Symington drive to 1st gate location. Approximate distance is 40’.

General Note: All work shall be in accordance with latest version of NFPA 70.

Contractor to provide all required conduit support and fittings for a complete install.