Attachment_8_-_Schedule_of_Submittals.xlsx
XLSX spreadsheet 41 KB Posted
- Attached to
- Taxiway Repair Project (Construction) Federal contract opportunity
- Solicitation number
- FA3099-18-R-0013
About this file
Solicitation Attachment 8
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
SUBMITTAL REGISTER CONTRACT NO.
FA3099-17-F-0044
| TITLE AND LOCATION | ||||
| Repair Taxiway Bravo | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | REFERENCE (ATTACHMENT 2 - SPECIFICATIONS UNLESS OTHERWISE STATED) | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMISSION DATE | SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 02 41 00 | SD-01 Preconstruction Submittals | NLT 30 Days after NTP 1 | |||||||||||||||||
| Demolition Plan | 1.2.1 | G | |||||||||||||||||
| Existing Conditions | 1.10 | ||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Notification | 1.6 | G | |||||||||||||||||
| SD-11 Closeout Submittals | NLT 14 Days after Construction ends | ||||||||||||||||||
| Receipts | |||||||||||||||||||
| 03 30 53 | SD-02 Shop Drawings | NLT 30 Days after NTP 1 | |||||||||||||||||
| Installation Drawings | 1.5 | G | |||||||||||||||||
| SD-03 Product Data | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Air-Entraining Admixture | 2.2.3.1 | ||||||||||||||||||
| Accelerating Admixture | |||||||||||||||||||
| Water-Reducing or Retarding | 2.2.3.2 | ||||||||||||||||||
| Admixture | |||||||||||||||||||
| Curing Materials | 2.2.7 | ||||||||||||||||||
| Expansion Joint Filler Strips, | |||||||||||||||||||
| Premolded | |||||||||||||||||||
| Joint Sealants - Field Molded | |||||||||||||||||||
| Sealants | |||||||||||||||||||
| Waterstops | |||||||||||||||||||
| Chemical Floor Hardener | |||||||||||||||||||
| Batching and Mixing Equipment | |||||||||||||||||||
| Conveying and Placing Concrete | 3.2 | ||||||||||||||||||
| Formwork | |||||||||||||||||||
| Mix Design Data | 2.3 | G | |||||||||||||||||
| Ready-Mix Concrete | 2.3 | ||||||||||||||||||
| 03 30 53 | Curing Compound | 2.4.1 | |||||||||||||||||
| Mechanical Reinforcing Bar | 2.2.5 | ||||||||||||||||||
| Connectors | |||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Aggregates | 2.2.2 | ||||||||||||||||||
| Concrete Mixture Proportions | 2.1.3 | G | |||||||||||||||||
| Measurement of Floor | |||||||||||||||||||
| Tolerances | |||||||||||||||||||
| Compressive Strength Testing | 3.8.3 | G | |||||||||||||||||
| Slump | 3.8.3 | G | |||||||||||||||||
| Air Content | 3.8.3 | ||||||||||||||||||
| Water | 2.2.4 | ||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Cementitious Materials | 2.2.1 | ||||||||||||||||||
| Pozzolan | |||||||||||||||||||
| CPG for recycled materials or | 1.5.1 | ||||||||||||||||||
| appropriate Waiver Form | |||||||||||||||||||
| Aggregates | 2.2.2 | ||||||||||||||||||
| Delivery Tickets | 2.3 | ||||||||||||||||||
| SD-08 Manufacturer’s Instructions | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Chemical Floor Hardener | |||||||||||||||||||
| Curing Compound | 2.4.1 | ||||||||||||||||||
| 03 42 13.00 10 | SD-01 Preconstruction Submittals | NLT 30 Days after NTP 1 | |||||||||||||||||
| Quality Control Procedures | 1.3.2.2 | ||||||||||||||||||
| SD-02 Shop Drawings | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Standard Precast Units | 2.1.1 | G | |||||||||||||||||
| 03 42 13.00 10 | Custom-Made Precast Units | 2.1.2 | G | ||||||||||||||||
| Special Finishes | 3.2.4.3 | ||||||||||||||||||
| SD-03 Product Data | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Standard Precast Units | 2.1.1 | ||||||||||||||||||
| Proprietary Precast Units | 2.1.3 | ||||||||||||||||||
| Embedded Items | 3.1.3 | ||||||||||||||||||
| Accessories | 2.2.4 | ||||||||||||||||||
| SD-05 Design Data | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Design Calculations | 2.1.2 | G | |||||||||||||||||
| Concrete Mix Proportions | 2.1.5.1 | ||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Test Reports | 1.3.2.4 | ||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Quality Control Procedures | 1.3.2.2 | ||||||||||||||||||
| SD-11 Closeout Submittals | NLT 14 Days after Construction ends | ||||||||||||||||||
| Recycled content for fly ash and | S | ||||||||||||||||||
| pozzolan | |||||||||||||||||||
| Recycled content for Ground Iron | S | ||||||||||||||||||
| Blast-Furnace Slag | |||||||||||||||||||
| Recycled content for Silica Fume | S | ||||||||||||||||||
| Recycled content for Synthetic | S | ||||||||||||||||||
| Fiber Reinforcement | |||||||||||||||||||
| Recycled content for steel | S | ||||||||||||||||||
| 03 99 99 | SD-02 Shop Drawings | NLT 30 Days after NTP 1 | |||||||||||||||||
| Installation Drawings | 1.4 | G | |||||||||||||||||
| SD-03 Product Data | NLT 30 Days after NTP 1 | ||||||||||||||||||
| 03 99 99 | Air-Entraining Admixture | 2.2.3.1 | |||||||||||||||||
| Water-Reducing or Retarding | 2.2.3.2 | ||||||||||||||||||
| Admixture | |||||||||||||||||||
| Batching and Mixing Equipment | |||||||||||||||||||
| Conveying and Placing Concrete | |||||||||||||||||||
| Mix Design Data | 2.3 | G | |||||||||||||||||
| Ready-Mix Concrete | |||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Aggregates | |||||||||||||||||||
| Concrete Mixture Proportions | G | ||||||||||||||||||
| Compressive Strength Testing | 3.4.3 | G | |||||||||||||||||
| Slump | G | ||||||||||||||||||
| Air Content | 3.4.3 | ||||||||||||||||||
| Water | 2.2.4 | ||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Cementitious Materials | 2.2.1 | ||||||||||||||||||
| Pozzolan | |||||||||||||||||||
| Aggregates | |||||||||||||||||||
| Delivery Tickets | 2.3 | ||||||||||||||||||
| 26 05 13.00 40 | SD-03 Product Data | NLT 30 Days after NTP 1 | |||||||||||||||||
| Single-Conductor Shielded | 2.2.1 | G | |||||||||||||||||
| Cables | |||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Dielectric-Absorption Tests | 3.2 | ||||||||||||||||||
| Medium-Voltage Tests | 3.2 | ||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| 26 05 13.00 40 | Lead Sheath | ||||||||||||||||||
| Flammability | |||||||||||||||||||
| Minimum Bending Radius | 3.1.4 | ||||||||||||||||||
| Medium-Voltage Tests | 3.2 | ||||||||||||||||||
| Dielectric Absorption Tests | 3.2 | ||||||||||||||||||
| Cable Splicers | 1.4 | ||||||||||||||||||
| SD-08 Manufacturer’s Instructions | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Medium-Voltage Power Cables | 3.3 | ||||||||||||||||||
| Pothead Terminations | 3.3 | ||||||||||||||||||
| 26 13 01 | SD-02 Shop Drawings | NLT 30 Days after NTP 1 | |||||||||||||||||
| Switchgear Drawings | 1.3.1 | G | |||||||||||||||||
| SD-03 Product Data | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Fuse Time-Current Characteristic | 1.3.3 | G | |||||||||||||||||
| Curves | |||||||||||||||||||
| Air Insulated Pad-mounted | G | ||||||||||||||||||
| Switchgear | |||||||||||||||||||
| Insulated High Voltage | 2.2 | G | |||||||||||||||||
| Connectors | |||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Acceptance Checks and Tests | 3.4.1 | G | |||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Paint Coating System | 1.3.2 | G | |||||||||||||||||
| SD-09 Manufacturer’s Field | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Reports | |||||||||||||||||||
| Switchgear design and | 2.4.1 | G | |||||||||||||||||
| production tests | |||||||||||||||||||
| 26 13 01 | SD-10 Operation and Maintenance | NLT 14 Days after Constructoin Ends | |||||||||||||||||
| Data | |||||||||||||||||||
| Air Insulated Pad-Mounted | G | ||||||||||||||||||
| Switch Operation and | |||||||||||||||||||
| Maintenance | |||||||||||||||||||
| 26 56 20.00 10 | SD-02 Shop Drawings | NLT 30 Days after NTP 1 | |||||||||||||||||
| Lighting and Visual Navigation | 2.1 | G | |||||||||||||||||
| Aids | |||||||||||||||||||
| As-Built Drawings | 1.4.5 | ||||||||||||||||||
| SD-03 Product Data | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Materials and Equipment | 2.2 | G | |||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Field Quality Control | 3.20 | ||||||||||||||||||
| Visual Inspection | 3.20.2 | ||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Qualifications | 1.4.2 | ||||||||||||||||||
| Materials and Equipment | 2.2 | ||||||||||||||||||
| SD-10 Operation and Maintenance | NLT 14 Days after Constructoin Ends | ||||||||||||||||||
| Data | |||||||||||||||||||
| Operation and Maintenance | G | ||||||||||||||||||
| Procedures | |||||||||||||||||||
| 31 00 00 | SD-01 Preconstruction Submittals | NLT 30 Days after NTP 1 | |||||||||||||||||
| Shoring | G | ||||||||||||||||||
| Dewatering Work Plan | G | ||||||||||||||||||
| SD-03 Product Data | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Utilization of Excavated Materials | 3.8 | G | |||||||||||||||||
| 31 00 00 | Rock Excavation | 1.5.1.2 | |||||||||||||||||
| Opening of any Excavation or | |||||||||||||||||||
| Borrow Pit | |||||||||||||||||||
| Shoulder Construction | |||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Testing | 3.17 | ||||||||||||||||||
| Borrow Site Testing | 2.1 | ||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Testing | 3.17 | ||||||||||||||||||
| 32 01 19 | SD-03 Product Data | NLT 30 Days after NTP 1 | |||||||||||||||||
| Manufacturer's | G | ||||||||||||||||||
| Recommendations | |||||||||||||||||||
| Equipment | 3.1 | ||||||||||||||||||
| SD-04 Samples | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Materials | 1.3.1 | G | |||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Certified Copies of the Test | 1.3.1 | G | |||||||||||||||||
| Reports | |||||||||||||||||||
| 32 11 20 | SD-03 Product Data | NLT 30 Days after NTP 1 | |||||||||||||||||
| Plant, Equipment, and Tools | 1.4 | G | |||||||||||||||||
| Waybills and Delivery Tickets | |||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Initial Tests | 2.2.1 | G | |||||||||||||||||
| In-Place Tests | 3.12.1 | G | |||||||||||||||||
| 32 11 23 | SD-03 Product Data | NLT 30 Days after NTP 1 | |||||||||||||||||
| Plant, Equipment, and Tools | 1.4 | G | |||||||||||||||||
| 32 11 23 | Waybills and Delivery Tickets | ||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Initial Tests | 2.3.1 | G | |||||||||||||||||
| In-Place Tests | 3.13.1 | G | |||||||||||||||||
| 32 11 23.23 | SD-03 Product Data | NLT 30 Days after NTP 1 | |||||||||||||||||
| Plants, Equipment, and Tools | 1.3.1 | G | |||||||||||||||||
| Waybills and Delivery Tickets | |||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Initial Tests | 1.4.3.1 | G | |||||||||||||||||
| In-Place Tests | 1.4.3.2 | G | |||||||||||||||||
| Test Section Construction Report | 3.6.7 | ||||||||||||||||||
| 32 11 29 | SD-03 Product Data | NLT 30 Days after NTP 1 | |||||||||||||||||
| Plant, Equipment, Machines, and | 2.1 | G | |||||||||||||||||
| Tools | |||||||||||||||||||
| Mix Design | 2.4 | G | |||||||||||||||||
| Waybills and Delivery Tickets | |||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Sampling and Testing | 3.5 | ||||||||||||||||||
| Field Density | 3.6.3 | ||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Bituminous Material | 2.2.2 | ||||||||||||||||||
| Lime | 2.2.1 | ||||||||||||||||||
| Laboratory | |||||||||||||||||||
| 32 12 13 | SD-03 Product Data | NLT 30 Days after NTP 1 | |||||||||||||||||
| Waybills and Delivery Tickets | |||||||||||||||||||
| Local/Regional Materials | |||||||||||||||||||
| 32 12 13 | SD-06 Test Reports | NLT 3 Days after Testing | |||||||||||||||||
| Sampling and Testing | 3.7 | ||||||||||||||||||
| 32 12 17 | SD-04 Samples | NLT 30 Days after NTP 1 | |||||||||||||||||
| Bituminous pavement | 1.3.2 | ||||||||||||||||||
| SD-05 Design Data | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Job-mix formula | 1.3.3 | ||||||||||||||||||
| ASPHALT CEMENT BINDER | 2.2 | ||||||||||||||||||
| MIX DESIGN | 2.3 | ||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Specific gravity test of asphalt | 2.5.1 | ||||||||||||||||||
| Coarse aggregate tests | 2.5.1 | ||||||||||||||||||
| Weight of slag test | 2.5.1 | ||||||||||||||||||
| Percent of crushed pieces in | 2.5.1 | ||||||||||||||||||
| gravel | |||||||||||||||||||
| Fine aggregate tests | 2.5.1 | ||||||||||||||||||
| Specific gravity of mineral filler | 2.5.1 | ||||||||||||||||||
| Bituminous mixture tests | 2.5.1 | ||||||||||||||||||
| Aggregates tests | 3.5.2.1 | ||||||||||||||||||
| Bituminous mix tests | 3.5.2.2 | ||||||||||||||||||
| Pavement courses | 3.5.2.3 | ||||||||||||||||||
| 32 13 14.13 | SD-03 Product Data | NLT 30 Days after NTP 1 | |||||||||||||||||
| Diamond Grinding Plan | 2.1.7 | G | |||||||||||||||||
| Dowels | 2.9.1 | G | |||||||||||||||||
| Dowel Bar Assemblies | 2.9.2 | G | |||||||||||||||||
| Equipment | 2.11 | ||||||||||||||||||
| Proposed Techniques | 3.1.2 | G | |||||||||||||||||
| 32 13 14.13 | SD-05 Design Data | NLT 30 Days after NTP 1 | |||||||||||||||||
| Preliminary Proposed | 2.13.2 | G | |||||||||||||||||
| Proportioning | |||||||||||||||||||
| Proportioning Studies | 2.13.2 | G | |||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Batch Plant Manufacturer's | 1.4.1 | G | |||||||||||||||||
| Inspection Report | |||||||||||||||||||
| Slipform Paver Manufacturer's | 1.4.1 | G | |||||||||||||||||
| Inspection Report | |||||||||||||||||||
| Sampling and Testing | 2.1.4.1 | G | |||||||||||||||||
| Diamond Grinding of PCC | 2.1.7 | G | |||||||||||||||||
| Surfaces | |||||||||||||||||||
| Mixer Performance (Uniformity) | 2.11.2.3 | G | |||||||||||||||||
| Testing | |||||||||||||||||||
| Repair Recommendations Plan | 3.9.1 | G | |||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Contractor Quality Control Staff | 1.4.1 | G | |||||||||||||||||
| Laboratory Accreditation and | 1.4.3 | ||||||||||||||||||
| Validation | |||||||||||||||||||
| Commercial Laboratory | 1.4.3.3 | G | |||||||||||||||||
| NRMCA Certificate of | 2.11 | ||||||||||||||||||
| Conformance | |||||||||||||||||||
| 32 17 23 | SD-03 Product Data | NLT 30 Days after NTP 1 | |||||||||||||||||
| Surface Preparation Equipment | G | ||||||||||||||||||
| List | |||||||||||||||||||
| Application Equipment List | 2.1.1 | G | |||||||||||||||||
| 32 17 23 | Exterior Surface Preparation | 3.2 | |||||||||||||||||
| Safety Data Sheets | 1.3.1 | G | |||||||||||||||||
| Reflective media for airfields | 2.2.2.1 | G | |||||||||||||||||
| Reflective media for roads | G | ||||||||||||||||||
| Waterborne Paint | 2.2.1 | G | |||||||||||||||||
| Solventborne Paint | G | ||||||||||||||||||
| Thermoplastic compound | G | ||||||||||||||||||
| Raised Pavement Markers | G | ||||||||||||||||||
| Primers and Adhesives | |||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Reflective Media for Airfields | 2.2.2.1 | G | |||||||||||||||||
| Reflective Media for Roads | G | ||||||||||||||||||
| Waterborne Paint | 2.2.1 | G | |||||||||||||||||
| Solventborne Paint | G | ||||||||||||||||||
| High Build Acrylic Coating | G | ||||||||||||||||||
| (HBAC) | |||||||||||||||||||
| Thermoplastic Compound | G | ||||||||||||||||||
| Raised Pavement Markers | G | ||||||||||||||||||
| Primers and Adhesives | |||||||||||||||||||
| Test Reports | 3.4.1 | ||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Qualifications | G | ||||||||||||||||||
| Reflective Media for Airfields | 2.2.2.1 | ||||||||||||||||||
| Reflective Media for Roads | |||||||||||||||||||
| Waterborne Paint | 2.2.1 | ||||||||||||||||||
| Solventborne Paint | |||||||||||||||||||
| 32 17 23 | Volatile Organic Compound | 1.3.1 | G | ||||||||||||||||
| Thermoplastic Compound | |||||||||||||||||||
| SD-08 Manufacturer’s Instructions | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Waterborne Paint | 2.2.1 | G | |||||||||||||||||
| Solventborne Paint | G | ||||||||||||||||||
| Thermoplastic Compound | G | ||||||||||||||||||
| 32 92 19 | SD-03 Product Data | NLT 30 Days after NTP 1 | |||||||||||||||||
| Wood Cellulose Fiber Mulch | 2.4.2 | ||||||||||||||||||
| Fertilizer | 2.3 | ||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing | ||||||||||||||||||
| Topsoil Composition Tests | 2.2.2 | ||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Seed | 2.1 | ||||||||||||||||||
| SD-08 Manufacturer’s Instructions | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Erosion Control Materials | 2.6 | ||||||||||||||||||
| 33 05 23.13 | SD-01 Preconstruction Submittals | NLT 30 Days after NTP 1 | |||||||||||||||||
| Statement of Qualifications and | 1.4 | G | |||||||||||||||||
| Records | |||||||||||||||||||
| SD-03 Product Data | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Polyethylene Pipe | 1.4 | G | |||||||||||||||||
| Drilling Fluids | 1.4 | G | |||||||||||||||||
| Additives | 1.4 | G | |||||||||||||||||
| Mixtures | 1.4 | G | |||||||||||||||||
| Safety Data Sheets | 1.4 | ||||||||||||||||||
| SD-05 Design Data | NLT 30 Days after NTP 1 | ||||||||||||||||||
| Secondary Containment Plan | G | ||||||||||||||||||
| 33 05 23.13 | SD-06 Test Reports | NLT 3 Days after Testing | |||||||||||||||||
| Soil Test Data | 1.4 | ||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Drill Rod | 2.1.1 | ||||||||||||||||||
| SD-11 Closeout Submittals | NLT 14 Days after Construction ends | ||||||||||||||||||
| Record Drawings | 3.3 | ||||||||||||||||||
| Complete Work Logs of Guided | 3.3 | ||||||||||||||||||
| Directional Drill Operations | |||||||||||||||||||
| 33 40 00 | SD-04 Samples | NLT 30 Days after NTP 1 | |||||||||||||||||
| Pipe for Culverts and Storm | 2.1 | ||||||||||||||||||
| Drains | |||||||||||||||||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | ||||||||||||||||||
| Resin Certification | |||||||||||||||||||
| Oil Resistant Gasket | |||||||||||||||||||
| Leakage Test | |||||||||||||||||||
| Hydrostatic Test on Watertight | 3.8.1.1 | ||||||||||||||||||
| Joints | |||||||||||||||||||
| Determination of Density | 3.8.1.2 | ||||||||||||||||||
| Frame and Cover for Gratings | 2.2.4 | ||||||||||||||||||
| Post-Installation Inspection | 3.8.2.1.3 | ||||||||||||||||||
| Report | |||||||||||||||||||
| 33 46 16 | SD-04 Samples | NLT 30 Days after NTP 1 | |||||||||||||||||
| Geotextile | 2.2 | ||||||||||||||||||
| Pipe and Pipe Fittings | 2.1 | ||||||||||||||||||
| SD-06 Test Reports | NLT 3 Days after Testing |
| 33 46 16 | Geotextile JP-4 Fuel Resistance | |||
| Test | ||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | |||
| Geotextile | 2.2 | |||
| Pipe and Pipe Fittings | 2.1 | |||
| 33 71 02 | SD-02 Shop Drawings | |||
| Precast underground structures | 1.4.1 | G | ||
| SD-03 Product Data | NLT 30 Days after NTP 1 | |||
| Medium voltage cable | 2.2 | G | ||
| Medium voltage cable joints | G | |||
| Medium voltage cable | G | |||
| terminations | ||||
| Live end caps | G | |||
| Precast concrete structures | 2.7.1.1 | G | ||
| Sealing Material | 2.7.1.4 | |||
| Pulling-In Irons | 3.4.2 | |||
| Manhole frames and covers | 2.7.2 | G | ||
| Handhole frames and covers | 2.7.3 | G | ||
| Frames and Covers for Airfield | 2.7.4 | G | ||
| Facilities | ||||
| Ductile Iron Frames and Covers | 2.7.5 | G | ||
| for Airfield Facilities | ||||
| Composite/fiberglass handholes | 2.7.7 | G | ||
| Cable supports | 2.8 | G | ||
| SD-06 Test Reports | NLT 3 Days after Testing | |||
| 33 71 02 | Medium voltage cable | 2.12.2 | G | |
| qualification and production tests | ||||
| Field Acceptance Checks and | 3.16.1 | G | ||
| Tests | ||||
| Arc-proofing test | 2.12.1 | G | ||
| Cable Installation Plan and | 3.3 | G | ||
| Procedure | ||||
| SD-07 Certificates | No Less Than 10 Days Before Construction | |||
| Cable splicer/terminator | 1.4.2 | G | ||
| Cable Installer Qualifications | 1.4.3 | G | ||
| Certificate of Conformance | 1.4.4 | G |
| Preconstruction Submittals | ||||
| ATCH 3 LAFB Div 01 | FAA FORM 7460-1 | 4-5.2.2 | NLT 7 Days after NTP 1 | G |
| ATCH 3 LAFB Div 01 | Construction Site Plan | 7-2 | NLT 30 Days after NTP 1 | G |
| ATCH 3 LAFB Div 01 | AF Form 103 | 5-9 | No Less Than 30 Days before Construction | G |
| SOW | Progress Schedule | 4.1 | NLT 5 Days after NTP 1 | G |
| ATCH 3 LAFB Div 01 | Safety Plan | 5-3 | NLT 30 Days after NTP 1 | G |
| ATCH 3 LAFB Div 01 | Environmental Protection Plan | 8-5 | NLT 30 Days after NTP 1 | G |
| ATCH 3 LAFB Div 01 | Solid Waste Disposal Report | 8-6 | NLT 14 days after Final Inspection | G |
| ATCH 3 LAFB Div 01 | Quality Control Plan | 6-3 | NLT 30 Days after NTP 1 | G |
| ATCH 3 LAFB Div 01 | Quality Control Manager Quialifications | 6-4 | NLT 30 Days after NTP 1 | G |
| ATCH 3 LAFB Div 01 | Hazardous Waste Disposal Documentation | 8-12 | NLT 30 Days after NTP 1 | G |
| ATCH 3 LAFB Div 01 | Traffic Control Plan | 7-3 | NLT 30 Days after NTP 1 | G |
| ATCH 3 LAFB Div 01 | Airfield Driving Training Records | NLT 60 Days after NTP 1 | G | |
| Construction Submittals | ||||
| SOW | Progress Report | 4.2 | Every 14 Days | G |
| ATCH 3 LAFB Div 01 | Meeting Minutes | 3-5 | NLT 3 Days After meeting | G |
| Closeout Submittals | ||||
| ATCH 3 LAFB Div 01 | Quality Control Manager Punchlist | 9-5 | By Pre-Final Inspection | G |
| ATCH 3 LAFB Div 01 | Draft DD Form 1354 | 9-4 | By Pre-Final Inspection | G |
| ATCH 3 LAFB Div 01 | Final DD Form 1354 | 9-4 | At Final Inspection | G |
| ATCH 3 LAFB Div 01 | As-Builts | 9-2 | Every Month | G |
| ATCH 3 LAFB Div 01 | Construction Management Warranty Plan | 9-2 | NLT 7 Days after Final Inspection | G |
&"Arial Narrow,Italic"URS 60556588 &"Arial Narrow,Italic"Page &P of &N &"Arial Narrow,Italic"100% - 07/09/2018
File details come from the government source that posted it.