FY14 SABER Seed Project Statement of Objectives
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE (1)
SABER
STATEMENT OF OBJECTIVES (SOO)
REPLACE WATER MAINS SOUTH OF FORT LANCASTER
Project # JCGU-09-1010
1.0 PROJECT SCOPE: The work under this task order consists of providing all labor, tools, transportation, supplies, supervision, materials, and associated design with installing new C-900 water main lines and laterals. The work includes, but is not limited to all demolition, masonry, carpentry, plumbing, electrical, and associated tasks/crafts, required to successfully complete this project’s requirements. All work shall be accomplished in strict accordance with the Goodfellow AFB SABER Contract.
2.0 MATERIAL AND DEBRIS REMOVAL: All demolished materials and debris shall become the property of the Contractor and shall be disposed of/or recycled off base at the Contractor’s expense in accordance with local, state, and federal environmental laws and regulations.
3.0 CONTRACTOR FURNISHED MATERIALS: Contractor shall furnish all materials to accomplish the work described in this SOW.
4.0 PROJECT DESCRIPTION: The following requirements are intended to describe the general scope of the project, but in no way limits the contract with respect to the extent of the work indicated in the specifications or on the drawing, and are subject to the terms and conditions of the contract. It is the intent and meaning of this document that the Contractor shall provide new water main and laterals lines, bores under streets, connections, sidewalks, pavement/base course repairs, and establish turf that is complete with all items and appurtenances necessary, reasonably incidental, or customarily included, even though each item is not specifically called out.
DEMOLITION:
General requirements
1) Contractor shall remove topsoil where needed.
2) Contractor shall demolish concrete sidewalk where needed.
3) Contractor shall demolish concrete/asphalt paving/curbing and base course where needed.
3) Contractor shall remove landscaping rock to a site approved by the Contracting Officer for re-installation later in this project.
PAGE (2)
NEW WORK:
Architectural:
1) Contractor shall provide new hydro mulch (seeding) for excavated areas.
2) Contractor shall excavate for water mains and laterals connections.
3) Contractor shall compact trench and bedding per SABER Spec’s.
4) Contractor shall provide new sections of sidewalk/curb and gutter where removed from excavation site.
5) Contractor shall provide new landscaping felt and re-install rock where needed.
6) Contractor shall provide new base course where needed.
7) Contractor shall provide new concrete/hot-mix/hot lay asphalt for street repair where needed.
Plumbing:
1) Contractor shall provide and install new 8” C-900 pipe.
2) Contractor shall provide and install new 8” resilient wedge-gate valves with fusion epoxy coating.
3) Contractor shall provide and install sacrificial anodes to protect valves.
4) Contractor shall provide repair to irrigation systems (as needed).
5) Contractor shall provide new sand bedding for C-900 water main and laterals lines.
6) Contractor shall provide and install new C-900 lateral lines to service buildings.
7) Contractor shall provide boring under streets for new water main lines.
8) Contractor shall provide steel case for pipe borings (as needed).
9) Contractor shall provide new uni-lugs bolts on all C-900 fittings.
10) Contractor shall provide all disinfectant on new water line.
11) Contractor shall provide all water testing and test results.
PAGE (3)
12) Contractor shall provide new irrigation repairs to existing systems.
13) Contractor shall provide new water line marking tape.
14) Contractor shall provide and install new fire hydrant.
Electrical:
1) Contractor shall provide electrical wiring repair to irrigation systems (as needed).
5.0 SPECIAL CONSIDERATIONS: Work shall be performed in a manner to create minimum disturbance and inconvenience to the Goodfellow AFB, the personnel visiting, and working around the construction areas. As a minimum the Contractor shall give the Contracting Officer advance 14 day notice in writing for any utility outages affecting buildings, any part of
GAFB.
6.0 GENERAL QUALITY CONTROL TESTING: The Contractor is responsible for all quality control testing. All testing shall be performed at no additional cost to the Government.
No work requiring testing will be permitted until the required tests have been identified and approved by the Contracting Officer.
7.0 SUBMITTALS: The Contractor shall provide the following submittals to the Contracting Officer for approval/disapproval:
1) As-Built Drawings
2) C-900 pipe and connectors
3) Concrete strength/slump tests and asphalt, prime coat, and base material.
4) DD Form 1354 Checklist
5) Water Main Valves and Sacrificial Anodes
6) Fire Hydrants
7) Water Test Results
END OF STATEMENT OF OBJECTIVES